| 1 | Construction of Retaining wall at Uyankondan River Near Bridge in Keelakurichi Panchayat. Earth work excavation for Foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and balling out water whenever necessary and refilling the sides of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth within the compound in places shown by the departmental officers with initial lead and lift etc., including levelling the sites complete complying with standard Specifications. |
| 2 | Supplying and filling in foundation and basement with M-sand in layers of not more than 15cm thickwell rammed watered and compacted including & conveyance and all labour charges etc., |
| 3 | Cement concrete 1:4:8 mix ( one cement four sand and eight aggregate ) using 40mm guage hard broken tone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15cm thick and compacted etc., complete comply |
| 4 | Supplying and erecting centering for sides and soffits of RCC works of plane surfaces mentioned below including strutting 3m high using mild sheets stiffened with M.S angles |
| 5 | CC 1:3:6 mix using 40mm ISS HBG metal for including laying, ramming, curing etc., complete |
| 6 | Provision for Name board charges |
| 7 | Construction of Drainage and culvert at Muthuraja Street Ilayaraja House to Balaya House in Keelakuruchi panchayat . Earth work excavation for Foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and balling out water whenever necessary and refilling the sides of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth within the compound in places shown by the departmental officers with initial lead and lift etc., including levelling the sites complete complying with standard Specifications. |
| 8 | Supplying and filling in foundation and basement with M-sand in layers of not more than 15cm thickwell rammed watered and compacted including & conveyance and all labour charges etc., |
| 9 | Cement concrete 1:4:8 mix ( one cement four sand and eight aggregate ) using 40mm guage hard broken tone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15cm thick and compacted etc., complete comply |
| 10 | Supplying and erecting centering for sides and soffits of RCC works of plane surfaces mentioned below including strutting 3m high using mild sheets stiffened with M.S angles |
| 11 | Above |
| 12 | CC 1:3:6 mix using 40mm ISS HBG metal for including laying, ramming, curing etc., complete |
| 13 | Supplying and fabricating and placing in position of ribbed steel rods for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors etc., complete |
| 14 | RCC 1:1 1/2:3 mix using 20mm ISS HBG metal for RCC works excluding centering, shuttering, and reinforcement grill but including laying, ramming, curing etc., complete |
| 15 | PLASTERING with cement mortar 1:5 (one cement and five sand ) 12mm thick in all floors complying with standard specifications. |
| 16 | Provision for Name board charges |
| 17 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package} Please Enable Macros to View BoQ information |