| 1 | Comprehensive/ Preventive maintenance of 2x80 TR central AC Plant make- Voltas and comprising/connected equipments of Centralized AC Plant and replacing any type of unsv spares/parts i.e. micro processed unit control modules of plant, screw type compressor, evaporator , electronical expansion valve, water cooled condenser with integral sub cooler, oil cooler, oil piping, oil filter, refrigerant filters,semi synthetic type 1 RTHB refrigeration oil , refrigeration oil lubricant ISO-68 polyester, RTHD (Recommended by the OEM), pressure switch, solenoid switch, driers, humidify heaters, hot water generator (75 KW), thermostatic valves, check valves, balancing valve, temperature gauge, water pressure gauge, water flow switch, low pressure control, high pressure control, industrial thermostat and automatic control valves, charging of refrigerant R-134a or any type etc. as and when required including brazing of copper tubingto avoid leakage for smooth functioning of central AC Plant and maintain the temperature 22+2 degree centigrade. |
| 2 | Note for item 1.00:-(a) The 02 (Two) preventive / periodical maintenance services and 01 (one) annual comprehensive maintenance service to each chiller machines (02 nos) of Make : M/s VOLTAS LTD. of screw type compressor, 80 TR each. The contractor shall submit the record of periodical/preventive/Annual maintenance services carried out by M/s VOLTAS LTD.(b) The cost ofcompressor oil, as and when required to be replaced / replenished during the entire contract period is deemed to be paid as separately item (as required).(c) The repair / replacement cost (M&L) of all defective parts / spares of AC plant higher side ( flange to flange), as and when required, is deemed to be included in quoted rates and no extra cost shall be paid to the contractor in this effect at any stage.(d) The cost of transportation (to and fro) and other necessary equipment shall be arranged / brought by contractor to complete the job and no extra cost shall be paid to the contractor in this effect. |
| 3 | Note for item 1.00 (Contd..):-(e) Contractor has to carry out all major and minor break down/repairs pertains to complete machineries of central AC Plant & connected items i.e. rates quoted by the contractor shall bedeemed to be included for all except any damage due to natural disasters such as flash, floods, earth quake, cyclone etc. (f) The entire work as mentioned in srl item no 1.00, shall be got executed through OEM i.e. M/s VOLTAS LTD. only. The contractor will have to submit MoU on stamp paper of Rs. 100/- duly notarized as per proforma mentioned in tender document within fifteen days from date of acceptance of tender, failing which the contract will be liable to be cancelled and work will executed as per policy invouge of the contractors default.(g) The chiller machines along with connected items will be handed over to contractor in running condition, but with fair wear & tear which can be meet out through annual comprehensive maintenance. Hence, the bidder is advised to visit the site to assess the quantum of work to be carried out in this contract and quote their rates accordingly and no claim in this effect will be accepted at any stage.(h) All the complained / faults will be addressed within 30 min from the time of receipt of complaint. If, contractor or his tradesmen fails to attend the complained within 2 hrs from the time of receipt of complaint, the compensation/penalty of Rs. 500.00 (Rupees Five Hundred only) per complaint per hr for first 04 hrs and after that Rs. 1000.00 (Rupees One Thousand only) per complaint per hr shall be recovered from the contractor’s dues. |
| 4 | Dismantling compressor ofcentral AC plantfor overhauling complete with connected pipe line and loading unloading mechanism &disconnecting of electric motor of compressor, refrigerant line, gauges pipe and carry out the general over hauling of compressor ofcapacity 2 x 40 TR, including replacement of springs, aluminiumwasher packing, screw, lath work, cleaning with detergent & cotton waste, changing of compressor oil etc. and cleaning the suction filter, oil filter, replacing the defective parts and making compete system functional for safe guard the gas with self pumping down system or with total recovery unit system including following operation complete all as specified & directed: -Note :- (i) Charging of Nitrogen Gas inunit & complete system at 300 psi pressure and checking of any dropping of pressure / leakage up to 24 Hrs after overhauling of compressor & rectification of leakage if any.(ii) Vaccumisation of complete system for minimum 2 days for dropping of vacuum pressure& rectification of leakage if any.(iii) Testing & commissioning of compressor after completion. (iv) Spare parts of compressor, required to be replaced, shall be measured and paid separately as \"Supplyonly in replacement \" under respective item of this schedule (Srl Item Nos 2.01 to 2.12).However, cost of labour shall deemed to be included in quoted rate for this item. |
