Erection of steel tubular pipe scaffolding with platform for man movement on different elevations at various plant area, including supply of materials for scaffolding, platform and tool & tackles, labour and supervisor on M3 basis and dismantling the same as per scope of work and instruction of Engineer-in-Charge.
2
Erection of steel tubular pipe scaffolding with platform for man movement on different elevations at various plant area, including supply of materials for scaffolding, platform and tool & tackles, labour and supervisor on M2 basis and dismantling the same as per scope of work and instruction of Engineer-in-Charge
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.