| 1 | NAGAR PANCHAYAT DHARMSINGHWA WARD N0 12 ME ASHRFINATH CHAUDHARY KE DUKAN SE RAJENDRA CHAUDHARY KE GHAR AND BELAS PRAJAPATI KE DUKAN HOTE HUYE PULIYA TAK RCC NALA AND SLAIB NIRMAN KARY. |
| 2 | Site Clearence,Cleaning Of Plac to be constructed, which is compleately encorched both permanentely and temporarily.Which laboures demolishing the encroched devries out of the limit of nagar panchayat at with tractor trally including all complete at site. |
| 3 | Excvation of fouandation in ordainary soil in making trenches to widening the existing road in 7.00 mtr width in proper alingments including lift up to 1.50 mtr and lead up to 30.00 mtr and including filling watering and ramming, excavated earth into trenches or in the side of embankment and removal & disposal of surplus earth as directed by incharge up to adistance of 30.00 mtr from the trenches in widening portion. |
| 4 | Disposal of Excavated Earth up to 8 km |
| 5 | Sand Filling in plingth including supply of necessary quantity of sand from a distance not exceeding 10km from the site of the work including watering remaining draceing etc. (Rate include cost of metrial labour and T&P etc compleate as per SI No. 255) |
| 6 | Providing and laying in cement concrete 8:4:1 with 8 stone ballast 40mm guage Nominal size : 4 approved coarse sand :1 cement in footing including of all matarials , labour and T&P etc. required for proper completion of the work as per S.I. No. 281 |
| 7 | RCC works with cement, approved coarse sand and 20 mm gauge approved stone ballast in the proportion 1:1.5:3 in Drain slab excluding the supply of reinforcement and its bending but including its bending supply of all other matarials ,labour T&P etc. as per S.I. No. 284A. |
| 8 | Mild steel or iron in plain work such as reinforcement concrete brick work to required shape as necessary including bending for completion of work and including supply of Tor steel its wastage bend hooks and authorized overlapping shl be measured upto floor two level as per S.I. No. 504 |
| 9 | Provison of blocking the road from the start of construction work side till its completion including all complete at site. |
| 10 | Provision of saftey kits for workers working in construction work and equipment used shovel, gaita, Belcha, Basket in construction work including all complete at site |
| 11 | Provision of diversion of domestic water of the residential houses of the road from the start of construction till its completion including all complete at site. |
| 12 | Supply and Fixing of granite Inogration Stone and sign board . |
| 13 | Laying and Jointing PVC Pipe. Heading |
| 14 | Plain Cement Concrete 1:4:8 (one cement four fine aggregates and eight coarse aggregates) using |
| 15 | Brick work in C.M 1:5 mix using 2nd class ground moulded chamber burnt bricks with including cost |
| 16 | Construction of chamber for 100mm sluices valve |
| 17 | The Total value of Schedule1 |
| 18 | The Total value of Schedule4 Please Enable Macros to View BoQ information |