| 5 | Shaft seal assembly. |
| 6 | Liner. |
| 7 | Piston. |
| 8 | Main bush. |
| 9 | Gasket set for compressor of capacity 40 TR, Model No. 4/100. |
| 10 | Suction and discharge reed. |
| 11 | Piston ring set. |
| 12 | Piston pin with lock. |
| 13 | Half section bearings. |
| 14 | Brass bushes for connecting rods. |
| 15 | Oil strainer. |
| 16 | Oil pump |
| 17 | Material and labour for de-scaling condensers of central AC plant2 x 40 TR capacity of condenser by opening side plate, flushing the condenser tubes using de-scaling solution, Roding the condenser tubes carefully removing all the deposited materials completely and raising the solution through condenser tubes till clear water starts to come out from the condensers as complete including re-fixing the side plates by replacing gaskets & testing complete for satisfactory working at complete all as specified and as directed. |
| 18 | Material and labour for leakage detection of chiller and condenser pipe lines by charging dry Nitrogen Gas and with standing pressure for 24 hours, rectification of leakages, evacuation of the system as per manufacturer’s instruction complete all as specified and as directed for capacity of 2x40 TR AC plantThe rates quoted by the contractor shall deemed to include the cost of Nitrogen gas, charges for T&P and empty cylinders. And rectification of leakages include changing of any type of valve, brazing if any copper piping. |
| 19 | M&L for preparation of surfaces of Central AC Plant of capacity 2 x 40 TR, trap door, condensers, chillers, compressors, Induction motors, pumps, hot water boiler, C channels, all pipe lines, valves and outer body of cooling towers and AHU\"s with different colors following the color code system as directed by the site-in-charge. Job includes removing the old paint by rubbing, brushing and applying one coat of red oxide zinc chrome primer and two coats of Synthetic Enamel Paint (1st grade quality) complete all as specified and as directed. |
| 20 | ditto- all as per item No. 5.00 above but Capacity of AC Plant 2x 80 TR AC plant |
| 21 | Supply and fixing in repairs of shock absorbing rubber pads at the bottom of the AHU (cap 17000 cfm) unit for absorbing shocks and vibrations, heavy duty of size as per site requirement complete all as specified and as directed. (Note:- Unserviceable materials are contractors property) |
| 22 | Supply and fixing in repairs of brass safety valve complete suitable for compressor of capacity 40 TR, complete all as specified and as directed. |
| 23 | Material and labour for insulation of pipe line( dia of pipe 80mm-100mm) upto 13mm thickness closed cell chemically cross linked fire retardant polyethylene foam insulation type W3CF2 of density 30 Kg/cum and covered with aluminium foil complete with application of rubber based adhesive including taking down unserviceable old one complete all as specified and as directed. |
| 24 | Supply and fixing in repairs of electronic timer( 0 to 60 Sec) type Series suitable for existing unit, complete all as specified and as directed. |
| 25 | Material and Labour for frame work with angle ironfor frame support, with fabrication, welding joining including cutting tops to shape as directed, drilling holes, notching for wire, etc.; flat iron fillets (for securing wire mesh etc.) including all necessary drilling,boltingor riveting, etc., and similar work conforming to Fe-290 Gde E-165 including taking down old unserviceable one complete all as specified and as directed. |
| 26 | Disconnecting from mains/taking out existing unserviceable/defectiveMonoblock Pump set upto 7.5 HP Capacity and repair/ replacement of bushings, worn out nuts, bolts washers, gaskets, gland etc. and positioning the pump set and connecting up in existing position and testing, complete all as specified and as directed. |
| 27 | Disconnecting from mains/taking out existing unserviceable/defectivemotor of capacity 7.5 HP and make including disconnecting all electrical connectionsremoving from foundation transporting to repair workshop disconnecting unserviceable burn out winding completely including insulating materials and rewinding of the complete stator with super enameled copper wire of existing size applying proper insulation ‘F’ class varnish drying in oven, assembling, transporting back to site, re-installation, testing and commissioning complete all as specified and as directed. (Note :- Transportation Charges from siteto trade workshop and back to original location after repair shall be deemed to be included in unit quoted rate.) |
