Sales : +91-777 804 8217
| Sl. No. | Item Description |
| 1 | The repair work involves complete replacement of worn-out, unserviceable and defective spare parts of the 50 kg capacity Supershine Drying Tumbler to restore its operational efficiency, safety and reliability. This includes systematic dismantling and removal of old components, followed by installation of new OEM-compatible spares listed in the schedule. for Make of dry tumbler: Supershine |
| 2 | Digital Temperature meter |
| 3 | Timer |
| 4 | Auxiliary contacts |
| 5 | Contactor relay M L 1, 3 phase 415 volts |
| 6 | Contactor relay M L 2, 3 phase 415 volts |
| 7 | Auxiliary relay |
| 8 | Revenger (Reverse Forward) |
| 9 | Main Motor -V-belt |
| 10 | Motor bearings |
| 11 | Blower bearings |
| 12 | Reduction gear bearings |
| 13 | Main bearing |
| 14 | Solenoid valve |
| 15 | Push button |
| 16 | Steam strap 15mm |
| 17 | Door Locks |
| 18 | Door Beading |
| 19 | Exhaust Fan/Blower |
| 20 | 1/2\" Steam Valve |
| 21 | 3/4\" Steam Valve |
| 22 | Reduction gear V-belt |
| 23 | Brake actuator |
| 24 | Supply and fixing in replacement of all defective and unserviceable spare parts of the 25 kg capacity Supershine Hydro Extractor to restore the machine to full operational efficiency. The repair activity comprises careful dismantling and removal of old, worn-out parts, thorough cleaning of mounting surfaces, and proper installation of new OEM-compatible components as directed. All replacement spares are to be fitted in accordance with manufacturer’s specifications to ensure safe, vibration-free and reliable extraction performance. |
| 25 | Contactor M L 1, 3 phase, 415 volts |
| 26 | Timer relay |
| 27 | Transformer |
| 28 | Timer |
| 29 | Buffer |
| 30 | Limit switch |
| 31 | Main motor bearings |
| 32 | Push button |
| 33 | Motor to body springs |
| 34 | Rubber bush for Hydro Extractor |
| 35 | Hydro Extractor motor bearings |
| 36 | Bridge rectifier |
| 37 | Diode |
| 38 | Body Spring support Bolts |
| 39 | Bush |
| 40 | Supply and Fixing in Replacement of the following spares suitable for the 50 Kg capacity Supershine Washing Machine, including complete removal of old, damaged and unserviceable components. This involves careful dismantling of defective parts, cleaning of mounting surfaces, checking alignment points, and proper installation of new, compatible OEM-standard spares included in the schedule. All electrical, mechanical, safety-related and control-system components required to restore full functional capability of the washing machine shall be replaced as necessary. |
| 41 | Digital Temperature meter |
| 42 | Timer |
| 43 | Contactor relay M L 1, 3 phase, 415 volts |
| 44 | Contactor relay M L 2, 3 phase, 415 volts |
| 45 | Relay M L 1, 3 phase, 415 volts |
| 46 | Relay M L 2, 3 phase, 415 volts |
| 47 | Revenger (Reverse Forward) |
| 48 | Water Level Indicator |
| 49 | Steam solenoid Valve |
| 50 | Drain valve actuator |
| 51 | Main motor V-belt |
| 52 | Aux Motor V-belt |
| 53 | Washing Machine main bearing |
| 54 | Reduction gear bearing |
| 55 | Water inlet solenoid valve suitable for 50 kg washing machine |
| 56 | Water outlet solenoid valve suitable for 50 kg washing machine |
| 57 | Gland rope |
| 58 | Main motor bearings |
| 59 | Aux Motor bearings |
| 60 | Toggle switch |
| 61 | Supply and Fixing in Replacement of the following spare parts suitable for the 600 Kg/Hr Thermax Boiler, including complete removal of old, worn-out and unserviceable components as directed. The activity entails safe shutdown of the boiler, isolation of fuel, steam and electrical circuits, and dismantling of defective parts with due care to avoid damage to adjoining equipment. |
| 62 | Gland Washer (HTN-8) |
| 63 | Valve seat Assembly |
| 64 | Metallic Hose 3/8\" x 40\" |
| 65 | Oil Seal (HTN-5) |
| 66 | Oil Seal (HCA-7) |
| 67 | Ball Bearings (HCA-5) |
| 68 | Pressure Switch PVF 1.0 |
| 69 | Pressure Switch PVF 16 |
| 70 | Metallic Hose 1\" x 1.2m |
| 71 | Limit Switch |
| 72 | Photocell 8205 |
| 73 | Sequence controller MA 810 |
| 74 | Solenoid Coil |
| 75 | Electrode Assembly |
| 76 | Electrode Cap |
| 77 | High Tension Wire |
| 78 | Packing Hylam |
| 79 | Packing Asbestos |
| 80 | Gland Nut (HTN-6) |
| 81 | Oil Level Indicator |
| 82 | Sight glass 50mm |
| 83 | Ignition Transformer 14.5 KV |
| 84 | Temperature Controller 0-400V |
| 85 | RTD Assembly 2.5 mtrs |
| 86 | Safety valve 25mm |
| 87 | Plug & Socket |
| 88 | Hooter 4\" Dia |
| 89 | Lip Seal |
| 90 | Spider for love joy couple |
| 91 | Burner rod Without nozzle |
| 92 | Fuel Pump |
| 93 | Diffuser Plate 132mm dia |
| 94 | Nozzle 6.5 GPH, 45 Degree |
| 95 | Diesel line Y strainer 25mm dia |
| 96 | Diesel line globe Valve 25mm dia |
| 97 | Steam line Y strainer 25mm Dia |
| 98 | Steam line Globe valve 25mm Dia |
