|
| 1 | TATA 207 DI BA NO : 04C-07305E/06C-079118A/ EICHER BA NO 12D-190538L, 12D-189635A, 2D-214046H AND MARUTI DZIRE BA NO 19B 131943L, TATA YODHA NYA- |
| 2 | Taking down wheel assembly carefully fromvehicleof any type as specifiedabove and transport to workshop outside IAF campus for rectification of puncher intyre and refixing the same in original position of same vehicle all as directed by Engineer-in-Charge.Note : Necessary gate pass duly signed by Engineer-in-Charge and JE shall be submitted along with RAR/FB for payment purpose. |
| 3 | Supply and fix in repairs oil filterassemblywithhose andexhaust manifold assembly with gasket as per existing model as approved by Engineer-in-Charge. |
| 4 | Supply and fix in repairs dieselfilterassemblywithhose andexhaust manifold assembly with gasket as per existing model as approved by Engineer-in-Charge. |
| 5 | Supply and fix in repairs air filterassemblywithhose andexhaust manifold assembly with gasket as per existing model as approved by Engineer-in-Charge. |
| 6 | Material and labour for checking of water level, oil level, coolant level and filled to required level and pressure of air , condition of break including water washing of vehicleall as specified and directed by Engineer-in-Charge |
| 7 | Material and labour for checking ofradiator assemblyfor properwater leakage andservicing/repairing /replacingwornout core ofradiator,radiatortopand bottom hose with new spares as per existingall as specified and directed by Engineer-in-Charge. |
| 8 | Material and labour forchecking/repairing complete brakesystem by overhauling and replacing brakelinerswithshoe, supporting plate,brake pipelines,cams, brake booster assembly, master cylinderassembly, wheelcylinder andwheelbearingetc with new spares as per existing all as specified and directed by Engineer-in-Charge |
| 9 | Material and labour for checking /repairing ofelectrical systemsuch asstarting problem , wiring, self motor, dynamo and any other faults all as specified and directed by Engineer-in-Charge. |
| 10 | Material and labour for checking/repairing clutchsystem by overhauling and replacing clutch plate, clutchcoverassembly, release bearing andlinkageswith new spares as per existingall as specified and directed by Engineer-in-Charge |
| 11 | Material and labour for overhaulingsuspensionwork by replacingthe spares like load spring re-cambering , springplate, Spring bushes, ‘U’ bolts ,angerand allthe shock absorbersetc with new spares as per existingall as specified and directed by Engineer-in-Charge |
| 12 | Material and labour for repairingsteeringsystem by overhauling and replacingsteeringballjointand tie rod endassemblyetc with new spares as per existingall as specified and directed by Engineer-in-Charge |
| 13 | Supply and replace the defective sparesinhead lightset assemblywith new sparesas per existingand making head set assembly in good working condition all as specified and directed by Engineer-in-Charge |
| 14 | Supply and fix in repairs indicator light fitting complete set including necessary electric connection as required all as specified and directed by Engineer-in-Charge |
| 15 | Supply and replace the defective sparesinhornset assemblywith new sparesas per existingand making hornset assembly in good working condition all as specified and directed by Engineer-in-Charge |
| 16 | Supply and replace the defective sparesinself motorassemblywith new sparesas per existingand making self motorassembly in good working condition all as specified and directed by Engineer-in-Charge |
| 17 | Material and labour for overhauling complete gearsystem by replacing worn out and defective spares with new spares and making gear system in good working condition all as specified and directed by Engineer-in-Charge |
| 18 | Material and labour for overhauling wiper motor by replacing worn out and defective spares with new spares including provision of wiper arm with blade two numbers and making wipersystem in good working condition all as specified and directed by Engineer-in-Charge |
| 19 | Material and labour for replacing the u/swater pumpof vehicle with new one and testing of vehicle all as specified and directed by Engineer-in-Charge.Make:As per sample |
| 20 | Material and labour for overhauling Engineby replacing worn out and defective spares with new spares including provision of \"O\"ring ,reeds and gasketsand making Engine in good working condition all as specified and directed by Engineer-in-Charge |