| 28 | Disconnecting from mains/taking out existing unserviceable/defectivemotor of capacity 2 HP to 5 HP of any size, type, and make including disconnecting all electrical connectionsremoving from foundation transporting to repair workshop disconnecting unserviceable burn out winding completely including insulating materials and rewinding of the complete stator with super enameled copper wire of existing size applying proper insulation ‘F’ class varnish drying in oven, assembling, transporting back to site, re-installation, testing and commissioning complete all as specified and as directed. Note :- Transportation Charges from siteto trade workshop and back to original location after repair shall be deemed to be included in unit quoted rate. |
| 29 | Material and labour for Overhauling and repairing of any size refrigerant suction/ delivery liquid line valve including servicing of valve, replacement of packing material, sealing rings, Teflon washers and testing complete all as specified and as directed. |
| 30 | Supply & fixing in repairs Low pressure control /cut off switch type MP-1, complete all as specified and as directed. |
| 31 | Supply & fixing in repairs High pressure control / cut off switch type MP-5,complete all as specified and as directed. |
| 32 | Supply & fixing in repairs Oil pressure control / cut off switch type MP-55 ,complete all as specified and as directed. |
| 33 | Supply and fixing in repairs thermostat suitable for central type A/C Plants Range 5 to 25°C complete all as specified and as directed. |
| 34 | Supply and fixing in repairs Bakelite terminal plate including brass studs, bolts and nuts etc. suitable to match any make of 3 phase electric motors and capacity up to 10 HP,complete all as specified and as directed. |
| 35 | Supply and fixing in repairs Porcelain/ Bakelite terminal bush suitable for terminal boxes of three phase motors upto 7.5 HP capacity, complete all as specified and as directed. |
| 36 | Supply and fixing in repairs thermometer suitable for condenser water line with suitable housing for mounting on pipe line 0-50°C,complete all as specified and as directed. |
| 37 | Supply and fixing in repairs Compound pressure gauge (Discharge pressure) of size 100 mm dia suitable for 0 to 300 PSI, complete all as specified and as directed. |
| 38 | Supply and fixing in repairs Compound suction and Oil pressure gauge of size 100 mm dia suitable for 0 to 150 PSI,complete all as specified and as directed. |
| 39 | M & L for servicing of expansion valves of any make and type including checking, adjusting the power element for smooth functioning including replacement of defective Teflon Washers, ‘O’ rings etc. seats,complete all as specified and as directed. |
| 40 | Supply and fixing in repairs Brass thermostatic expansion valve suitable for compressor of capacity 40 TR ofcomplete all as specified and as directed. |
| 41 | Supply and fixing in repairs oil pump kit complete suitable for Voltas compressor of capacity 40 TR complete all as specified and as directed. |
| 42 | Supply and fixing in repairs indicator lamp assembly complete LED type suitable for the existing system supply voltage 230V / 440V AC,complete all as specified and as directed. |
| 43 | Supply and fixing in repairs V-belt of suitable size for compressor to motor and AHU of existing size complete all as specified and as directed. |
| 44 | Supply and fixing in repairs cast iron butter fly valves lever operated SS disc type nitrile/EPDM rubber lining PN 16 of dia 65 mm, complete all as specified and as directed. |
| 45 | ditto- all as per item No. 30.00 above but 80mm dia. |
| 46 | ditto- all as per item No. 30.00 above but 100mm dia. |
| 47 | ditto- all as per item No. 30.00 above but 150mm dia. |
| 48 | M&L for machining, grinding and polishing of crank shaft and making the crank shaft suitable for normal running and matching the dia to the main bush and connecting rod and bearings for the compressor ofcapacity 40 TR, complete all as specified and as directed. |
| 49 | Dismantling the old broken fan hub assembly including blades of cooling tower and replacement with new fan hub assembly with dry cast aluminium blades heavy duty as per existing size including U-clamps, nuts, bolts & washers suitable for cooling tower for 2x40 TR plant complete all as specified and as directed. |
| 50 | Disconnecting the defective FRP cooling tower of Cap 40 TR and repair the same by replacing defective broken/unserviceable spare parts including repair to minor leakages & assembling, testing & commissioning for satisfactory performance complete all as specified and as directed.Note:- (i) Required Spare parts shall be measured and paid separately as \"Supply only\" under relevant items. (ii) Labour charges for taking down old spares and fixing of new sparesshall deemed to be included in unit quoted rate. |