| 99 | Steam line Y strainer 40mm Dia |
| 100 | Supply and Fixing in Replacement of the following spares suitable for 100 Kg capacity Industrial Washing Machines of make Supershine and Megha Laundry, including complete removal of old, worn-out and unserviceable components as directed. The activity involves safe isolation of electrical, water and drain connections, dismantling of defective parts without causing damage to the machine frame or adjoining systems, and installation of new OEM-compatible spares listed in the schedule. |
| 101 | Digital temperature meter |
| 102 | Timer |
| 103 | Contactors ML 1, 3 Phase, 415 Volts |
| 104 | Contactors ML 2, 3 Phase, 415 Volts |
| 105 | Contactor relay M L 1, 3 phase, 415 volts |
| 106 | Revenger (Reverse Forward) |
| 107 | Water Level Indicator |
| 108 | Steam solenoid valve |
| 109 | Drain valve actuator |
| 110 | Main motor V-belt |
| 111 | Aux motor V-belt |
| 112 | Washing Machine main bearing |
| 113 | Reduction gear bearing |
| 114 | Indicator |
| 115 | Water inlet solenoid valve suitable for 100 kg washing machine |
| 116 | Water outlet solenoid valve suitable for 100 kg washing machine |
| 117 | Gland rope |
| 118 | Door Lock Knobs |
| 119 | Steam Valve (Globe) |
| 120 | Main motor bearings |
| 121 | Aux motor bearings |
| 122 | Toggle switch |
| 123 | Supply only of the following consumable items, complete as specified and directed. |
| 124 | Wax (Candle Powder) |
| 125 | Grease (Castrol Make) |
| 126 | Chemical salt |
| 127 | PPM Testing Liquid Set |
| 128 | Laundrex softener chemical |
| 129 | Laundrex Det |
| 130 | Laundrex boost |
| 131 | Laundrex neutral |
| 132 | Meghana Liquid Bleach |
| 133 | Supply and Fixing in Replacement of spare parts suitable for Industrial Calendar Machines of make Supershine and Megha Laundry Equipment, including complete removal of old, worn-out and unserviceable components as specified and directed. The activity involves safe shutdown of the machine, isolation of electrical and steam connections, dismantling of defective parts, and careful preparation of mounting surfaces prior to installation of new spares. |
| 134 | Variable frequency drive |
| 135 | Padding cloth |
| 136 | Blower Motor Rewinding |
| 137 | Temperature Meter |
| 138 | Speed Regulator |
| 139 | Push buttons (Red, Green, Blue) |
| 140 | NO-Element |
| 141 | NC-Element |
| 142 | Toggle Switch |
| 143 | Steam Solenoid Coil 15 mm |
| 144 | FLR Unit |
| 145 | Steam inlet Braided hose pipe 1\" x 2 ft |
| 146 | Pneumatic cylinders servicing only except spares |
| 147 | Wax for cleaning chest |
| 148 | Guide Ribbons |
| 149 | Painting for feeding plate |
| 150 | Grease for chain and gear wheel teeth |
| 151 | Steam trap servicing |
| 152 | Air line and steam line with all connectors |
| 153 | Lubrication oil and gear oil |
| 154 | Steam line Y strainer 25mm dia |
| 155 | Disconnecting the electric motor from the Washing Machine / Hydro Extractor / Drying Tumbler / Flat Bed Press / Boiler / or any other equipment in the laundry plant, and carrying out material and labour for rewinding the motor with super-enamelled copper wireusing the same gauge and winding configuration as per the original design. The work shall include complete dismantling, cleaning, rewinding, insulation and varnishing of the winding by heating method to enhance insulation strength, followed by reassembling, installation, commissioning and testing after repair/rewinding.The scope also includes replacement of worn-out components, greasing of bearings, gasket/gland packing, necessary balancing arrangements using rubber bushes, and ensuring smooth, vibration-free operation. The job further covers transportation of the motor from site to the workshop and back, and refixing the motor in its original position, complete in all respects as specified and directed, for the following capacities mentioned below:- |
| 156 | (a)up to 2 Hp |
| 157 | (b)above 2 HP to 5Hp |
| 158 | (c) above 5Hp to 10Hp |
| 159 | Material and Labour for descaling of the following laundry equipment using descaling chemicals, including complete cleaning, removal of scale deposits, flushing, and restoration of smooth operational flow, all as specified and directed. |
| 160 | Washing machine of 100 Kg capacity |
| 161 | Washing machine of 50 Kg capacity |
| 162 | 600 Kg/hr boiler |
