| 1 | M&L for preparation of surfaces of roads,bituminous orrigidpavement, flexible pavings, aprons and the like exceeding 10 cm width or girth as in lines dashes, arrows, letters etc and applying one coat of aqua based road making paint of any tintas required at site complete all as specified and directed.Note : (i) Availability ofsite andworking hoursfor paintingwill depend on Air Trafic Control (ATC) Unit . Nothing extra shall be admisible if intermittent working hoursfor painting will be availabledue tooperational activity. |
| 2 | All as per Item No 1.00 above but applyingtwo coats of aqua based road marking paint as and when required by userscomplete all as specified and directed.Note : (i) Availability ofsite andworking hoursfor paintingwill depend on Air Trafic Control (ATC) Unit . Nothing extra shall be admisible if intermittent working hoursfor painting will be availabledue tooperational activity. |
| 3 | M&L for preparation of surfaces of roads,bituminous/ rigid, pavement, flexible pavings, aprons and the likenot exceeding 10 cm width or girth as in lines dashes, arrows, letters etc and applying with one coat of aqua based road making paint of any tintas required at site complete all as specified and directed.Note : (i) Availability ofsite andworking hoursfor paintingwill depend on Air Trafic Control (ATC) Unit . Nothing extra shall be admisible if intermittent working hoursfor painting will beavailabledue tooperational activity. |
| 4 | All as per Item No 3.00 above but applyingtwo coats of aqua based road marking paint as and when required by userscomplete all as specified and directed.Note : (i) Availability ofsite andworking hoursfor paintingwill depend on Air Trafic Control (ATC) Unit . Nothing extra shall be admisible if intermittent working hoursfor painting will be availabledue tooperational activity. |
| 5 | M&L for preparation of old bituminous/concretepavement surfaces by sweeping, removing foreign materials etc and applying a coat of white washing complete all as specified and directed.Note : (i) Availability of working hoursfor white washing will depend on Air Trafic Control (ATC) Unit . Nothing extra shall be admisible if intermittent working hoursfor white washingis available due tooperational activity. |
| 6 | Cutting of grass by manualy operated bush cutter machineof areas around various signboards. Installation,post, DTGM and likes wheremechanical means can not be deployed including cleaning away all grass vegetations, sampling shrubs, brushes weeds and roots of trees etc and removing rubbish at low line area exc 200 mfrom edge of runway / taxiway /dispersal complete all as specified and directed by Engr- In-Charge. Note : (i) Availability of working hoursfor cutting of grass will depend on Air Trafic Control (ATC) Unit . Nothing extra shall be admisible if intermittent working hoursfor cutting of grass are available due tooperational activity. |
| 7 | Providing of JCBwith operator for levelling of the areas around the Runway/Taxi Track/Runway shoulders and cleaning of the grass/brushes etc where it will not be possible by mechanical/Jungle Zim. |
| 8 | Providing Dumpers for cleaning of debries by lifting around the Runway/Taxi Track/Runway shoulders and taking away from the runway perimeter by the contractor all as directed by the Engr-in-Charge.Quotedrate shall be included for loading, unloading and transportation etc.Note:- Contractor has to provide necessary breaker and iron cutter if required at site for making the debris portable and no extra payment shall be made in this regard. |
| 9 | M&L for Repair of potholes by pourng 3 component epoxy mortar including cutting the broken sides of PCC slabs,sides of pot holes in concrete surface,sides of joints (ie construction, dummy, expansion etc to a true rectangular shape and to depth min 30 mm as required at site with hand/mechanical tools as required upto hard sound surface of old concrete including removing loose material to a distance exceeding 150 m and deposited the same as directed. Grooves/prepared surface is to be cleaned by means of compressed air to remove dust loose sand , foreign materials and washing the grooves/surfaces with solution prepare with hydrochloric acid and water in equal proportion at the rate of 7 Lts per 10 Sqm in two applications. Apply primer Shali Bond 41 of STP (or) equivalent in Sika/ Fosroc as approved by GE in two operations as per manufactures instruction and Fill with 3 component epoxy motor Shalifix EM 51 (or) equivalent in Sika/ Fosroc all as per manufacturers instructions and directed by Engr-in Charge. |
