| 1 | Providing ordinary labours engaged for site clearance, Bush clearance etc. (Page No-91 , Sl.No-1 WRD) |
| 2 | Dismantling plain cement or lime concrete work including stacking serviceable materials in countable stacks within 15M. Lead and disposal of unserviceable materials with all leads all complete as per direction of E/I. 5.10.2 |
| 3 | Earth work in excavation in foundation trenches in ordinary soil ( vide classification of soil item A) and disposal of excavated earth as obtained to a distance upto 50M including all lifts leveling ramming the foundation treanches, removing roots of trees, and shrubs all complete as per approved design, building specification and direction of E/I. 5.1.1 |
| 4 | Extra for earthwork in hard soil as per specification and direction of E/I. ( vide classification of soil item-B) 5.1.2 |
| 5 | Construction of Grannular, sub-base by providing close graded, materials, spreading in uniform layer with motor graded on prepared surface mixing by mix in place method with front end loader at omc and compacting with vibratory roller to achieve the desire density complete as per clause 401. R.C.D {4.01B(i)} |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) (B.C.D 5.3.1.2 |
| 7 | Providing centering and shuttering including struting proping etc. and removal of form for foundation, footings, basages of columns etc. for mass concrete. (5.3.17.1) |
| 8 | Earthwork in filling foundation trenches and plinth back filling of structures in layer not exceeding 150 mm.thick well watered, rammed and fully compacted and finely dressed with suitable earth obtained from excavation of foundation trenches and placed in a suitable profile within a lead of 30 M and lift of 1.5 M complete job, as per specification and direction of E/I. 5.1.8 |
| 9 | Providing coarse clean sand in filling in in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including cost of all materials labour, royalty and taxes all complete as per building specification and direction of E/I (BCD 5.1.10 |
| 10 | Supplying laying boulder in rock toe,heel trenches of the dam as per design, drawing including the cost of materials royalty and all taxex etc.but excluding the cost of carriage all complete as per specification and direction of E/I. Part A 6.4 |
| 11 | Providing randam rubble stone masonry in CM (1:4) in foundation and plinth with hammer dressed stone of less than 0.03 M3 in volume and clean coarse sand of F.M. 2 to 2.5 including cost of screening raking out joints to 20 mm depth, curing taxes and royalty all complete as per building specification and direction of E/I.. (B.C.D. - 5.2.28) |
| 12 | Providing randam rubble stone masonry in CM (1:4) in superstructureincluding cost of screening of materials scaffolding raking out joints to 20 mm depth, curing taxes and royalty all complete as per building specification and direction of E/I. 5.2.31 |
| 13 | Providing weephole with dry graded stone filter 20 mm to 40 mm in abutment and wing wall as per specification and direction E/I. (6.9 Part - A) |
| 14 | Providing 25mm thick cement plaster (1:4) with clean coarse sand of F.M. 1.5 including screening, curing with all leads and lifts of water, scaffolding taxes and royalty all complete as per building specification and direction of E/I.5.7.12 |
| 15 | Providing 12mm cement plaster (1:4) with clean coarse sand of F.M. 1.5 including screening, curing with all leads and lifts of water, scaffolding taxes and royalty all complete as per building specification and direction of E/I.(5.7.2 BCD) |
| 16 | Providing 1.5mm cement punning including curing, carriage of water with all leads and lift as per building specification and direction of E/I.(5.7.11BCD) |
| 17 | (a) Cement (14p+1k) km |
| 18 | (b) Sand (14p+1k) km |
| 19 | (c) Stone Chips (24p+1k) km |
| 20 | (d) Stone Metal (24p+1k) km |
| 21 | (e) Stone Dust (24p+1k) km |
| 22 | (f) Boulder lead (24p+1k) |
| 23 | GST - 18% |
| 24 | Labour cess -1% Please Enable Macros to View BoQ information |