| 163 | Supply and Fixing in Replacement of the following spare parts suitable for a 50 Kg capacity Hydro Extractor of make Megha Laundry Equipment, including complete removal of old, worn-out and unserviceable components, all as specified and directed. The work includes safe isolation of electrical connections, dismantling of defective parts, cleaning of mounting surfaces, and proper installation of new compatible spares listed in the schedule. The replacement will cover essential mechanical and electrical components such as bearings, V-belts, relays, timers, motor parts, shock absorbers, drain valves, control switches and other items required to restore smooth, vibration-free high-speed extraction. After fixing the new spares, the unit shall be reassembled, aligned, lubricated, balanced, and thoroughly tested to ensure proper rotation, safe braking, correct speed attainment, and trouble-free operation at the rated 50 Kg capacity. |
| 164 | Contactor M L 1, 3 phase, 415 volts |
| 165 | Timer relay |
| 166 | Transformer |
| 167 | Timer |
| 168 | Buffer |
| 169 | Limit switch |
| 170 | Main motor bearings |
| 171 | Push button |
| 172 | Motor to body springs |
| 173 | Rubber bush for Hydro Extractor |
| 174 | Hydro Extractor motor bearings |
| 175 | Bridge rectifier |
| 176 | Diode |
| 177 | Body Spring support Bolts |
| 178 | Bush |
| 179 | Draining out the fuel from the boiler fuel tank (capacity up to 1000 litres) and storing it safely in suitable containers; disconnecting all fuel lines, valves, and associated mechanical connections; carefully removing the tank from its position for thorough internal and external cleaning by removing accumulated dirt, sludge, and sediment. The work includes leak testing of the tank, carrying out necessary welding/brazing repairs, and applying one coat of synthetic enamel paint after surface preparation. Thereafter, refixing the fuel tank in its original position, reconnecting all fuel lines, replacing the drain plug and PVC pipe, calibrating the tank, refilling the drained fuel, and marking the litre graduations on the gauge, including provision of suitable locking arrangements, complete all as specified and directed by the Engineer-in-Charge. |
| 180 | Supply and Fixing in replacement of MS pipeline laid in trenches/ducts/underground/ surface/ wall /floor, including aluminium cladding with insulation, complete with all necessary fittings and accessories, such as bends, tees, unions, flanges, clamps, supports and fasteners, and making good the disturbed surfaces, all as specified and directed by the Engineer-in-Charge at the Laundry Plant, Military Hospital. |
| 181 | 2 1/2\" MS C Class Pipe |
| 182 | 2 1/2\" MS T/E Flanges |
| 183 | 2 1/2\" MS Long Bends |
| 184 | 25mm C Class Pipe |
| 185 | 25mm T/E MS Flange |
| 186 | 1\"x 6\" MS long Bends |
| 187 | 1\"x 6\" MS Nipples |
| 188 | 1\" Elbow |
| 189 | 1\" Tee |
| 190 | 1\" Steam Traps |
| 191 | 1\" MS Union |
| 192 | 1\" Axe Nipples |
| 193 | Bolts and Nutssuitable to existingPipes at Laundry plant , MH |
| 194 | 1/2\" Teflon tapes |
| 195 | 1\" globe valves |
| 196 | Welding Rods |
| 197 | Metallic Sheet |
| 198 | Cutting Wheels |
| 199 | Material and Labour for replacement of door beading for 50 Kg / 100 Kg Washing Machines and Drying Tumblers located at the MH Laundry Plant, including taking down the old unserviceable beading, cleaning the seating surfaces, fixing the new beading in proper alignment, ensuring leak-proof sealing, and testing for proper door closure, complete all as directed by the Engineer-in-Charge. |
| 200 | Supply and laying in replacement of Galvanised Iron (GI) medium-grade pipe, ISI-marked as per IS:1239 (Part-I), complete with all necessary fittings such as bends, tees, elbows, reducers, unions, plugs, sockets, and other accessories, laid in trenches and properly jointed and tested, complete all as specified and as directed, for the following sizes: – |
| 201 | 25mm dia bore |
| 202 | 40mm dia bore |
| 203 | 50mm dia bore |
| 204 | Supply and fixing Gun-metal glove in Replacement or gate valve with iron wheel head, screwed both ends for iron pipe and fixed of Following sizes: |
| 205 | 25mm dia bore |
| 206 | 40mm dia bore |
| 207 | 50mm dia bore |
| 208 | Excavation in trenches in hard/dense soil not exe-1.5 mtr deep and not exe 1.5 mtr wide and getting out complete all as specified. |
| 209 | Returning filling in and including spreading, levelling, watering and well remaining in layer not exceeding 25 cm complete all as specified |
| 210 | Removal of surplus soil to a distance not exceeding 50 mtr and depositing under directed at a level not exce1.5 mtr above the starting point all as specified |
| 211 | Supplying, laying and testing in Replacement of mild steel tubes 50 mm bore , ISI marked (IS-1239)(ISI marked) heavy grade with all fittings and fixtures laid in floors or fixed to wall, ceiling etc including necessary welding works including taking down old onecomplete all as specified. |
| 212 | Supply & fixing CI butterfly valve, flanged type,confirming to IS 13095 suitable for 50 mm bore pipe complete all as specified. |
| 213 | Supply & fixing of CI butterfly valve flanged type, confirming to IS 13095 suitable for 65 mm bore pipe complete all as specified. |
