|
| 1 | Road Work |
| 2 | Cleaning of draina & road up to silt at site with disposal of 60mtr. including waste making diversion etc...all comp. |
| 3 | Dismentaling of old damaged Imterlocking tiles and stacking of dismantledbricks at site required for proper completion of the work as per directed by engineer incharge within distance of 60mtr etc.... all comp. (Non |
| 4 | Dismantling of old damaged B/W including stacking of serviceable material. and disposal of unserviceable material with in lead of 60 meaters. As per direction of Engineer-In-Charge.....all comp. As Per S.I No-692 |
| 5 | Earth work in excavation in foundation in ordinary soil i/c lift 1.50 & lead 30 mtr without royality etc.... All comp. As Per S.I No-251 |
| 6 | Earth in cutting or embankment in ordinary soil excavation to done from regular pits with cortage 5 km, distance without royality etc.... all comp. As Per S.I |
| 7 | P/L cement concreate with 1:6:12 (1) cement, 6 fine sand, 12 brick ballast 40mm nominal size etc......all comp. As Per SI No-774 |
| 8 | s-150 brick work with 1:4 cement & coarse sand mortar etc....all comp. As Per S.1 No-305 |
| 9 | 12mm thick Plaster with cement & C-sand mortor in 1:5 Including supply of all material labour etc....all comp. As Per 5.1 No-584(1) |
| 10 | Supply, Laying & consolidation of 22.4-53mm gauge stone ballast and screening material by hand rammer...ail comp. |
| 11 | Supply and providing of 125 micron plastic sheet etc.....all comp. As Per S.1 No-19 Taken qtty item No-02-(A) |
| 12 | P/L in cement concrete 4:2:1 with 20mm stone aggregate coarse sand and cement etc.....all comp. As Per 5.1 No-279(1) |
| 13 | Making contraction/construction joint in C.C. with cutter & filling joint with Bitumen mixed in 1/3 depth of cc slab & making 10mm wide joint will be 10-12mm depth including cost of all material, labour, T&P etc. required for proper completion of work. (Rate C/C3.00 Mtr. |
| 14 | RCC. Work with cement approved coarse sand and 2cm.(3/4\") gauge approved stone ballast in proportion of 1:16:3 for slab works etc all comp. As |
| 15 | M.S. or iron in plain work such as R.C.C. /c bending for proper shape and i/c supply of steel & its wastage, bend, nooks, and authorized overlapping shall be measured and i/c cost of binding wire etc.....all comn. As Per S.I No-504. |
| 16 | S/F of granite stone indication board in brick masonary padastal etc....all work comp. As Per Direction Of E/I/C |
| 17 | Deduct cost of old bricks obtained from dismentling.....All comp.Taken qtty item No-03 |
| 18 | Deduct cost of old brick/bats obtained from dismenteling.....All comp.Taken qtty item No-03 Please Enable Macros to View BoQ information |