| 21 | Material and labour for tinkering the body of MT vehicle such as frontcabincomplete set(i.e.thefront inspection doorassembly, frontgrill complete set, radiator guard,front wheel arch with foot rest (model)right& leftside, windshield& sideview glass, glassseating portionwith glass&door beading,door hinges,and doorhandle, all doorrear mudguardright &left side, drivercabinrearsideradiator water filling tankwith bracket,chassissupportingchannel‘u’Bolt,rear cabin floorsupportingcrossedchannel4Nos,rear portioncomplete fabrication withdoorasperexisting model and spray painting the entire tinkering portion to match with existing colour of vehicle all as specified and directed by Engineer-in-Charge |
| 22 | Taking out old unserviceable seat cover and supply and fix new seat cover including extra cushion |
| 23 | Supply and fixing floor mat for TATA/ Suzuki Dezire vehicle.NOTE FOR SL.ITEM NO 1.01 TO 1.22: Servicing/Repairing of vehicle specified above shall be carried out through authorised service centre/workshop as approved by Engineer-in-Charge. |
| 24 | MOTER CYCLE HERO HONDABA NO. 13A-068158Y MC Splendor pro 14A-068443A, M/C Bajaj Platina 22A-076463X, 22A- 076465M |
| 25 | Taking down wheel assembly carefully fromvehicleof any type as specifiedabove and transport to workshop outside IAF campus for rectification of puncher intyre and refixing the same in original position of same vehicle all as directed by Engineer-in-Charge . |
| 26 | Material and labour forchecking/repairing complete brakesystem by overhauling and replacing brake shoe ,supporting plate bearingetc with new spares as per existing all as specified and directed by Engineer-in-Charge |
| 27 | Material and labour for checking /repairing ofelectrical systemsuch asstarting problem , wiring, dynamo and any other fault all as specified and directed by Engineer-in-Charge. |
| 28 | Material and labour for checking/repairing clutchsystem by overhauling and replacing clutch plate, clutchcoverassembly, release bearing andlinkageswith new spares as per existingall as specified and directed by Engineer-in-Charge |
| 29 | Material and labour for overhaulingsuspensionwork by replacingthe spares likeSpring bushesand allthe shock absorbersetc with new spares as per existingall as specified and directed by Engineer-in-Charge |
| 30 | Supply and replace the defective sparesinhead lightset assemblywith new sparesas per existingand making head set assembly in good working condition |
| 31 | Supply and fix in repairs indicator light fitting complete set including necessary electric connection as required |
| 32 | Supply and replace the defective sparesinhornset assemblywith new sparesas per existingand making hornset assembly in good working condition |
| 33 | Material and labour for overhauling complete gearsystem by replacing worn out and defective spares with new spares and making gear system in good working condition |
| 34 | Material and labour for overhauling Engineby replacing worn out and defective spares with new spares including provision of \"O\"ring ,reeds and gasketsand making Engine in good working condition NOTE FOR SL.ITEM NO 2.01 TO 2.10: Servicing/Repairing ofvehicle specified above shall be carried out through authorised service centre/workshop as approved by Engineer-in-Charge. |
| 35 | Service charges for attending minor repairs/faultssuch as starting trouble etc found in MT vehicle parked in MES MT yard by qualified experienced vehicle mechanic |
| 36 | Taking MT vehicle to workshop and rectifying the wornout /damaged parts of vehicle by proper welding in standard Engineering process and painting the welded surfacesall as specified and directed by Engineer-in-charge.Note : Necessary gate pass duly signed by Engineer-in-Charge and JE shall be submitted along with RAR/FB for payment purpose. |
| 37 | Takingdown oldbattery of below mentioned vehicle and transport to authorised battery service centre for repairing and replacing defective parts with new spare partsincluding filling distilled water to required level and making the battery in good working condition & after necessarytesting and re-fixing the same battery to the same vehicle all as specified and directed by Engineer -in- charge |
| 38 | 12 volt 70 Ah battery of Eicher/Tata mobile/Swift |
| 39 | 12 volt 2.5 Ah battery of M/C Hero honda/Bajaj |
| 40 | Repairs and maint of Air-compressor including spares complete service all as specified and directed |
| 41 | Repairs and maint of Tyre inflator system including spares complete service all as specified and directed |