| 214 | S&F in Replacement MCCB 4 Pole, 415 V, Adjustable type, 160 Amps with breaking capacity 36 KA |
| 215 | S&F in Replacement MCCB 4 Pole, 415 V, Adjustable type, 200 Amps with breaking capacity 36 KA |
| 216 | S&F in Replacement MCCB 4 Pole, 415 V, Adjustable type, 250 Amps with breaking capacity 36 KA |
| 217 | Material and Labour for attending, repairing, and rectification of boiler complaints, including deployment of necessary T&P, safety devices, and materials as required at site, complete all as specified and directed: – |
| 218 | Material and Labour for attending, repairing, and rectification of Washing Machine complaints, including provision of necessary T&P, safety devices, and materials as required at site, complete all as specified and directed. |
| 219 | Material and Labour for attending, repairing, and arresting steam leakage and related complaints in steam pipe lines, including provision of necessary T&P, safety devices, and materials as required at site, for the following types of defects/complaints, complete all as specified and directed.Note for Item 26, 27 & 28: All spare parts, components, accessories or consumables that are found defective during inspection and are required to restore the Washing Machine to proper working condition shall not be deemed included in the quoted rate for attending, repairing, or rectification. Such spares will be measured and paid for separately under the respective items of Schedule, based on actual quantities replaced at site. The quoted rate under this item shall cover labour, fault diagnosis, dismantling, rectification, testing, and commissioning only, excluding the cost of spares. |
| 220 | S&F in Replacement Advance Maintenance Free G.I. SAFE EARTHINGElectrodewith PIPEof not less than 50 mm outer dia) and two meterlength, The electrode should be ofgalvanised (80 -100 micron) along with earth lead as Galvanised steel strip of size 32 X6 mm7.5 m . The GI Electrode shall be pre-filled with Crystalline Conductive Material (CCM) . The GI electrode shall be surrounded with 25 kg Backfill compoundto provide maximum contact between the electrode and Back Fill Compound. The earthing pitcover should be factory built (sizeTOP- 10 Inch, Bottom -13 Inch, Height 10.25 Inch ) made of heavy duty Polypropylenecomplete all as specified and directed.MakeASHLOK/INDELEC/JMV /TERCEL/TRUE POWER |
| 221 | Supply and replacement of trolley wheel made of Teflon, complete with bush, of wheel size 6 inch and base size 4 inch, including removal of the existing unserviceable wheel and fixing the new one in proper alignment, complete all as specified and directed. |
| 222 | Material and Labour for chimney repair, including all necessary dismantling, cleaning, replacement of damaged sections, sealing, alignment, and restoration works, complete all as specified and directed by the Engineer-in-Charge. |
| 223 | Supply and fixing in replacement of fully automatic Star–Delta Starter, panel-mounting type, without sheet-metal enclosure, complete with timer, relay, and contactor, including provision and fixing of two push buttons for panel-door mounting, suitable for operating a 25 HP pump set. The work includes necessary connections, testing, and commissioning at site, complete all as directed.Make: BCH / C&S / L&T |
| 224 | Disconnecting, transporting and dismantling the 1 HP induction motor for carrying out necessary repairs, and thereafter reassembling the motor and transporting it back to site, including re-installation in its original position with proper electrical connections and restoration of water inlet and outlet connections, complete all as specified and directed.Note:The cost of items replaced during repair shall be measured and paid separately under the respective items of Schedule ‘A’. |
| 225 | Dismantling the 5.0 HP induction motor of the 25 Kg Hydro Extractor for carrying out the required repairs, and thereafter reassembling the motor and re-installing it at site, including making all necessary electrical connections and restoring water inlet and outlet connections, complete all as specified and directed.Note:The cost of items replaced during repair shall be measured and paid separately under the respective items of Schedule ‘A’. |
| 226 | (a) Rewinding of the 5.0 HP motor complete using super-enamelled copper wire of appropriate gauge, matching the existing gauge and number of turns, including replacement of all insulating materials, proper layering, binding, and application of insulating varnish with heating/drying to achieve the required insulation level, all as directed. |
| 227 | Dismantling the 7.5 HP induction motor of the 50 Kg Hydro Extractor for carrying out the required repairs, and thereafter reassembling the motor and re-installing it at site, including making all necessary electrical connections and restoring water inlet and outlet connections, complete all as specified and directed. |
