| 1 | Annual Maintenance contract for servicing and load testing of Electric Operated Overhead Trally (EOT) for one year period. It consists of checking function of MH, AH, LT and CT brakes,checking and attending gearbox oil leaks, Cleaning of wire ropes and inspect for the wear and tear, peening of wire, broken strands, kink mechanical damage and core damage, checking condition and function of Rope drum,checking condition of bushes and replace if required, alignment of drive shafts, tighten bolts, keys and fasteners, backlash in gear coupling, gear tooth wear in gear couplings, refill gear coupling with grease, checking condition and functions of hooks, alignment and skewness of rails and wheels, Checking function and condition of the limit switches, checking crane motions, limit switch operation and brake performance, bearing condition and lubrication & greasing of all motors, gear boxes, shafts, axles, wheels & pulleys,functions of limit switches, etc and load testing of crane once in year to complete as per the specification and scope of the work as given. |
| 2 | 1.0 to 3ton capacity |
| 3 | 5 ton capacity |
| 4 | 5 ton to10 ton capacity |
| 5 | 10 tonto 16 ton capacity |
| 6 | 17 to 20 ton capacity |
| 7 | 20 / 2to 25/2 ton capacity ( Main &Auxillary) |
| 8 | 30 / 5 ton capacity ( main & auxillary) |
| 9 | 40 / 5 ton capacity SFP (main & auxillary) |
| 10 | Annual Maintenance contract for servicing and load testing of Electric Wire Rope Hoist (EWRH) with Monorail for one year period.It consists of checking performance of brakes & wears of liners, spring settings, lubricate the linkages of EM brakes, checking gear box for oil, level, leakage,oil seal, check wire rope for wear, kinks, broken strands, core damage, mechanical damage, check Rope drum, check swivel, cracks, distortion and elongation of Hook, check for any wear and tear, cracks, looseness of monorail beam / holding clamps and wheels, check limit switches functions and load testing of crane once in year to complete as per the specification and scope of the work as given. |
| 11 | 0.5 to 1ton capacity |
| 12 | 2 ton capacity |
| 13 | 3 ton capacity |
| 14 | 5 ton capacity |
| 15 | 10 ton capacity |
| 16 | 20 ton capacity |
| 17 | Annual Maintenance contract for servicing and load testing ofChain Pulley Block with Monorail for one year period. It consists of clean and check Chain Pulley Block, Traveling Trolley and Monorail,all joints and fasteners, lubricate chain pulley block load chain, trolley gears, bearings & drive mechanism, check the function and performance with no load & full load, check hook for wear & tear, check load chain, hand chain for defect or damage etc. and load testing of Chain Pulley Block once in year to complete as per the specification and scope of the work as given. |
| 18 | 0.25 / 0.5 ton capacity |
| 19 | 1 tonto 2 ton capacity |
| 20 | 3 ton capacity |
| 21 | 5 ton capacity |
| 22 | 10 ton caopacity |
| 23 | Painting of MS structures, this includes thorough cleaning, one coats of branded synthetic enamel paint over a coat of zinc chromate red oxide primer |
| 24 | Rewinding of Direct current Electromagnetic Brake of EOT crane( DCEM ) brake windingcoil with suitable size copper wire. |
| 25 | Comprehensive Maintenance ofof 85 HP Diesel Engine installed at Fire water pump house ,kalpakkam.( To be executed with authorised service person)including spares and consumables. This includes two preventive maintenance visits per quarter foreach machine. |