| 1 | Earth work excavation in foundation of masonry work in all type of soil including all lead and lift with disposal of earth including cost of all material labour and T& P etc. |
| 2 | Supply & fixing caution sign board ISA40x40x05mm size 1.20x2.10m. and 1.50mm thick M.S. plate, painting caution letter, including cost of all material, labour, T & P etc. complete work. |
| 3 | Earth work in making bypass channel Section & strengthning including all lead & lift; all cost of labour, T & P with manual compaction required for proper completion of work. |
| 4 | Laying C.C. M-10 (1:3:6) mix. in foundation with Kabrai crused grit 4.75 to 40 mm size & coarse sand of F.M. not less than 2.0, including cost of all material, labour, T & P etc.required for proper completion of work. |
| 5 | Supply & laying & fixing in position and alignment of 1200 m m dia Np-3 hume pipe, as per direction engineer-in-charge; including cost of all material, labour, T & P etc, required for proper completion of work. |
| 6 | First class brick work in 1:4 C:M with coarse sand, of F.M. not less than 2.0 including all cost of material, labour, T & P etc. required for proper complete work. |
| 7 | First class brick work in 1:3 C:M with coarse sand of F.M. not less then 2.0, including cost of all material, labour, T & P etc. required for proper completion of work. |
| 8 | Earth work in back filling in foundation up to ground level in all type of soil, including all lead & lift, all cost of material, labour, T & P etc. complete with manual compaction of work. |
| 9 | Laying C.C. M-15 (1:2:4) mix with Kabrai crushed stone grit graded 4.75 to 20mm size with coarse sand of F.M. not less then 2.0, in collar joint including all cost of material, labour T & P etc. required for proper completion of work. |
| 10 | Deep struck pointing in 1:2 C:M with coarse sand F.M. not less than 2.0, including all cost of material, labour, T & P etc. required for proper completion of work. |
| 11 | Earth work for removing of bypass channel channel; including all lead & lift; all cost of labour, T & P with manual compaction and dressing for proper completion of work. |
| 12 | Dewatering with all cost of power & P.O.L . machine, pump, well point systm and operator etc with assembling and dismentling of machine etc. required for proper completion of work. Please Enable Macros to View BoQ information |