| 228 | (a) Rewinding of the 7.5 HP motor using super-enamelled copper wire of appropriate gauge, strictly matching the existing gauge and number of turns, including replacement of all required high-quality insulating materials, proper layering and binding, application of insulating varnish, and curing by heating to achieve the required insulation strength, complete all as directed. |
| 229 | Dismantling the 10.5 HP induction motor of the 100 Kg Washing Machine for carrying out the required repairs, and thereafter reassembling the motor and re-installing it at site, including making all necessary electrical connections and restoring water inlet and outlet connections, complete all as specified and directed. |
| 230 | a) Rewinding of the 10.5 HP motor using super-enamelled copper wire of appropriate gauge, strictly matching the existing gauge and number of turns, including replacement of all required high-quality insulating materials, proper layering and binding of coils, application of insulating varnish and curing by heating to achieve the required insulation strength, complete all as directed. |
| 231 | Dismantling the 3.0 HP induction motor of the 100 Kg Washing Machine for carrying out the required repairs, and thereafter reassembling the motor and re-installing it at site, including restoring all necessary electrical connections and water inlet and outlet connections, complete all as specified and directed. |
| 232 | (a) Rewinding of the 3.0 HP motor using super-enamelled copper wire of appropriate gauge, strictly matching the existing gauge and number of turns, including replacement of all required high-quality insulating materials, proper layering and binding of coils, application of insulating varnish and curing/heating to achieve the required insulation strength, complete all as directed. |
| 233 | Supply and fixing in replacement of spare parts suitable for RO Plants of 500 LPH capacity (02 No\"s), including taking down and removing the old unserviceable parts, installing new OEM-compatible spares, making all necessary connections, testing and commissioning to ensure proper functioning, complete all as specified and directed. |
| 234 | Filter for RO Plant 500 LPH |
| 235 | Carbon Sand |
| 236 | Sand |
| 237 | 40x40 Membrane |
| 238 | Flow meter |
| 239 | Pressure gauge |
| 240 | PTMT Ball Valve |
| 241 | Pump NRV of suitable size |
| 242 | UV System |
| 243 | PVC Pipe |
| 244 | Disconnection of the 0.5 HP raw-water feed pump, rewinding of the motor with appropriate gauge super-enamelled copper wire, including replacement of unserviceable bearings of suitable size, and complete reassembly of the motor. The work includes refixing/installation of the pump in its original position with all necessary electrical and plumbing connections restored, testing and commissioning, complete all as specified and directed. |
| 245 | Disconnecting the 500 LPH high-pressure pump, carrying out rewinding of the motor with appropriate gauge super-enamelled copper wire, including replacement of unserviceable bearings of suitable size, and complete reassembly of the motor. The work includes reinstallation of the pump in its original position with proper electrical and pipeline connections restored, testing and commissioning, complete all as specified and directed. |
| 246 | M&L for spray painting of 100kg capacity Washing machines at laundry plant MH (including inner and outer surface areas and motors also, except stainless steel part/electric panels/belts etc) by apply two coats of metal primer and painting withtwo coats synthetic enamel paint of existing colour after removing all dust & rust and paint by scrapping with scrapping material shall confirm to IS 2032 including marking of SM/MES Number for each washing machine with stencil letter with black or white paint and Font and Size of letter and white washing for PCC based plinth shall be directed by Engr-in-Charge. |
| 247 | All as per item no.45.00 above but for 50kg washing machines |
| 248 | M&L for spray painting of drying tumbler at laundry plant MH (including inner and outer surface areas, motors and economizer also, except stainless steel part/electric panels/belts etc) by apply two coats of metal primer and painting withtwo coats synthetic enamel paint of existing colour after removing all dust & rust and paint by scrapping with scrapping material shall confirm to IS 2032 including marking of SM/MES Number for each equipment with stencil letter with black or white paint and Font and Size of letter and white washing for PCC based plinth shall be directed by Engr-in-Charge. |
