| 1 | Fencing Work |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width aswell as 10 sqm on plan) including getting out and disposal of excavatedearth lead upto 50 m and for all lift, as directed by Engineer-in-charge. All kinds of soil |
| 3 | Labour for laying 150 mm to 200 mm boulder soling including roughdressing hand packing and ramming down small pieces in the intersticsincluding rolling and preparing the bed to proper level and filling up alljoints with sandy clay or earth. NB. -- This rate only for Northern Circle, NBCC-I & NBCC-II |
| 4 | Providing and laying in position cement concrete of specified gradeexcluding the cost of centering and shuttering - All work up to plinthlevel :1:3:6 (1 Cement : 3 manufactured sand derived from Recycled Concrete Aggregate (RCA) : 6 graded stone aggregate 40 mm nominal size Recycled Aggregate (RA) ) |
| 5 | Providing and laying in position cement concrete of specified gradeexcluding the cost of centering and shuttering - All work up to plinthlevel : 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 6 | Steel reinforcement for R.C.C. work including straightening, cutting,bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D ormore. |
| 7 | M.S. gate of Jail type as per approved design made of strong M.S.frame work, intermediate stiffeners and round / square bars or angles. M.S. sheet (not less than 14 gauge) gussets, cleats etc. including necessary riveting, bolting, welding, locking and hanging arrangements, fitting and fixing complete as per direction of the Engineer-in -charge. In ground floor. (Add extra @ 1% for each addl. floor upto 4th floor and @ 1.25% for each addl. floor above 4th floor) (Portion of locking arrangement inside the wal to be paid separately) |
| 8 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. |
| 9 | Providing and fixing G.I. chain link fabric fencing of required width in mesh size 50x50 mm including strengthening with 2 mm dia wire or nuts,bolts and washers as required complete as per the direction of Engineer-incharge. Made of G.I. wire of dia. 4 mm, PVC coated to achieve outer dia not less than 5 mm in required colour and shade |
| 10 | Supplying, fitting galvanised 3 ply 12 gauge / 4 points line ofbarbed wire in fencing (holes already made in the body of the post)or fixed by staples tightening and fixing the wires in taut conditionwith straining bolts including the cost of cutting and of lappingjoints in the wire as necessary but excluding the cost of galvanisedstaples,straining bolt and binding wire where necessary. |
| 11 | Rubble masonry in cement (1:4) with hard dressed stones from approved quarries and clean, coarse and washed sand including carriage of all materials to site In Road and Jhora Work |
| 12 | Cutting and pruning of trees along the proposed fencing line, including those that pose a risk to the lower-lying areas, while ensuring all necessary safety measures are taken, obtaining required approvals from the relevant statutory authorities, and properly stack of the cut material as instructed by Engineering - in -charge. |
| 13 | Sub Heading 2 |
| 14 | Plain Cement Concrete 1:4:8 (one cement four fine aggregates and eight coarse aggregates) using |
| 15 | Brick work in C.M 1:5 mix using 2nd class ground moulded chamber burnt bricks with including cost |
| 16 | Construction of chamber for 100mm sluices valve |
| 17 | Construction of chamber for 200mm sluices valve |
| 18 | Service Taxes If any |