| 10 | Cleaning of drain of width not exc 1.50 mand depth upto 1.50 m including cleaning the grass, bushes mules, silts etcby manuallyfrom the bottomand both sides (up to1.00 mtr) both sides of drainat the top leof the drain including removal of the grass, bushes mules, silts etc up distance of 100 m , complete all as specified and as directed. |
| 11 | All as per item No 10.00 here-in-before butwidthexc 1.5 m but not exc 3 mand depthexc 1.50 m but not exc 3.00 m. |
| 12 | Cleaning ofcovered drain having width not exc 1.50 mand depth upto 1.50 m covered with RCC precast cover slab of Size n exc 1.5 Sqm, depth n exc 400mm. Cleaning the grass, bushes mules silts by manuallyfrom the bottom of the drain and sides (up to 1.5 mtrboth the edges of drain at level ofdrain) including removal upto 100 m. Quoted rate shall be included for taking outRCC drain cover carefully by manually/mechanically as required and directedand refixingthe same to a true level matching with the adjacent slabs/concrete surfaces by demolition/ filling concrete below the RCC cover slabs after cleaning the draincomplete all as specified and as directed. |
| 13 | Repair to existing construction and dummyjoints of size 10mm to 12mm wide and 25mm avg depth on rigid pavementof runway ,taxiwayand dIspersal of air fieldwith all activities :(i) Raking out old decayed/damaged existing sealingcompound with backup rod of any description and cleaning the joints thoroughly by removing dust, dirt foreign material by appropriate electric cutter and air blower.(ii) Removing the existing sealing compoundfrom the edges , bottom and sides of the joints by cutting the edges, bottom and sides of the joints by mechanical tool (diamond cutter) to make the cross section of joint truly rectangular. Cutting of edges/sides/bottomof joints shall be doneby using diamond cutter only .(iii) Once again cleaning the joints with compressed air and applying two primer coats (with interval of 30 minutes between each coat)upto the full depth & width of the existing joints (iv) Sealing the joints with polyurethane joints sealant single component (upto full width of existing joint) all as per manufacturers instruction including applyingmasking tap on edges of joints to prevent accidental spillage of sealant on top surface and removing the tap after sealant is applied complete all as specified and directed.(v) The quoted unit rate deemed to include supplying ang fixing of back up rod /slabof appropiate diameter / thickness as per site requirement.(vi) Electric supply shall be arranged by the contractor at its own arrangements.(vii) Make: Bostik (Seal N Flex)/Sika (Flex 11 FC) (or) equivalent as approved by GE |
| 14 | All as per item No 13 above but fo expansion joints of width 25mm to 30mm |
| 15 | Supplying and fixing 25 mm thick pre formed compressible filler board (HD-100) of required depth |
| 16 | Demolition of cement concrete (Unreinforced)of any description and in any position not otherwise specifically providedand removing the debris to a distance exc 1.50 km but not exc 5.0 Kmat the location shown by Eng-in-Charge, complete all as specified and directed. |
| 17 | Material and labouras per site thick pavement quality cement concrete work in pavement/Dispersal/ taxi link of flexural strength 4.5MPa in field using minimum 400 Kg of cement per cubic metre, mixed withnon circular fibre synthetic reinforcement (0.25% of weight of cement or as per manufacturer\"s instruction), spread and compacted with plate niddle vibrator to thickness 350mm including necessary form work, finishing, belting , curing, brooming, numbering of slab and provn of joints etc complete all as specified and directed. Flexural strength shall be established by beam test and design mix formula should be compatible toas per IRC-44-2008, IS -456.Note :- (a) Non circular fibre synthetic reinforcement shall be paid separately and should be as per mix design(b) All type of joints shall be measured and paid separately. Curing compound will be applied at the paving stage after broom finish and surface is dry, and rate for use of curing compound shall be incl in quoted rate..(c) No deduction shall be made from concrete for space occupied by construction and dummy joints.Deduction however be made for space occupied by expansion joints.(d) Minimum cement content per cubic metre of concrete shall be 400 Kg per cum. However actual cement content shall be worked out as per design mix and nothing extra shall be admissible on this account.(e) The rate quoted shall be inclusive of use and waste of form work for total thickness.(f) Surface shall be finished by traverse brooming of maximum 1.5 mm deep as per ICAO |
