| 1 | Nirman karya |
| 2 | Earth work excavation in foundation in ordinary soil including lift UP to 1.5m and lead 30mm with filling watering and raining of excavation of earth as per S.I. No-251 |
| 3 | Providing and laying of cement concrete 1:6:12 ( 1 cement: 6 fine sand : 12 grade brick aggregate 40mm nominal side) including supply of material labor and T&P etc. Required for proper completion of the work and curing complete also including cost of form work in foundation and floor. CHAPTER NO. 6 SR. NO. 1 SCH P.W.D. 273 |
| 4 | M-150 First claas B/W in 1:4 (1 cement ,4 c/sand ) mortar.(S.I.No. 305 b ) |
| 5 | 12 mm thick plaster in 1:3 cement & coar sand mortar etc(SI NO 583) |
| 6 | 2.50 cm. (1\") thick damp proof coarse with cement concrete consisiting of one part cement 1.5 parts approved coarse sand and 3parts approved 13mm. (1.5\") graded stone grit and including water proofing materials as ordered by the engineer-in- charge in the proportion as specified by the manufacturers. AS per SOR ITEM NO. 361 |
| 7 | Concrete with 40mm gauge stone ballest, cement and sand in foundation in the proportion of 8:4:1 including supply of all material, labour,tools &plant as per S.I No-281 |
| 8 | R.C.C work in 1:2:4 cement, c/sand & 20mm gauge sone grit IN SLAB etc as per S.I. No-284A |
| 9 | Mild steel or iron in plain work such as reinforced concrete or reinforced brick work etc SI No-504 |
| 10 | E/W cutting/filling in ordinary soil in cartage in 5km all complete work etc. |
| 11 | Construction of granular sub-base by providing well graded materials, spreading in uniform layer with motor grader on prepared surface ,mixing by mix in place method with rotavator at OMC , and compacting with smooth wheel roller to achieve the desired density , complete as per technical specification clause 401. |
| 12 | Providing /laying (WBM grading 3rd) spreading and compacting stone aggreagated of 53-22.4mm size to water bound macadam specification including spreading in inform thickness hand packing rolling with smooth wheel rooler 80-100kn In stage to proper grade and camber applying the brooming stone screening to fill up the interstices of cease aggregate watering and compacting to the required density.(as per specification on attached analysis of rate by PWD) S.no. 4.7 clause 405 Chapter no.4 |
| 13 | Supplying and laying of 80mm thick rubber molded zig-zag interlocking tiles joint fillup sand as proper camber all complete etc. CHAPTER NO. 20 SR. NO. 8 SCH. P.W.D. 6.7 |
| 14 | R.C.C work with cement approved course sand 2cm (3/4\") gauge approved stone ballast in the proportion of 1:2:4 in lintel of door and windows excluding supply of reinforcement and its bending but including its fixing anf bending wire and including necessary centering and shuttering etc S.I. No. 283 |
| 15 | mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not included in an over all rates ) wrought to required shape as necessary including bending for proper completion of the work and including supply of all steel and wastages and over lapping and hookse . (S.I. No. 504) |
| 16 | Supply and fixing of 350 mm dia NP-3 hume pipe including cost of material loading unloading cartage up to site, all taxes etc. complete. |
| 17 | Cleaning at site all complete work etc. |
| 18 | S/F of display board. |
| 19 | ADD GST 18% Please Enable Macros to View BoQ information |