| 51 | ditto- all as per item No. 36.00 above but FRP cooling tower of Capacity 80 TR, complete all as specified and as directed. |
| 52 | Supply only of following spare parts for FRP cooling tower complete all as specified and as directed. |
| 53 | PVC branch pipe set of 4 Nos dia 100 mm dia as per existing length, complete all as specified and as directed. |
| 54 | Eliminator FRP |
| 55 | PVC fills honey comb suitable for cooling tower of capacity 2 x 40 TR & 2 x 80 TR, complete all as specified and as directed. |
| 56 | PVC Pipe 63 mm dia 3 Mtr long |
| 57 | PVC End Cap 63 mm |
| 58 | PVC Socket |
| 59 | PVC End cap 100 mm |
| 60 | Nut Bolt any size |
| 61 | FRP Compound |
| 62 | PVC sprinkler Nozzle 40 mm.Note for item Nos 38.01 to 38.10 :- (i) Materials of item Nos. 38.01 to 38.10 be incorporated in item No 36 & 37 here-in-before. (ii)Labour charge of item Nos. 38.01 to 38.10 are deemed to be included in the quoted rate in item Nos. 36 & 37 here-in-before. (iii) Make of item Nos. 36 & 37 as approved by Accepting officer. |
| 63 | Taking out unserviceable defective finned strip heater and supply and fixing strip heater 3 KW suitable for AC plantincluding provision of nuts, bolts & washers etc, complete all as specified and as directed. |
| 64 | Attending complaint of control panel wiring of AC plant and making it fully serviceable with and including PVC tape, PVC tie, Nut bolt, and other items complete all as specified and directed.Notes: - After intimation ofbreakdownby Engineer in Charge/ JE E&M through telephone or verbally, the contractor shall arrange theMechanic to attend the complaint within 2 hours and make the plant functional.If contractor failed to attend complaint with in time frame, a penalty of Rs 400/- per Hrs per complaint shall imposed on contractor and shall be recovered from contractor\"s dues |
| 65 | Material and labour for maintenance of feeder pillar/LT panel indoor/outdoor type including removing the carbonized/melted sparked thimbles, cleaning the carbonized bus bar making cable ends fresh and supply and crimping new thimbles/lugs and fixing the cable on bus bar/MCCB/Main switch/MCB including providing new nut bolts and washer if required greasing the doors of feeder pillar/LT panel outdoor/indoor type complete all as specified and as directed. |
| 66 | Material & Labour for earthing with galvanised steel earth plate electrode of size 60cmx60cm x6mm thick buried directly in ground (earth pit not less than 2.25m deep below the ground level) with top edge of the plate not less than 1.5m below normal ground level,connected to the galvanised earth lead by means of bolts, nuts check nuts and washers of galvanised iron wire 4mm as earth lead as shown in electrical plate No. 3 of SSR Part-I connected to earthing test point all as specified or indicated including testing on completion including necessary excavation andearth work insoft/loose soil, returning filling, disposal of surplus soil, earth pit in PCC 1:3:6 type C-1 using 20mm graded stone aggregatepit, funnel,20mm dia GI medium grade watering pipe, 15mm dia GI medium grade earth lead protection pipe and pre-cast earth pit cover 50mm thick made of RCC (1:1.5:3) type A1 duly reinforced with 8mm dia TMT bar @100mm c/c both ways, one lifting handle made out of 10mm dia TMT bar 250mm long embedded in cover slab and cover, wire, copper lugs etc. mesh, charcoal and common salt in alternate layer of 15cm thick including taking down old unserviceable one complete all as specified and directed. |
| 67 | Disconnecting from mains/taking out existing unserviceable/defectivemotor of capacity 5 to 10 HP of any type, and make including disconnecting all electrical connectionsremoving from foundation transporting to repair workshop disconnecting unserviceable burn out winding completely including insulating materials and rewinding of the complete stator with super enameled copper wire of existing size applying proper insulation ‘F’ class varnish drying in oven, assembling, transporting back to site, re-installation, testing and commissioning complete all as specified and as directed. |
| 68 | Material and labour for taking out the old u/s exhaust fans upto 450mm sweep from various substations/locations and cutting the worn out windings and rewinding the same with suitable gauge copper wire, including capacitor of suitable capacity, any other repair work required, including painting with two coats of synthetic enamel paint (1st grade quality) through spray machine of existing tint/colour complete all as specified and as directed. |
| 69 | Supply and fixing MCB TP 240 volts 40 Amps, 10 kA, \"C\" curve, complete all as specified and as directed. |
| 70 | Supply and fixing MCB TP 240 volts 63 Amps, 10 kA, \"C\" curve, complete all as specified and as directed. |