| 18 | Supply only polyster non circular fibre reinforcement complete all as specified and as directed. |
| 19 | 10 mm thick sand cushion with clean river sand duly clear of residual , organic and deleterious materials spread evenly to uniform thickness laid over DLC layer as specified and directed. (No additional amount to be paid for overlap) |
| 20 | Supplying and laying 400 micron thick HDPE sheet (Virgin Quality) water proof, wrinkle free without puncture having minimum weight 390 gm/Sqm over sand cushion as specified in the design with overlap between adjacent strips and at transverse joints as minimum 300mm.NOTE :- Side lap of 150 mm and end lap of 300 mm shall be provided whereever overlap is to be provided. The polythene film sheet shall be measured net and the rate quoted by the bidder shall be deemed to include this provision. |
| 21 | Material and labour for forming 8 mm wide, 110 mm deep construction joints, applying 02 coats of priming and providing closed cell polythene back up rod 10 mm dia with 2 mm debonding tape and joint sealed with and using cold applied single component polyurethane sealant (Top 12 mm leaving 2-3 mm recess) conforming to requirement of BS-5212 and EN 141875-2003 for hydrolysis/water resistance test including initial 3mm wide raw cut upto 110 depth (with 8 to 24 thick) and fixing of masking tape before sealantis applied and removing the masking tape after sealant is applied complete all as specified and as directed.NOTES :- (i) Sealant shall have MAF minimum +30% and manufacturer\"s warranty of 10 years.(ii) Joint filling operation shall be carried out mechanically in the presence of the rep of manufacturer of sealant.(iii) Rounding of edges of joints shall be done with hand grinder upto 5-6 mm dia. |
| 22 | Material and labour for forming dummy joints 8 mm wide, 110 mm deep, 02 coats of priming and providing closed cell polythene back up rod 10 mm dia with 2 mm debonding tape and joint sealed with and using cold applied single component polyurethane sealant (Top 12 mm leaving 2-3 mm recess) conforming to requirement of BS-5212 and EN 141875-2003 for hydolysis/water resistance test including initial 3 mm wide saw cut upto 110 mm depth (within 8 to 24 hours of casting of PQC) and applying masking tape on edge at joints to prevent accidental spillage of sealant and removing the masking tape after sealant is applied complete all as specified and as directed. NOTES :- (i) Sealant shall have MAF minimum +30% and manufacturer\"s warranty of 10 years.(ii) Joint filling operation shall be carried out mechanically by the rep of manufacturer of sealant. (iii) Rounding of edges of joints shall be done with hand grinder upto 5-6 mm dia. |
| 23 | Material and labour for cutting of 25 mm wide expansion joints upto full depth of concrete slab (350-400 mm) (initial cut of 3 mm upto full depth cut by diamond cutter machine within 8 to 20 hours of casting of PQC) and filled with pre-formed compressible filler coard (HD-100) of required depth, provision of closed cell polythene back up rod 30 mm dia with 2 mm thick debonding tape (minimum depth over back up rod shall be 17-18 mm), 02 coats of priming the vertical sides of joints and sealing the joints (top 14-15 mm) with single component polyurethene sealant conforming to requirement of BS-5212 and EN 141875-2003 for hydrolysis/water resistance test and applying masking tape on edge at joints to prevent accidental spillage of sealant and removing the masking tape after sealant is applied complete all as specified and as directed.NOTES :- (i) Sealant shall have MAF minimum +30% and manufacturer\"s warranty of 10 years.(ii) Joint filling operation shall be carried out mechanically in the presence of the rep of manufacturer of sealant. (iii) Rounding of edges of joints shall be done with hand grinder upto 5-6 mm dia. |
| 24 | Demolition of brick work masonry, built in cement mortar including all quoins, arches, pillars, etc, completeall as specified and directed. |
| 25 | M &L for brick work with sub-class \"B\" bricks, straight or curved on plan exc 6 m mean radius built in cement mortar 1:6 |
| 26 | M&L for rendering 15mm thick on brick or concrete surfaces in CM 1:4, finishing the surfaces fair and even without using extra cement complete all as specified and directed. |