|
| 1 | Comprehensive periodical and preventive maintenance to Electrically operated passenger bed elevator-I No NM 8363of 20 passenger (1360 Kgs) Capacity from ground to 2nd floor with minimum speed 0.55mtr/Sec installed in B block Make- OTIS -01 No, with power driven automatic steel sliding doors of single speed and efficient operating condition through manufacturer instructions by regular examination, lubrication and carry out planned maintenance system, servicing, oiling and controlled manner using techniques and expertise and replacement of unserviceable components such as worn out gear, thrust bearing, drive sleeve bearing, brake contact, lining motor winding, rotating elements, relays, solid state components, PCBs, resistance, condensors, power amplifier, transistors, contacts, diodes,governor jaws car, hall buttons, car & hall position indicators, car weight,duide rails and buffers, top and bottom limit switch, battery operated emergency light and alarm system, wiring of all equipments and accessoris, reverse phase indicator, automatic rescue device for and testing and servicing of Drives & Pulley etc for under mentioned including sunday & holiday for the lifts complete all as speciied and directed |
| 2 | All as per item No.1 above herein before but forElectrically operated passenger bed elevator No NM 8364of 20 passenger (1360 Kgs) Capacityfrom ground to 2nd floor with minimum speed 0.55mtr/Sec installed in B block Make- OTIS -01 No |
| 3 | All as per serial item No. 1 above herein before but for Electrically operated passenger bed elevator No NM 8361of 15 passenger(1020 Kgs) Capacityfrom ground to 5th floor with minimum speed 0.55mtr/Sec installed in D block Make- OTIS -01 No |
| 4 | All as per serialitem No. 1 above herein before butfor Electrically operated passenger bed elevator No NM 8362of 15 passenger(1020 Kgs) Capacityfrom ground to 5th floor with minimum speed 0.55mtr/Sec installed in D block Make- OTIS -01 No |
| 5 | All as per serialitem No. 1 above herein before butfor Electrically operated passenger bed elevator No NM 8365of 3000 Kgs Capacityfrom ground to 5th floor with minimum speed 0.40mtr/Sec installed in E block Make- OTIS -01 No |
| 6 | Note - 01 (for ser 01 to 05)Comprehensive maintenance to Electrically operated passenger bed Elevators/Lifts also includes following minor repair/replacement works during the entire comprehensive maint period and contractor must includes the following in the above Quoted rate:(a) Replacement of Unserviceable Tubelights of the cabin of the Lifts.(b) Repair/Replacement of Unserviceable Cabin Fan of the Lifts,(c) Repair Of Electrical LT control Panels of the Lifts including replacement of contactor/isolators switches etc.(d) Servicing and testing of Shockers and all controllers of the Lifts.(e) Repair of Automatic Operated Gates of the Elevators/Lifts including Greasing and replacement of unserviceable contactor ,lock, sensors & switches. (f) Repair ofalarm systems of all Elevators/Lifts |
| 7 | Note 02 - The entire work mentioned in item No 01 to 05, including comprehensive, preventive and periodical maintenance of lifts / elevators shall be got executed through OEM i.e. M/s OTIS Elevator company (India) Ltd only.The contractor will also submit the physical copy of MOU with M/S OTIS Elevator company within 15 days of AOC.(i)Grade of oil required in gear box shall be India oil, Servo Mesh 320 pr Servo system 320 equivalant Grade of oil all as approved by Engg - in - charge.(ii) Any items not covered under as supply only shall be deemed to be included in this section for the smooth fuctioning of lifts and contractor may quote the rate accordingly. (iii) contractor is expected to inspect the lift before quoting the rate. |
| 8 | Note 03:(i) Contrator shall be attending complaint round the clock i.e 24 hrs. If contractor is not able to rectify the complaint, penalty shall be charged as given below (a) upto 1st day- NIL(b) 2nd day- Rs 1000/-(c) Subsequently for every day- Rs 1200/day(ii) Responce time shall be 3 working hours if any breakdown call is received during late hours the same will be attended by early next morning. The call back service will be provided with respect of WEF 9.00am to 5.30 pm in case of any emergency the service may be provided beyond this timing. As against major breakdownthe time needed for repair/replacement of the following items to the extent indicated should also not to be counted as down time.a. rewinding/replacement of main motors 07 daysb. Warm Gear 07 days.c. Speed governor rope 02 daysd. Brake shoe liner01 daye. Transformer Rectifier05 daysf. Tralling cable replacement 05 daysg. Brake Magnet /Door drive motor rewinding alcement05 Days |
| 9 | Note 3 :- (i) All defective parts will be replaced by contractor within 48 hrs as per above mentioned Lifts. Replacement cost of defective parts will be included in above quoted rates . On failure, a panel recovery of Rs. 2000/- per day shall be made from the contractor dues.(ii) In order to certify proper maintenance of the system, monthly visit of Engineer from authorised rep of company to check the efficient running ofall Lifts/Elevatorsis mandatory on part of contractor. The unit rates quoted by the tenderer shall be deemded to includethis aspects. Necessary documents in support of deployment and visit of authorised representative from company shall be submitted by the contractorafter each visit. On failure of visit by auth. representative or non submission of report by him, a panel recovery of Rs. 5000/- per visit shall be made from the contractor dues. |
| 10 | M&L for painting of Elevators/ Lifts Complete including Cabin complete and channel/Collapsible door of all floor 1st floor to 5th Floor complete with Spray gun and brush with synthetic enamel paint as per existing colour over coat of red oxide primer complete all as specified and as directed. |
| 11 | Material and labour for checking and testing of ARD (Automatic Rescue device) system of lifts including replacementof unserviseablemaintenance free Sealed Lead-Acid Battery ) of Lifts cap- 12 Volt 7.5 Ah ( 08 Nos) stype EP-12-12 as per existing. |