| 1 | Dismentling fo following type road and stacking of useful materials etc. complete. Interlocking Road |
| 2 | Excavation for pipe line in soil mixed with moorum/shingle/kankar with lift up to 1.5 meter and lead up to 50 meter and including refilling , watering and ramming of excavated in to trenches and removal and disposal of surplus earth within 50 meters. |
| 3 | HDPE Pipes(GRADE-PE-100) PN-10 90mm dia |
| 4 | Supply of specials for above HDPE Pipe |
| 5 | HDPE Pipes(GRADE-PE-100) PN-10 90mm dia |
| 6 | HDPE Pipes(GRADE-PE-100) PN-10 90mm dia |
| 7 | C.I.D/P Sluice Valve 90mm dia |
| 8 | Supply of all type materials and consturct following chamber as per type design with supply of all labour, T & P etc. complete. |
| 9 | Supply of all materials, labour, T & P etc. required and construct single tap pillar type stand post as per type design. |
| 10 | Sand bedding - in trenches in layers not exceeding 10cm in depth, consolidating each deposited layer by ramming and watering complete as per instruction of engineer. |
| 11 | design and construct of brick masonary chamber with m-150 brick work in 1:4 cement coarse sand and then 12mm thick plaster in 1:4 with cement coarse sand and then heavy duty redimade RCC chamber cover and supply of all materials, laubor T&P etc. required for proper comption of work as per specificaitons for RCC work as per instruction of engineer -in-charge. |
| 12 | Providing and laying granular sub-base (GSB) including all complete. |
| 13 | Relaying of 80mm thick paved old interlocking blocks over 50mm local of road including all complete. |
| 14 | Provinding and laying new 80mm thick paved Interlocking blocks over 50mm local sand of road including all complete. |
| 15 | Provinding and laying new 80mm thick paved Interlocking blocks over 50mm local sand of road including all complete. |
| 16 | Provision for crossings of nalas & culvert including sifting of telephone cables etc. Along the alignment fo pipline including supply of D.I. tyton pipe and specials etc. complete. (3.5 M. Wide Road) |
| 17 | Provision for Barrication with Bamboo & Ballies with red flags including all complete. |
| 18 | Supply of all materials,labour, T & P etc complete and making of house connection to consumers including cast of saddle brass ferrule gate wall etc. |
| 19 | Excavating,supplying , stacking, and filling of local earth by mechanical transport upto a lead of 5km also including ramming and watering of earth in layers etc all work all complete.DSR-2.25a |
| 20 | Inter connection newly laid pipe line wih old existing running pipe line of different types and dia including excavation, dewatering from trenches, barricating arrangement and traffic control etc. all complete. Please Enable Macros to View BoQ information |