|
| 1 | dk;ZA |
| 2 | Safe carriage of the following material from Store Centre to work site including loading and unloading at both ends as per RESPO norms (in juridiction of circle) Distance 0 to 60 km :- 13 Mtr. Long ST Poles. |
| 3 | 11 Mtr. PCC/ST Poles. |
| 4 | 09 Mtr. PCC Poles. |
| 5 | 8.5 Mtr. Long PCC Poles. |
| 6 | ACSR Weasel Conductor. |
| 7 | ACSR Rabbit Conductor. |
| 8 | ACSR Dog Conductor. |
| 9 | LT AB Cable (1×25+1×16)sq.mm |
| 10 | LT AB Cable (3×50+1×35+1×16)s sq.mm |
| 11 | LT AB Cable (3×95+1×70+1×16) sq.mm |
| 12 | LT AB Cable (3×120+1×95+1×16) sq.mm |
| 13 | T/F 11/2.5 kV, 10 kVA Single Phase |
| 14 | T/F 11/0.4 kV, 16 kVA |
| 15 | T/F 11/0.4 kV, 25 kVA |
| 16 | T/F 11/0.4 kV, 63 kVA |
| 17 | T/F 11/0.4 kV, 100 kVA |
| 18 | T/F 11/0.4 kV, 250 kVA |
| 19 | LT XLPE Cable/PVC cable of various size. |
| 20 | 11 KV XLPE Cable AL. 3x70 sq.mm |
| 21 | 11 KV XLPE Cable AL. 3x120 sq.mm |
| 22 | 11 KV XLPE Cable AL. 3x185 sq.mm |
| 23 | 11 KV XLPE Cable AL. 3x300 sq.mm |
| 24 | 33 KV XLPE Cable AL. 3x120 sq.mm |
| 25 | 33 KV XLPE Cable AL. 3x300 sq.mm |
| 26 | 33 KV XLPE Cable AL. 3x400 sq.mm |
| 27 | 33/11 K.V Line material such as Cross-Arms, Polymeric Pin Insulators with pin, Guarding Angles, Guarding Wire, Disc Insulators with fittings, stay set, G.I wire, Earthing rod, Fuse set, M.s angle, M.s channel, jointing sleave for various type conductor etc. |
| 28 | 1-ϕ & 3 ϕ distribution box |
| 29 | Various Type Cable Jointing Kits (Indoor &outdoor ), straight through for 11/33 KV. |
| 30 | 11 KV Pilfer Resistant Metering Cubicle |
| 31 | 11 KV CT/PT Metering Pole Mounted Unit |
| 32 | 11 KV VCB I/C and O/G unit. |
| 33 | Dismantling/removing of the line by contractor and Safe carriage of the material from work Site to store including loading and unloading at both ends as per RESPO norms :-AB cable from line, making bundle and stacking at a safe place, |
| 34 | XLPE cable from line, making bundle and stacking at a safe place, |
| 35 | ACSR conductor from all phases on line, making bundle and stacking at a safe place, |
| 36 | ST Poles/Rail pole/gater pole |
| 37 | PCC Poles with all accecories. |
| 38 | M.S Scrape and other line item |
| 39 | 11 KV CT/PT Unit |
| 40 | 11 KV Metering cubical |
| 41 | Old and used TF 10/25/63/100 KVA |
| 42 | Old and used TF 250 |
| 43 | Construction of 33 KV/ 11 KV / LT Over head / Underground Line as per RESPO norms :-Sagging ACSR Weasel Conductor. |
| 44 | Sagging ACSR Rabbit Conductor. |
| 45 | Sagging ACSR Dog Conductor. |
| 46 | Sagging LT AB Cable (1×25+1×16)sq.mm |
| 47 | Sagging LT AB Cable (3×50+1×35+1×16)s sq.mm |
| 48 | Sagging LT AB Cable (3×95+1×70+1×16) sq.mm |
| 49 | Sagging LT AB Cable (3×120+1×95+1×16) sq.mm |
| 50 | Digging of cable trench in size of 0.45Mtr. x1.05 Mtr. and Laying cable in trench and Providing 150 mm. sand cushion beneath and 150 mm. above the cable. The cable shall be duly protected by 1st Class Bricks, two on either side and third on top of the cable, laid in the series one after the other and:-11 KV XLPE Cable AL. 3x70 sq.mm |
| 51 | 11 KV XLPE Cable AL. 3x120 sq.mm |
| 52 | 11 KV XLPE Cable AL. 3x185 sq.mm |
| 53 | 11 KV XLPE Cable AL. 3x300 sq.mm |
| 54 | 33 KV XLPE Cable AL. 3x120 sq.mm |
| 55 | 33 KV XLPE Cable AL. 3x300 sq.mm |
