Name of Work:- Construction Of Pipe Line From Munshiram Svarupnagar Me Peyjal 110Mm 4Inch Hdpe Pipe Line In Ward No.05
Sl. No.
Item Description
1
Percentage BoQ BoQ_Ver3.0 Percentage Normal INR Only INR Select, At Par, Excess (+), Less (-) IOCL Tender Inviting Authority: Exicutive officer Nagar Panchayat Sirsa Prayagraj Name of Work:-Construction of pipe line from munshiram svarupnagar me peyjal 110mm 4inch hdpe pipe line in ward no.05 Contract No:DEC25SRS_PIPELINE2 Name of the Bidder/ Bidding Firm / Company : PRICE SCHEDULE(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # S.No. Item Description Item Code / Make Quantity Units Estimated Rate inRs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT Without Taxes inRs. P TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words
2
Construction of Pipe Line
3
Excavation of earth in ordinary soil (loam, clay or sand ) for pipe line and rising main trenches including lift upto 1.5 m and lead upto 50.0 m and refilling watering,ramming of the excavated earth into the trench and also disposal of surplus earth upto 50m from the centre of the trenches including supply of all material labour, T&P etc complete as per instructions of Engineer-in-charge.
4
Sand bedding in trench in layers not exceeding 10 cm in depth consolidating each deposited layer by ramming and watering complete as per instructions of Enginner.
5
Supply of following sizes of pipes for distribution system conforming to latest/relevent I.S. 4984/1995 Specification with all jointing materials and specials confirming to latest/relevent I.S. specification including F.O.R. destination and all taxes and insurance etc with loading , unloading and carting uo to site of work , also including specials for these pipes and lowering them into the trench and laying true to alignment and gradient and jointing etc complete (including testing of pipe line and cutting of pipe for making up the length but excluding cost of trenches ) all complete as per instruction of Engineer-in-charge.
6
Dismantling of following type of surface including sorting out and stacking of serviceable materilas and disposal of unserviceable materils upto a distance 50 m as per instructuin of engineer in charge. Interlockig road
7
CC Road
8
Permanently re-instatement of following type of road surafce with old and new materila including supply of all matrials erviceable material and disposal of un-serviceable material up to distance of 50 meter and provide all labour & materials, T&P , as per satisfaction of Engineer-in- charge. interloking road
9
CC Road
10
Supply of following sizes of fittings including F.O.R. destination and all taxes and insurance etc. complete.Carting of following size & type of pipe and specials from departmental store to site of work and lowering them into trenches , fixing in position and jointing them with pipe line and testing etc. complete. ( incl. supply of jointing material )
11
Construction of following chambers as per type design including supply of all marerials, labour, T&P etc complete.
12
Other miscellaneous work etc complete
13
Cost of Photos High Quality Resolution with GPS Coordinate of site before start of work, work onging and after completion of work etc….complete
14
GST Total in Figures 2895000.0 2895000.0 INR Twenty Eight Lakh Ninety Five Thousand Only 4.0 Construction of chamber for 100mm sluice plates item5 10.0 Nos Quoted Rate in Figures Select 0.0 0.0 INR Zero Only Quoted Rate in Words INR Zero Only Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.