| 249 | M&L for spray painting of 50kg capacity hydro extractors at laundry plant MH (including inner and outer surface areas and motors also, except stainless steel part/electric panels/belts etc) by apply two coats of metal primer and painting withtwo coats synthetic enamel paint of existing colour after removing all dust & rust and paint shall confirm to IS 2032 including marking of SM/MES Number for each equipment with stencil letter with black or white paint and Font and Size of letter and white washing for PCC based plinth shall be directed by Engr-in-Charge. |
| 250 | All as per item no.48.00 but for 25kg Hydro extractor |
| 251 | M&L for internal servicing and cleaning of 20/40/80 kW solar inverters, including safe electrical isolation, opening of panels, thorough removal of dust and foreign matter, inspection and tightening of connections, checking cooling systems, functional testing after re-energisation, and restoration to normal operation, complete all as specified and directed. Note : Details of solar plants are 2 x 20 KW at MCEME, 03 x 20 KW at DGQA, 01 x 20 KW at AOC Centre, 1 x 40 KW at DGQA, 1x80 KW at 2 TB. |
| 252 | Checking of solar inverters of 20/40/80 kW capacity, including verification of operating parameters, alarms, fault logs, communication links, data transmission, and display units, rectification of minor issues, resetting alarms, ensuring proper monitoring and reporting, and confirming inverter performance after checks, complete all as specified and directed. |
| 253 | Inspection and tightening of all DC string connections of solar plants of 20/40/80 kW capacity, including checking string polarity, continuity, connectors, junction boxes, and termination points, ensuring proper torque, eliminating loose contacts, overheating, or sparking, and confirming safe and reliable DC power flow, complete all as specified and directed. |
| 254 | Supply and replacement of 4 sqmm, 1.8 kV DC solar cable, including removal of damaged cable, laying, dressing, termination with suitable lugs/connectors, insulation, continuity testing, and commissioning, ensuring proper routing, protection, and safe operation of the solar system, complete all as specified and directed. |
| 255 | Supply and fixing of MC4 connectors (male and female), including crimping to solar DC cables, proper polarity matching, secure locking, insulation checking, continuity testing, and ensuring weatherproof, reliable, and safe DC connections in the solar photovoltaic system, complete all as specified and directed. |
| 256 | Dressing of all existing DC cables, including proper routing, clamping, grouping, alignment, and securing on trays or structures, eliminating sagging and damage, ensuring neat appearance, mechanical protection, and safe operation of the solar photovoltaic system, complete all as specified and directed. |
| 257 | Material and labour for cleaning of solar photovoltaic (PV) panels, including safe access arrangements and shutdown precautions where required. Loose dust, bird droppings, and debris shall be gently removed using soft brushes or low-pressure water spray, preferably during early morning or evening hours to avoid thermal shock. Panels shall then be cleaned using clean potable water or approved mild cleaning solution with soft brushes/microfiber cloths, working from top to bottom. Final rinsing shall be carried out thoroughly, followed by natural air drying or use of rubber squeegees. Use of pressure washers, abrasive tools, or harsh chemicals is strictly prohibited to prevent surface damage and ensure maximum energy efficiency, complete all as specified and as directed. Note : All solar plant 2 x 20 KW at MCEME, 03 x 20 KW at DGQA, 01 x 20 KW at AOC Centre, 1 x 40 KW at DGQA, 1x80 KW at 2 TB will be cleaned in one job for each month. |
| 258 | Supply, fixing, testing, and commissioning in replacement of damaged or broken mono-crystalline silicon solar photovoltaic modules of 400 Wp or higher capacity, damaged due to storm damage, tree branches, monkeys or other mechanical causes. The modules shall have a module power form fill factor greater than 0.76 and a performance ratio exceeding 75%. Modules shall be manufactured with high-transmissivity front glass, providing transmittance above 90%, high encapsulation gain, and bending less than 0.3%. The work shall include safe removal of damaged modules, installation of new modules with proper mounting, electrical connections, alignment, testing, and commissioning to ensure optimal performance, complete all as specified and as directed. |
| 259 | Spreading riddled earth ( after preparation of excavated earth) inCable duct with sandcushioning of cable laid in trenches complete all as directed by Engineer-in-Charge.Note:- Punned thickness 18 CM( 6.25 Cm below cale and 11.75 cm above cable)will be measured for payment purpose.Quoted rate inclusive of all arrangement as mentioned. |