| 56 | 33 KV XLPE Cable AL. 3x400 sq.mm |
| 57 | Cable laying by Digging and drilling of Various type 33KV /11 KV and LT XLPE cable trench less (HDD Method) |
| 58 | Cable laying by sand and bricks of Various type 33KV /11 KV XLPE cable. |
| 59 | G.I. Pipe 6” dia for inserting 33/11 KV XLPE cable for safety of cable on Single/Double Pole by providing and fixing of MS Clamp, Nuts and Bolts. |
| 60 | Fitting of 11 KV Pilfer proof metering cubical including making proper connections. |
| 61 | Guarding of 33/11 KV Line with G.I. wire. |
| 62 | Fixing of 11 KV Fuse Set . |
| 63 | Mounting and fixing of 11 KV CT/PT Unit on double pole including making proper connections. |
| 64 | Mounting and fixing of 10/16 KVA transformer on pole and making proper connections. |
| 65 | Mounting and fixing of 25/63/100 KVA transformer on double pole and making proper connections HT/ LT side. |
| 66 | Making 2x2x1.5 mtr size Plinth for 250 KVA transformer with 1 class brick and with all material and civil work as per respo norms. |
| 67 | Installation of 250 KVA transformer on plinth including making proper connections HT/ LT side. |
| 68 | Making MS strip (50x6 mm) Fancing (6 feet height including civil work) for humanand equipment safty.] |
| 69 | Water level earthing of 250 KVA transformer for its safty with all accessories. (Earthing material should be provided by contractor) |
| 70 | Henly Type Tailless unit protection cubical panel 500A, 650V for 160/250 KVA Transformer. (Tail less unit should be provided by contractor) |
| 71 | Fixing of LT Fuse Set/Box with fuse wire and fixing of MS Clamp, Nuts and Bolts and making proper connections with all accessories. |
| 72 | Applying Aluminum/Red oxide Paint on ST Pole for protection from corrosion. |
| 73 | Mounting and fixing 11 K.V Stay Set |
| 74 | Mounting and fixing 33 K.V Stay Set |
| 75 | Mounting and fixing 11 K.V Pin/Disk insulator. |
| 76 | Mounting and fixing 33 K.V Pin/Disk insulator. |
| 77 | Fixing of Danger board and number plate with clamp . |
| 78 | Wraping of Barbed wire on Pole. |
| 79 | Fixing of 1-ϕ & 3 ϕ distribution box with making proper connection |
| 80 | For 33/11 KV/LT Line, Excavation of foundation pit in size of 75x45 cm. having depth of 1/6th of the full length of the support (pole), providing and laying of stone pad (300x300x75mm.) in the bottom of the pit. (For PCC Pole) Erection of single pole support complete with fixing of 11 KV V-Type cross-arms, and all other accessories by providing stone pad, holding clamps, f-bracket and nuts & bolts with proper earting using Earthing Rod etc. Single support 8.5 Mtr. long PCC Poles :- |
| 81 | 9 Mtr. long PCC Poles :- |
| 82 | 11 Mtr. long PCC Poles :- |
| 83 | 09 Mtr. long ST Poles :- |
| 84 | 11 Mtr. long ST Poles :- |
| 85 | 13 Mtr. long ST Poles :- |
| 86 | For 33/11 KV/LT Line, Excavation of foundation pit in size of 75x45 cm. having depth of 1/6th of the full length of the support (pole), providing and laying of stone pad (300x300x75mm.) in the bottom of the pit. (For PCC Pole) Erection of single pole support complete with fixing of 11 KV V-Type cross-arms, and all other accessories by providing stone pad, holding clamps, f-bracket and nuts & bolts with proper earting using Earthing Rod etc. Double/section Pole structure with 8.5 Mtr. long PCC Poles :- |
