| 1 | Dismantling and removing the damaged / old barbed wirein the existing fencing including rollIing and stacking within lead of kms including the cost of transportation , lead , lift, labour, tools, plant, equipment etc. complete. |
| 2 | Dismantling Cement Concrete manually/ by mechanical means including disposal of material within 50 meter lead as per direction of Engineer-in-charge and stacking the seviciable materails within lead of 5kms including the cost of transportation , lead , lift, labour, tools, plant, equipment etc. complete. |
| 3 | Providing and fixing 30cm length, 16mm dia reinforcement by drilling the holes about depth of 15cm of dia 16mm in concrete at center to center distance of 2m for making bonding between old and new structure as per the standard specifications andinstruction of site-In-charge including cost of reinforcement, cutting, fixing etc complete iincluding the cost of materials, labours, transportation, tools, plant, equipment etc. complete. |
| 4 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m iincluding the cost of labours, transportation, tools, plant, equipment etc. complete. |
| 5 | Providing and laying Plain Cement Concrete of Nominal Mix 1:4:8 using 20mm ISS size HBG metal as per relevant specifications, drawings and as directed including cost for mixing, transporting, placing, vibrating, curing, centering & shuttering includinding all labour, material, equipments, tools, plants, fuel, etc. complete |
| 6 | Providing and laying in position cement concrete of mix M- 30 Minimum Cement Content 360 kg/cum (MORT&H 1700-3 A)as per relevant specifications, drawings and as directed including mixing, transporting, placing, vibrating, curing, includinding cost for all labour, material, equipments, tools, plants, fuel, etc. complete excluding the cost of centering, shuttering |
| 7 | Providing pre-cast R.C.C.Post/ Struts for a length of 4.2 m as per the drawing and /or as directed at site withcement concretemix M- 30 Minimum Cement Content 360 kg/cum (MORT&H 1700-3 A)including cost of all labour, concrete, reinforcement, Centering & shuttering, Scaffolding, carrage of RCC Post, finshing with 6mm cement plaster in 1:2 (1 cement : 2 fine sand) curing, transport, tools and plants etc., complete including cost for MS strip of 20mm x 6mm thick provided over the RCC post for holding the chain link fencing as per drawing nincluding cost of labours, materials, tool& plants required to complete the work satisfactorily |
| 8 | Providing and fixing formwork using plywood or steel sheets in Foundations, side wall, slabsetc complete. |
| 9 | Fixing R.C. C. fencingposts/strut upto the hight of 4.2min line as per the drawing including the cost oflabour, tools, plant, equipment etc. complete. |
| 10 | Providing and fixing PVC coated galvanized steel barbed wire weighing 9.38 kgs per 100m (minimum), 2 ply with 4 points at a distance of 75 - 100 mm c/c as specified in the drawing and/ or as directed at site including placing the barbed wire in position including G.I binding wire tied to 6mm bar nibs fixed while casting of the post as specified in the drawing and /or as directed at site including the cost of all materials , transportation , lead , lift, labour, tools, plant, equipment etc. complete. |
| 11 | Providing and Fixing G.I Chain link (G.I wire of dia 4mm, PVC coated to achieve outer dia. not less than 5mm) fabric fencing of required width in mesh size 50x50mm ncluding the cost of all materials , transportation, labour, tools, plant, equipment etc. complete. |
| 12 | White washing with lime with two coatto the existing RCC post ncluding the cost of all materials , transportation, labour, tools, plant, equipment etc. complete. |
| 13 | Panting with with Epoxy paint (two or more coats) at all locations prepared and applied as permanufacturer’s speciications including appropriate priming coat, preparation of surface, etc.complete ncluding the cost of all materials , transportation, abour, tools, plant, equipment etc. complete. |