| 1 | NAGAR PANCHAYAT DHARMSINGHWA KE WARD N0 6 RAJUR ME PRATHMIK VIDYALAY SE RAMESH DUBE KE GHAR HOTE HUYE VIJAY PRAKASH KE GHAR SE RADHESHYAM KE JAMIN HOTE HUYE NAV NIRMIT GAUSHALA MARG PAR CC ROAD NIRMAN KARY. |
| 2 | Excavation of Foundation in ordinary soil including lift up to 1.50 meter and lead up to 30 m including filling, watering and ramming of excavated earth into the trench or into the plinth and removal and disposal of surplus earth as directed by E/I as per SI No-251. |
| 3 | P.C.C.in 1:4:8 cement fine sand with 40mm gauge Stone ballast. |
| 4 | M150 Sub class A brick work in 1:4 cement and sand mortar in Brick Work including supply of all material, labour T&P etc required for completion of the work as per SI No. 305 |
| 5 | 12 mm thick Plaster with cement mortar in proportion of 1:4 cement and sand of 1.25 FM over brick work minimum thickness not be less than 10 mm i/c supply of all materials, labour and T&P etc required for completion of the work. as per SI No. 584 |
| 6 | Earth work cutting/Filling in road embankment or in ordinary soil with cartege i/c all etc. |
| 7 | Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per clause 401. |
| 8 | Providing, laying, WBM Grade-3 with 22.4-53mm size Stone Ballast, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled static roller and fill up the interstices of coarse aggregate, watering and compacting to the required dencity G-3 as per TSC 405.3 |
| 9 | S/Laying of 125 micron polytheen seat under the concrete slab for CC Road. |
| 10 | Laying C.C. Road slab consisting of 1:1½:3 cement, coarse sand & approved 20mm. Gauge stone ballast, over prepared sub grade after its rectifications & bringing it to proper camber & including supply of all materials, labour and T & P etc. required for proper completion of work, finished to required templete as directed by Engineer-In-Charge but excluding cost of required for rectification of the sub grade. |
| 11 | Add for Testing Cost all Complete. |
| 12 | Sopply and Fixing of granite Inogration Stone and sign board . |
| 13 | Construction of chamber for 100mm sluices valve |
| 14 | The Total value of Schedule1 |
| 15 | The Total value of Schedule4 Please Enable Macros to View BoQ information |