| 87 | 9 Mtr. long PCC Poles :- |
| 88 | 11 Mtr. long PCC Poles :- |
| 89 | 09 Mtr. long ST Poles :- |
| 90 | 11 Mtr. long ST Poles :- |
| 91 | 13 Mtr. long ST Poles :- |
| 92 | For 33/11 KV/LT Line, Excavation of foundation pit in size of 75x45 cm. having depth of 1/6th of the full length of the support (pole), providing and laying of stone pad (300x300x75mm.) in the bottom of the pit. (For PCC Pole) Erection of single pole support complete with fixing of 11 KV V-Type cross-arms, and all other accessories by providing stone pad, holding clamps, f-bracket and nuts & bolts with proper earting using Earthing Rod etc.Tri Pole structure with 9 Mtr. long PCC Poles :- |
| 93 | 11 Mtr. long PCC Poles :- |
| 94 | 09 Mtr. long ST Poles :- |
| 95 | 11 Mtr. long ST Poles :- |
| 96 | 13 Mtr. long ST Poles :- |
| 97 | For 33/11 KV/LT Line, Excavation of foundation pit in size of 75x45 cm. having depth of 1/6th of the full length of the support (pole), providing and laying of stone pad (300x300x75mm.) in the bottom of the pit. (For PCC Pole) Erection of single pole support complete with fixing of 11 KV V-Type cross-arms, and all other accessories by providing stone pad, holding clamps, f-bracket and nuts & bolts with proper earting using Earthing Rod etc. Four Pole structure with 9 Mtr. long PCC Poles :- :- |
| 98 | 11 Mtr. long PCC Poles :- |
| 99 | 09 Mtr. long ST Poles :- |
| 100 | 11 Mtr. long ST Poles :- |
| 101 | 13 Mtr. long ST Poles :- |
| 102 | Installation of VCB in control room & making proper connection. |
| 103 | Grouting of stay rods (20x1800mm.) including all works of excavation, cement concrete in size of (0.60x0.60x0.30)M in the ratio of 1:4:6 (cement, sand and 40 mm. brick ballast) including back filling of soil and proper ramming etc. |
| 104 | Tree cutting compensation. |
| 105 | Filling of various type 33/11 kv cable jointing kit. |
| 106 | Matarials to be provided by contractor of 11 KV Underground/ Over head Line as per RESPO norms :-Stone Pad 300x300x75 mm |
| 107 | Cross Arm holding Clamps with bolts & nuts |
| 108 | 1-ϕ & 3 ϕ Distribution Box clamp |
| 109 | Holding clamps for top channel TPMO & fuse set etc. with bolts & nuts |
| 110 | Al. PG clamps Weasel to Weasel |
| 111 | Al. PG clamps Rabbit to Rabbit |
| 112 | Al. PG clamps Dog to Dog |
| 113 | Suspension Clamp |
| 114 | Dead-End Clamp |
| 115 | Eye-Hook |
| 116 | J-Hook |
| 117 | Copper L-Piece 50x225x10 mm |
| 118 | Copper L-Piece 62x225x12 mm |
| 119 | F-bracket for 11 kV line |
| 120 | F-bracket for 33 kV line |
| 121 | E Bracket with bolts & nuts |
| 122 | Barbed wire GI |
| 123 | LT PVC Cable 3.5x70/35 sq mm |
| 124 | LT PVC Cable 3.5x150/70 sq mm |
| 125 | 33 kV Post Insulator |
| 126 | 100 mm Dia, 1 Mtr. Long RCC half-round muff for Cables |
| 127 | Al. long leg Barrel, off-size |
| 128 | Danger Board with clamps |
| 129 | Number Plate with clamps |
| 130 | Aluminium Paint |
| 131 | Red oxide paint |
| 132 | Henly Type Tailless unit protection cubical panel 500A, 650V for 250 KVA and 400 KVA Transformer. |
| 133 | LT Fuse set with all accecesories |
| 134 | Piercing connector |
| 135 | Double pole clamp |
| 136 | Stay rod clamp |
| 137 | Stay insulator |
| 138 | Guarding clamp |
| 139 | Nut and bolts Please Enable Macros to View BoQ information |