| 1 | T-off Clamp with STP |
| 2 | M S T - Off channel |
| 3 | Danger board with clamp, nut and bolt |
| 4 | Stay set at angle location and at turmination point |
| 5 | ACSR Weasel Conductor |
| 6 | 11KV stay loop insulator |
| 7 | LT clamp for STP |
| 8 | Dropper Channel 100 x 50 x 6 mm (2000 mm) |
| 9 | Top channel |
| 10 | M.S. angle 65 x 65 x 6 x 2028 mm |
| 11 | Stone Pad 300 x 300 x 75 mm |
| 12 | 11kv cross arm holding clamp for PCC |
| 13 | LT Clamp for STP 11 M Pole |
| 14 | Number Plate with fitting. |
| 15 | LT ABC Cable 3 x 50 + 1 x 35 + 1 x 16 Sq. mm |
| 16 | 11KV stay clamp for PCC |
| 17 | Red Oxside Paint. |
| 18 | Eye Hook Clamp for PCC Pole |
| 19 | EYe Hook |
| 20 | Guarding Clamp for PCC pole with N & B |
| 21 | Dp Clamp for PCC 8.5 Mtr. Pole |
| 22 | LT ABC Cable 3 x 120 + 1 x 95+ 1 x 16 Sq. mm. |
| 23 | STP Pole 13 Mtr. Long. |
| 24 | LT distribution box - 3 PH. |
| 25 | LT distribution box mounting clamp - 3 PH. |
| 26 | Aluminium Binding wire 6 SWG |
| 27 | M S Nut & Bolt washer |
| 28 | G.I. wire 4 mm. /8 SWG |
| 29 | PCC Pole 8.5 Mtr. Long |
| 30 | Earth wire 7/16 SWG |
| 31 | 11kv disc insulator polymeric 70 KN |
| 32 | Cross arm V type 11kv 65x65x6 mm |
| 33 | 11KV DO Fuse Set |
| 34 | Shifting of existing T/F to new D/P or plinth |
| 35 | Aluminium Tape |
| 36 | STP Pole 11 Mtr. Long |
| 37 | Guarding angle 50 x 50 x 5 x 2500 mm |
| 38 | Guarding angle clamp 50 x 50 x 5 x 2500 mm |
| 39 | Earthwire Clamp with Nut & bolt for 8.5Mtr PCC |
| 40 | LT distribution box - 1 PH. |
| 41 | LT distribution box mounting clamp - 1 PH. |
| 42 | Stay wire 7/10 SWG |
| 43 | F Bracket |
| 44 | Aluminium Paint. |
| 45 | Earthing Complete |
| 46 | Dead clamp |
| 47 | 11KV composite polymer pin insulator |
| 48 | Cutting of tree. |
| 49 | Bracing set angle |
| 50 | Bracing clamp 1900 mm |
| 51 | Suspension clamp |
| 52 | Peircing connector |
| 53 | Disc fitting |
| 54 | Barbad wire G.I. |
| 55 | P G clamp |
| 56 | E clamp |
| 57 | Eraction and Grouting of single pole |
| 58 | Muffing of pole |
| 59 | Eraction and Grouting of stay complete |
| 60 | Total |
| 61 | Labour Charge @ 30 % of BOQ Dismantalling of Old Line/Material & Diposite to store including Cartage Errection with T & P Laying Testing & Commisioning etc. except item No.-48 Please Enable Macros to View BoQ information |