| 71 | Supply & fixing PVC insulated single core copper conductor cable of size 10 sqmm for connections in LT Panels including copper thimbles including taking down old unserviceable one,complete all as specified and as directed. |
| 72 | M & L for repair of interlock wiring of the AC plant, considering the smoothing function of working and stand by items installed at plant, making it fully serviceable with including provision of fixingall size of wires to be used inside panel, Copper thimble, PVC tape, Bakelite, connection plate, Nut bolt etc. to be paid under relent items in BOQ as requiredcomplete all as specified and directed. |
| 73 | Supply & fixing in repairs aluminium lugs for cable of cross sectional area 10 Sqmm, complete all as specified and as directed. |
| 74 | Supply & fixing in repairs aluminium lugs for cable of cross sectional area 16 Sqmm, complete all as specified and as directed. |
| 75 | Supply & fixing in repairs aluminium lugs for cable of cross sectional area 25 Sqmm, complete all as specified and as directed. |
| 76 | Supply & fixing in repairs aluminium lugs for cable of cross sectional area 35 Sqmm, complete all as specified and as directed. |
| 77 | Supply & fixing in repairs aluminium lugs for cable of cross sectional area 75 Sqmm, complete all as specified and as directed. |
| 78 | Supply & fixing in repairs aluminium lugs for cable of cross sectional area 95 Sqmm, complete all as specified and as directed. |
| 79 | Supply & fixing in repairs copper lugs for cable of cross sectional area 10 Sqmm, complete all as specified and as directed. |
| 80 | Supply and topping up Refrigerator Gas R-22, complete all as specified and as directed. |
| 81 | Supply and topping up Compressor Oil N-68 complete all as specified and as directed. |
| 82 | Supply and topping up Refrigerator Gas R-134A, complete all as specified and as directed. |
| 83 | Supplying and fixing in repairs of 25mm bore dia gun metal gate valve withiron wheel head screwed both ends foriron pipe, complete all as specified and as directed. |
| 84 | Supplying and fixing in repairs of 40mm bore dia gun metal gate valve withiron wheel head screwed both ends foriron pipe, complete all as specified and as directed. |
| 85 | Supplying and fixing in repairs of 50mm bore dia gun metal gate valve withiron wheel head screwed both ends foriron, pipe complete all as specified and as directed. |
| 86 | M&L for comprehensive maintenance of 125 KVA -01 Nos Servo Voltage Stabilizer/ Servo Voltage Regulatorcomplete all as specified and directed.Contract Details:- (i) Free maintenance and repair of Normal accessories (Spare Parts) .- 01 Nos Servo Voltage Stabilizer/ Servo Voltage Regulator. (ii) Preventive maintenance of all systems on quarterly basis. (iii) Attending all complaints within 24 working hours.Note:- (a) The rates quoted by the contractor shall deemed to be inclusive of T&P etc.(b) Major Spares Part shall be measured and paid for separately under respective item of this Schedule as supply only. (c) Dismantling and removing of defective voltage stabilizer from 500 KVA to 500 KVA any size and capacity ,removing to workshop for repair, opening up and taking out coil, core and core assembly for estimation of repair and damaged parts cleaning/washing of tanks and removing the dust from all parts including cores, tanks, cooling tubes, removal of damaged parts making connection and assembling complete in all respects after repair of coils IC\"s, Regulators, Condensors, Triac, Transistors etc. respective cards nuts and bolts, refilling of transformer oil, installation and testing on full load fortesting complete all as specified and as directed. Note: 1. Spare parts and winding coils as mentioned under respective items of schedule shallbe measured and paid for separately as supply only. These shall be identical to those specified by original manufacturer.Note 2. : The job also incl. shifting through crane with necessary accessories & to and fro transportation from site to work shop and vise- versa. |
| 87 | Repair and rewinding of 100 amp dimmer |
| 88 | Repair and rewinding buck/boost loading transformer cap. 125 KVA.(each phase) |
| 89 | S&F cut off circuit with contractor cap 200 Amp TP. |
| 90 | S&F control wiring |
| 91 | S&F Power wiring and copper thimble |
| 92 | Input/output connection cap 100 Amp |
| 93 | M&L for painting of Servo Voltage Stabilizer any capacity after cleaning the body surface of panel by rubbing with emery Paper to remove oil stains, dust etc. and applying two coat of synthetic enamel paintby spray paint incl writing SM No/MES No as per existing pattern, complete all as specified and as directed. |
| 94 | Supply & topping up ofoil for voltage stabilizer up to required level for voltage stabilizers of dielectric strength 50 KV &aboveall as per IS specification, complete all as specified and as directed.. |