Dismatling brick work or stone work in lime or cement mortar and including stacking of materials as directed by Engineer-in-charge with in a distance of 60 mt (200feet).
3
Earth work excavation in foundation in ordinary soil including lift UP to 1.5m and lead 30mm with filling watering and raining of excavation of earth as per S.I. No-251
4
Concrete with 40mm gauge stone ballest, cement and sand in foundation in the proportion of 8:4:1 including supply of all material, labour,tools &plant as per S.I No-281
5
R.C.C work in 1:2:4 cement, c/sand & 20mm gauge sone grit IN SLAB etc as per S.I. No-284A
6
Mild steel or iron in plain work such as reinforced concrete or reinforced brick work etc SI No-504
7
Finishing wall with Premium acrylic smooth exterior paint with silicone additives of required shade. New york (two or more coat applied @ 1.43 ltr/10sqm over and including priming coat of exterior primer applied @ 2.20kg/10sqm) (apex Ultima, Weather coat all guard) asian berger. SI.NO.23 CH-15
8
Cleaning at site all complete work etc.
9
ADD GST 18% Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.