| 260 | Supply and Laying bricks, common burnt clay building bricks, sub class \"B\" of size 230 x 115 x 75 mm laid across in trenches for cable protection complete all as specified and directed. |
| 261 | M&L for earthing complete with GI earth plate electrode of size 60cm x 60cm x 6 mm thick burried directly in ground (earth pit not less than 2.25 m deep below ground level) with top edge of the plate not less than 1.5m below the normal ground level connected with GI strip 32 x 6mmby means of bolts, nuts, check nuts & washers of galvanished iron steel including necessary excavation and earth work in any type of soil, removing surplus soilto a distance not exc 50m, with and including PCC chamber in PCC (1:2:4), type B1,using (20mm graded stone aggregate),\"mild steel angle iron frame\" made out of MS angle iron of size 40x40x6mm thick duly painted with two coats of synthetic enamel paint over one coat of red oxide zinc chrome primer hinged with and including 6mm thick CI cover with handle, watering arrangement with funnel internally secured with wire mesh with 20mm dia mediumgrade pipe for watering 40mm dia light grade, GI pipe for lead protection in and including alternate layers of charcoal dust and common salt complete all as shown inelectrical \"plate No \"3\" and connected to earthing test point all as specified and indicated including testing on completion including retrieving old GI earth plate, CI cover, GI pipes, angle iron frame from existing earthing complete all as specified and directed. |
| 262 | Dismantling and taking out old UNSV GI Strip and Supply, fix earth continuity conductor or main earthing lead fixed to wall on batten or fixed to pole GI strip 32 x 6 mmcomplete with S&F of suitable fixing arrangement, nuts, bolts and washers etc all as specified and directed. |
| 263 | M&L of cross arms i.e bracing supporting clamps back plates, nuts, bolts and washers complete including one under coat and one finishing coat with synthetic enamel paint over a coat of red oxide primer &including taking down old unserviceable complete all as directed by Engineer-in-Charge. |
| 264 | M&L in repairs for LT panel thorough cleaning of the surface to remove all dirt, loose deposits, rust, and deteriorated paint by wire brushing, scraping, or sanding, followed by the application of rust remover/convertor wherever necessary. After proper surface preparation, one coat of approved epoxy-based zinc chromate primer or equivalent anti-corrosive primer shall be applied, followed by two coats of industrial-grade anti-corrosive enamel/epoxy paint of approved make and shade, suitable for outdoor service conditions. During painting, all instruments, nameplates, meters, semaphore indicators, and operating handles shall be properly masked and protected, and on completion, all identification markings, panel numbers, and safety labels shall be restored to their original condition. |
| 265 | Supply and layin replacement of cable lay in trenches/fixed to walls/poles etc connecting buy using lugs, testingand commissioning XLPE insulated and PVC sheathed heavy duty LT 1100 Volts grade armoured under ground cable with stranded aluminium conductor 4 core 25 sqmm Sqmm complete all, as specified and directed.Note :- Earth work excavation, sand cushioning and brick protection shall be measured and paid separately. |
| 266 | All as per item no 64.00 above but 3.5 Core 35 Sqmm |
| 267 | All as per item no 64.00 above but 3.5 Core 50 Sqmm |
| 268 | All as per item no 64.00 above but 3.5 Core 70 Sqmm |
| 269 | All as per item no 64.00 above but 3.5 Core 95 Sqmm |
| 270 | Supply & Replace in replacement MCCB along with both side spreader link and nut bolts of appropriate size(Conforms to IEC:60947-II/IS:13947-II) in exisitng LT Panel box/Feeder Pillar boxes (KIOSK),in MCCB DBsof capacity 125 Amps, 4 pole, 16 KA, 415 Volt including disconnecting/taking out existing old unsv/burned MCCB complete all as specified and directed. |
| 271 | All as per item no 69.00 here in before but of capacity 100 Amps, 4 pole, 16 KA |
| 272 | All as per item no 69.00 here in before but of capacity 63 Amps, 4 pole, 16 KA |
| 273 | Supply and fixing in replacement of automatic street light switch using infrared sensor based nature switch for automatic switching of street lights.Nature switch operation should bebased on natural light lux level. Required illuminance level for switching on is < 30 Lux and for switching off >10 lux. The sensor should also have part night operation facility of min 4 hrs to max 12 hrs.The sensor along with suitable power contactors incoming outgoing MCBS SP andand automanual (sensor bypass selection option should be enclosed in a pole /wall mountable enclosure made of rust proof electric shock proof termite proof and FR grade SMC Box conforming to IP54 single phase load of 8 KW with circuit wiringmin 10 sq mm copper wire 63 Ampscontactorans suitable MCBs atboth positions at incoming and out goings of breaking capacity 10 KA complete including necessary clamp (2 sets) / anchor bolt(4 nos)for fixing on pole / walllcomplete all as directed including taking down old one .Model no Swadeep-02 EC 8KW 1P or equivalent from Havells/Legrand . |
| 274 | Supply and fixing in replacement of automatic street light switch using infrared sensor based nature switch for automatic switching of street lights.Nature switch operation should bebased on natural light lux level. Required illuminance level for switching on is < 30 Lux and for switching off >10 lux. The sensor should also have part night operation facility of min 4 hrs to max 12 hrs.The sensor along with suitable power contactors incoming outgoing MCBS SP andand automanual (sensor bypass selection option should be enclosed in a pole /wall mountable enclosure made of rust proof electric shock proof termite proof and FR grade SMC Box conforming to IP54 three phase load of 12 KW with circuit wiringmin 10 sq mm, 3 nos contactor each of 40 - 50 amps, incoming outgoing MCB (3 nos) rating 40 amps of breaking capacity 10 KA complete including necessary clamp (2 sets) / anchor bolt(4 nos)for fixing on pole / walllcomplete all as directed including taking down old one Model no Swadeep-02 EC 12KW 3P or equivalent from Havells/Legrand . |
| 275 | Supply and layingin replacement of GI tubing light grade of size 50 mm for cable protection on road/drain/floor/poleISI marked. |
| 276 | Supply and layingin replacement of GI tubing light grade of size 80 mm for cable protection on road/drain/floor/pole ISI marked. |
| 277 | Supply and install, testing and commissioningin replacement ofOut door LT feeder panel factory made cubicle type of suitable size and 3.15 mm thick CRCA sheet outdoor type vermin proof with Aluminium bus bar of size as per rating of MCCBsAl strip 3 phase and neutral connections with neutral colour coded with heat and shrinkable PVC sleeves, with necessary supports, angle iron frame work and stand, locking arrangements and painted with one coat of red oxide primer and two coats of powder coated paint with suitable size of panel control copper wiring, accessories are fitted on suitable insulator all housed in suitable bus bar chamber andprovision and fixing of digital Voltmeter,Ammeter with built in selector switch, CTs of suitable ratio, and pilot indication lamps completealong with provision of necessary cable entry/exit boxes for all incoming and out going cables with suitable cable glands incl PCC foundation etc complete testing and commissioning complete andconsisting the following :- |
| 278 | (a)MCCB 4 Pole 400 Amps 36KA -01 No. Thermal Magnetic release (incommer)(b)MCCB 4 Pole 200 Amps 25KA -02 Nos. (Outgoing)(c) MCCB 4 Pole 160 Amps 25KA -02 Nos. (Outgoing)(d) MCCB 4 Pole 100 Amps 16KA -01 Nos. (Outgoing)(e) Digital multimeter operated on 400/5A LT-CT operated complete - 01 No(e) Indicating type lamp for Red, Yellow and Blue phases - 01 SetNote :(a) All existing incoming and out going cables are to be connected to the abovepanel with proper lugs, glands nuts, bolts etc the cost of work is deemed to be included in the above item..(b) The cost shall also be include thebreaking of floors/walls etc including digging of trenches for removing of cables of loops and connecting to the new panel boards and making good the disturbed surfaces to match with the existing surfaces |
| 279 | M&L for replacement of broken earth pit made out of PCC 1:2:4 type B1 using 20 mm graded crushed stone aggregate, 20 mm thick and earth pit cover made out of RCC 1:2:4 type B1, cover reinforced with 8 mm dia MS deformed bars @ 100 mm centre to centre both ways with hook made out of 8 mm dia bar, watering arrangement with funnel and wire mesh and including reconnecting of earth lead of any type with new nuts, bolts and washers etc as required at site complete all as specified and directed. |
| 280 | Cutting the existing road/PCC surface straight by manual, depth and width not less than 1 mtr below ground level for passing of underground cable and filling back with excavated soil upto 75% road portion and 25% shall be made with cement concrete 1:2:4 (using 20 mm graded aggregate stone complete all as specified and directed. |
| SR No | FileName | File Description |
| 1 | Click here to download tender document | Tender Documents |
| 2 | Click here to download tender document | Tender Documents |
| 3 | Click here to download tender document | Tender Documents |
| 4 | Click here to download tender document | Tender Documents |
Copyright © 2026 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail