|
| 1 | M&L for repair, maintenance, & servicing of DG Set of capacity 30 KVA to 125 KVA including opening,checking, cleaning, unseviceable / repairable parts from the engine with due care, and supply / fixing of the following new and original spare parts including carrying out all related minor and periodical maintenance and servicing works as and when required suitable for DG Set .Cumins / KirloskarEngine installed at various E/M installation, complete all as specified and as directed by Engineer- in- charge. Note : (1) Required spare part for replacement will be measured and paid under relivanttem as \"Supply only\" (2) Cost of labourfor replacement of spare parts are deemd to be includedwith quoted rate under this item. |
| 2 | Supply only Lubricant oil filter element. as per existing make and model, complete all as specified and as directed by Engineer- in- charge. |
| 3 | Supply only Pre Filter element, complete all as specified and as directed by Engineer- in- charge. |
| 4 | Supply only fuelFilter Element, complete all as specified and as directed by Engineer- in- charge. |
| 5 | Supply only Air cleaner element inner & outer, complete all as specified and as directed by Engineer- in- charge. |
| 6 | Supply only fuel pipe PVC of size 1/4\", complete all as specified and as directed by Engineer- in- charge. |
| 7 | Supply only hose coolant lower with clamp, complete all as specified and as directed by Engineer- in- charge. |
| 8 | Supply only hose coolant upper with clamp, complete all as specified and as directed by Engineer- in- charge. |
| 9 | Supply only fan belt as per existing size, complete all as specified and as directed by Engineer- in- charge. |
| 10 | Supply onlyshut off solonoid valve switch 12/24 V, complete all as specified and as directed by Engineer- in- charge. |
| 11 | Supply only fuel tankguage, complete all as specified and as directed by Engineer- in- charge. (Note for item No. 2 to 11:- Materials of item No. 2 to 11 to be incorporated in item No. 1 here-in-before) |
| 12 | S& F in replacement of silencer mufflers with compact metal wool or sintered bronze powder of capacity 62.5 KVA DG Set including connection, complete all as specified and as directed by Engineer- in- charge. |
| 13 | M & L for draining out old coolant from radiator completely & changing with new coolant as per required capacity, complete all as specified and as directed by Engineer- in- charge. |
| 14 | M & L for draining out old Lub oilfrom the Enginecompletely and changing with new Lub oil (15 W 40) as per required capacity, complete all as specified and as directed by Engineer- in- charge. |
| 15 | Taking down of unserviceable Radiator from the 30 to 62.5 KVA DG Set including connected hose pipe etc and cleaning thoroughly all the tubes and fins etc and carrying out copper brazzing to the leakage of the cooling tubes and refixing of the repaired Radiator to its existing position, complete all as specified and as directed by Engineer- in- charge. |
| 16 | M & L for taking out of unservicable self starter 12 volt and connected unserviceable portion of electric wiring and carring out repairs and overhauling of the self starter for 30 KVA to 62.5 KVAengine and replacement of armature, carbon brush, bearing, bendix penion,solenoid switch, bearing, tapping of field coil refixing of all component and fixed in existing postion including testing, complete all as specified and as directed by Engineer- in- charge. |
| 17 | Dismantling of FIP, injector nozzles includings connected accessories from 30 to 125KVA capacity of DG set makeCumins/Kirloskar DG sets and M/L for carrying out cleaning, calibration and refixing, complete all as specified and as directed by Engineer- in- charge.( Note-During repair/calibration if any Injector nozzle,plunzer ,Delivery valve is found unserviceable the same will be measured and paid seperately , however all the rest items required for making the FIP serviceable shall deem to be included in the quoted rate for overhauling of FIP. Note : (1) Required spare part for replacement will be measured and paid under relivanttem as \"Supply only\" (2) Cost of labourfor replacement of spare parts are deemd to be includedwith quoted rate under this item. |
| 18 | Supply onlyof Injector Nozzle as per existing spares and overhauling, complete all as specified and as directed by Engineer- in- charge. |
| 19 | Supply only of Plungerand overhauling, complete all as specified and as directed by Engineer- in- charge. |
| 20 | Supply onlyofDelivery Valveand overhauling, complete all as specified and as directed by Engineer- in- charge. |
| 21 | Supply onlyof Fuel pumpand overhauling , complete all as specified and as directed by Engineer- in- charge. Note for item No. 18 to 21:- Materials of item No. 18 to 21 to be incorporated in item No. 17 here-in-before) |
| 22 | S&F in replacement Automatic voltage regulator (AVR)for 40-125 KVA DG Set, complete all as specified and as directed by Engineer- in- charge. |
| 23 | S&F in replacement battery terminal cable 16 Sqmm minimum cross sectional area (Red & Black) with one side clamp and other side copper terminal, complete all as specified and as directed by Engineer- in- charge. |
| 24 | M&L for complete checking of AMF panel, finding the fault, servicing complete including replacement of unserviceable spares and testing complete for manual & Auto operations, complete all as specified and as directed by Engineer- in- charge.Note : (1) Required spare part for replacement will be measured and paid under relivanttem as \"Supply only\" (2) Cost of labourfor replacement of spare parts are deemd to be includedwith quoted rate under this item. |
| 25 | Supply only 3- phase control Relay, 380-480 VAC,8 A out current, complete all as specified and as directed by Engineer- in- charge. |
| 26 | Supply only single phase preventor operating voltage 280-520 V AC (L-L), Rating 5A@ 250V AC resistive, complete all as specified and as directed by Engineer- in- charge. |
| 27 | Supply only PLA relay 6-10A, complete all as specified and as directed by Engineer- in- charge.(Note for item No. 25 to 27:- Materials of item No. 25 to 27 to be incorporated in item No. 24 here-in-before) |
| 28 | Supply and fixing of miniature circuit breaker (MCB) of SP 6 to 32 Amp,240V, 10KA \"C\" curve capacity in the MCB DB complete with connection testing and commissioning including taking down old unserviceable one complete all as specified and as directed by Engineer-in-charge. |
| 29 | Supply and fixing of MCCB 3 Pole, 415 V, Adjustable type, 160 Amps with breaking capacity 36 KA including taking down old unserviceable one, complete all as specified and directed by Engineer-in-charge. |
| 30 | M&L for complete Checking and servicing ofDG control panel having function to monitor different working parameters such as ON & OFF switch, Test run switch, Emergency stop switch, lubricant oil pressure & temperature display, generator side important parameter display and other parameters required monitoring for safe running of DG set as, complete all as specified and as directed by Engineer- in- charge. |
| 31 | S&F in replacement PCB board of capacity upto 82.5 KVADG Set , complete all as specified and as directed by Engineer- in- charge. |
| 32 | Attending break down calls during any abnormality found in DG set engine, alternator,self starter, panel/ AMF panel all electrical and mechanical nature complaints, the same will be attend through skilled technician and rectify in short period. The quoted rate are inclusive of all minor parts like insulation tape, screws, nut bolts, fuses, battery terminal grease etc, complete all as specified and as directed by Engineer- in- charge. |
| 33 | M&L for earthing with glavanised steel earth plate electrode of size 600mmX600mmX6mm thick buried directly in ground (earth pit not less than 2.25 m deep below the ground level) with top edge of the plate not less than 1.5m below normal ground level, connected to the galvanised earth lead by means of bolts, nuts, check nutsand washers of galvanisediron or steel using GI strip 25x4mm as earthing lead as shown in electrical plate No.3 of SSR Part-I connected to earthing test point all specified or indicated including testing on completion including necessary excavation and earth work in soft/loose soil, returning filling, disposalof surplus soil, earth pit in PCC (1:3:6) type C-1 using 20mm graded stone aggregate pit, funnel, 20mm dia GI medium grade watering pipe , 32mm dia GI medium grade earth lead protection pipe and pre-cast earth pit cover 50mm thick made of RCC (1:1.5:3) type A-1 duly reinforced with 8mm dia TMT bar @150c/c both ways, one lifting handle made out of 10mm dia TMT bar 250 mm long embedded in cover slab and cover, wire, copper lugs etc mesh, charcoal and common salt in alternate layer of 15 cm thick including taking down old earthing completeall as specified and directed.(Note: Galvanised iron satrip of 25x4mm upto 7.5m long including testingis deemed to be included with quoted rate). |
| 34 | Disconnecting of water connection and dismantling complete solar water heating system of capacity 300 ltrs per day including hot & cold water pipes and hot water tank complete and refixing after repairing the system fixing back in position and testing, complete all as specified and as directed by Engineer- in- charge. |
| 35 | Disconnecting of water connection and dismantling complete solar water heating system of capacity 200 ltrs per day including hot & cold water pipes and hot water tank complete and refixing after repairing the system fixing back in position and testing, complete all as specified and as directed by Engineer- in- charge. |
| 36 | Supply and fixingsolar hot water collectorSS-304 tank of capacity of200 ltrs per day, complete all as specified and as directed by Engineer- in- charge. |
| 37 | Supply and fixingsolar water Collector SS-304 tank of capacity of300 ltrs per day , complete all as specified and as directed by Engineer- in- charge. |
| 38 | Supply and fix as in replacement, solar flat plate made oftoughened glass having thickness 5mm all as per the existing model of system , complete all as specified and as directed by Engineer- in- charge. |
| 39 | Supply and fixin replacement, solar panel gasket made out of fine rubber to make system air tight, dust and water proof incl end plug, dead plug, nut bolt, complete all as specified and as directed by Engineer- in- charge.(8 RM per panel) |
| 40 | Supply and fix as in repair compressed glass wool 48 mm thick between solar energy collector panel copper tubes frame and aluminum body panel including securing it on panel by means of necessary adhesives all as directed all as specified and directed by Engineer-in-charge. |
| 41 | S&F in reapirs of hose pipe for hot/ cold water for solar system of suitable length as existing size complete with 02 Nos clamps, complete all as specified and as directed by Engineer- in- charge. |
| 42 | S&F in reapais of auxillary tank for make up tank to reduse pressure of solar system complete as directed by Engineer-in-charge. |
| 43 | Descaling of hot water storage tank of food grade stainless steel 200 ltr capacity complete all as specified and directed by Engineer-in-charge. |
| 44 | De-scaling of hot water storage tank of food grade stainless steel 300 ltr capacity complete all as specified and directed by Engineer-in-charge. |
| 45 | M&L for insulation of hot water pipe with glass wool and covering with aluminium sheet cladding 25 gauge (0.56mm thick) for 20mm bore GI pipe, complete all as specified and as directed by Engineer- in- charge. |
| 46 | S&F of500 Ltr capacity rotational moulded polyethylene water storage tanks (cylindrical vertical with closed top) multi layer, (three layer)ISI Marked hoisted and fixed in position withcover of tank with its locking arrangement, making hole for inlet, outlet and overflow connection with andincluding 20mm dia ball valve high pressure of PTMT (minimum weight 210 gms)including dismantling / taking down old unserviceable PVC water tank, ball valve etc complete all as specified in SSR Part-Iand directed. |
| 47 | S & F in repairs gunmetal globe or gate valve with iron wheel head, screwed both ends for iron pipes 20mm borecomplete all as specified and as directed by Engineer- in- charge. |
| 48 | S & F in repairs gunmetal globe or gate valve with iron wheel head, screwed both ends for iron pipes 15mm bore complete all as specified and as directed by Engineer- in- charge. |
| 49 | Supply and filling distilled water to solar heater unit for various capacity, complete all as specified and as directed by Engineer- in- charge. |
| 50 | Taking out accumulated mixture of sludge and sludge water from underground raw sump,aeration tank ,settler tank,chlorine contacttank, Treated water tank ,clarifiers (Primary and secondary) of Gwalapatti STP and Khalasipatti & disposal of the same to a distance not exc 250 mtrand spreading leveling etc , complete all as specified and as directed by Engineer- in- charge. (Note : This operation shall be carried out once in every two months ) |
| 51 | Supply only Mild Steel pipe heavy duty (ERW) both end threaded with one socket /flange (with nut & bolt/gaskit) of wall thickness 3.00mm & length 3.00 mtr. 25 mm bore conforming to IS-1239 (Part-I) 1979, and properly painted with one coat of black bituminous of surface internally and externally suitable for the drinking water, complete all as specified and as directed by Engineer- in- charge. |
| 52 | M& L for disconnection of Electrical/Mechanical connection and taking out carefuly of electric motor capacity 3.5- 5HP (3 phase, 415V 50 HZ, AC Supply) of any make and rewinding the same with super enameled copper wire of existing gauge/specification making ofheat varnishing, greasing and two coat spray/ brush painting with synthetic enemel paint of recommended colour including replacement of bearings NDE and DE as per existing specification and size including refixing the motor in position making all electrical and mechanical connections and testing, complete all as specified and as directed by Engineer- in- charge. |
| 53 | M&L for complete servicing in repair of Dewateringpump set capacity1 HP (1 phase, 220/240 V 50 HZ, AC Supply) of any make and size and the cutting/removing burnt out winding and rewinding the motor with as per existing original wire gauge super enameled copper wire including high quality\"F\" class insulating material with heat resistant sleeves, sealing compoundand varnishing and heating the stator upto varnish fully dry and testing the motor at work shopincluding taking out carefuly and refixing the motor in position making all electrical and mechanical connections and testing, complete all as specified and as directed by Engineer- in- charge. |
| 54 | M& L for disconnection of Mechanical connection and taking out carefuly of Air Blower of capacity50 Cum per hourandreplacement of Air Filter ,gear oil, grease, oil seal , bearings NDE and DE as per existing specification and size including refixing the Air blower in position making all mechanical connections and testing, complete all as specified and as directed by Engineer- in- charge. |
| 55 | M&L for cutting the bushes, grass, thorney bushes, small plants/trees up to a height of 5 mtr in and around STP Gwalapatti and Khalasipatti and near by area of pump house of Coochbehar operation shall be carried out once in every three months incl surface dressing and removing the waste material to a distancenot exceeding 50 mtr from the starting point , complete all as specified and as directed by Engineer- in- charge. |
| 56 | M & L for repairing ofmotor controlPanel with dismantling all unserviceable fitting and electric connection and reassembling the same after carry out the following replacement/sparesand painting with two coats of synthetic enamel paint over a coat of primer after prepartion of internal and external surface.Testing on load, complete all as specified and as directed by Engineer- in- charge. {Note : (1) Accessories to be replaced shall be measured and paid separately as mentioned here-after as\"Supply only\"). (2) Cost of labourfor replacement of spare parts are deemd to be includedwith quoted rate under this item.} |
| 57 | Supply only Motor protection circuit breaker with 415 V breaking capacity, Icu 100 KA, 2.2 KW power capaacity, thermal release adjustment range 4 to 6 Amp for motor control Panel , complete all as specified and as directed by Engineer- in- charge. |
| 58 | Supply only Power contactor suitable for operation on 03 Phase, 415 Voltage, Max. opt. current AC3 10/16 Amps for motor control Panel , complete all as specified and as directed by Engineer- in- charge. |
| 59 | Supply only Pump protection relay, 03 Phase 415 Volt, Imin 4, 5, 6, 7, 8, 9 Amp, Imax 6, 8, 9, 10, 13 Amp for motor control Panel , complete all as specified and as directed by Engineer- in- charge. |
| 60 | Supply only RCCB FP 30mA of 40 A for short circuit protection for motor control Panel , complete all as specified and as directed by Engineer- in- charge. |
| 61 | Supply only Single phase preventor, 415 Volts, 4 to 7 sec trip time delay for motor control Panel, complete all as specified and as directed by Engineer- in- charge. |
| 62 | Supply only Volt meter 0-500 Volt square type 96mm x 96mm size with inbuilt selector switch or botton for selection of phases, complete all as specified and as directed by Engineer- in- charge. |
| 63 | Supply only Push button switch for starter ON/OFF for motor control Panel, complete all as specified and as directed by Engineer- in- charge.(Note for item No. 57 to 63:- Materials of item No. 57 to 63 to be incorporated in item No. 56 here-in-before) |
| 64 | Supply &fixing in repairsofflexible hose pipe of bore 40mm made of plastic suitable for removing sludge water as , complete all as specified and as directed by Engineer- in- charge. |
| 65 | Supply and fix in repairs ofbutterfly valve 50 mm dia high pressure with polythene float and fly nut complete screwed for iron pipe of 50 mm bore , complete all as specified and as directed by Engineer- in- charge. |
| 66 | Supply and fixing of GI tubing of 40 mm bore medium grade ISI Marked on wall/ laying on floor/ceiling including with all fittings such as elbow, union, reducer, tees, bends etc and shortlength, including takiong down old unserviceable GI pipe complete all as specified and as directed by Engineer- in- charge. |
| 67 | Supply and fixing of GI tubing of 50 mm bore medium grade ISI Marked on wall/ laying on floor/ceiling including with all fittings such as elbow, union, reducer, tees, bends etc and shortlength, including takiong down old unserviceable GI pipe complete all as specified and as directed by Engineer- in- charge. |
| 68 | Supplying and charging in layers special sand of size 10 to 20 mesh suitable for use in filtration plant of following sizes, complete all as specified and as directed by Engineer- in- charge. |
| 69 | Supplying and charging in layers special Gravels of size 1/16\" to 1/8\" mesh suitable for use in filtration plant of following sizes, complete all as specified and as directed by Engineer- in- charge. |
| 70 | Supplying and charging in layers special Gravels of size 1/8\" to 1/4\" mesh suitable for use in filtration plant of following sizes, complete all as specified and as directed by Engineer- in- charge. |
| 71 | Supplying and charging in layers special Gravels of size 1/4\" to 1/2\" mesh suitable for use in filtration plant of following sizes, complete all as specified and as directed by Engineer- in- charge. |
| 72 | Supplying and charging in layers special Gravels of size 1/2\" to 1\" mesh suitable for use in filtration plant of following sizes, complete all as specified and as directed by Engineer- in- charge. |
| 73 | Supplying and charging in layers special Anthracite coal of size 1/16\" X 1/8\" mesh suitable for use in filtration plant of following sizes, complete all as specified and as directed by Engineer- in- charge. |
| 74 | Supply and fix in repair Addressable manual call point resettable type, complete all as specified and as directed by Engineer- in- charge. |
| 75 | Supply and fix in repair Addressable electronic sounder cum strobe, complete all as specified and as directed by Engineer- in- charge. |
| 76 | Supply and fix in repair fire alarm sounder/ sirens electronic type horizontal single stage continuesly normal operation for atleast 50 min with sound level 65 DB to 120 DB measured at 1.5 mtr with sound output variation of +5 DB 1000 mtr range, complete all as specified and as directed by Engineer- in- charge. |
| 77 | M&L for replacement of fire alarm control panel with two loop card PCB incl battery back of24V (2 Nos of 12v ,7Ah sealed lead acid battery),8 zone , 2×16 character backlit LCD display, 2 wire communication facility via RS 485 port, complete all as specified and as directed by Engineer- in- charge. |
| 78 | supply and fix in replacement sealed lead acid battery 12V,7Ah constant voltage charge with voltage regulation,standby use 13.6 V-13.8V,cycle use 14.1V-14.4V,max initial current 1.4A, complete all as specified and as directed by Engineer- in- charge. |
| 79 | Supply and fix in repair annunciating device short circuit isolater, complete all as specified and as directed by Engineer- in- charge. |
| 80 | Supply and fix of stainless steelfire hydrant valve 63 mm dia, single headed with flanged inlet and instantaneous out let on the existing stand post with brass nipple, including necessary bolts, nuts and washers including taking down unserviceable old one , complete all as specified and as directed by Engineer- in- charge. |
| 81 | Supply and fix of hose reel drum, wall mounted swinging type complete with drum, bracket, globe valve/ stop cock of size 19 mm dia, 30 mtr long high pressure hose reel tubing with branch pipe gun metal shut off nozzle including taking down unserviceable old one , complete all as specified and as directed by Engineer- in- charge. |
| 82 | Supply and fix 15 Metre long rubber lined woven jacketed hose pipe 63 mm dia, type A (Reinforced rubber lined) as per IS 636with necessary instantaneous spring lock type coupling at the ends to match with landing valve/hose pipe/branch pipe with gun metal male and female coupling conforming to IS 903 complete all as specified and directed. |
| 83 | Supply and fix in repairs of 63 mm dia branch pipe S/S instantaneous inlet and made 15 mm bore nozzle short , complete all as specified and as directed by Engineer- in- charge. |
| 84 | Supply and fix, in replacement ofPressure switch Universal type, complete all as specified and as directed by Engineer- in- charge. |
| 85 | Supply and fixing, in replacement of Pressure Gauge, 100mm dia, 0 - 7 Kgs rating , complete all as specified and as directed by Engineer- in- charge. |
| 86 | Material and labour for disconnection of electric connections, from three phase centrifugal fire pump set motor and dismantling the fire pump sets complete from the foundation, strip opening the unserviceable motor at site to locate the fault and transporting to the local work shop. Strip openingthe motor and cutting/removing burnt out winding and rewinding the motor with as per existing original wire gauge super enameled copper wire including high quality\"F\" class insulating material with heat resistant sleeves, sealing compoundand varnishing and heating the stator upto varnish fully dry and testing the motor at work shop , complete all as specified and as directed by Engineer- in- charge. . Coupled the motor with pump and installed at site as per existing position. Testing thepump setafter completion of work all as specified and directedof capacity 7.5 HP. |
| 87 | Disconnecting Suction and delivery pipe lines from unserviceable Electric driven 3 phasecentrifugal pump from its foundationand opening the pump , cleaning , replacing the worn out part like - ball bearing , gun metal bush , pump shaft repair by lath,repairing of impeller by grinding / polishing ,water sealant of any typeand necessary gland packing etc.which ever be requiredto making 100 % serviceable of pump sets coupledwith motor and installed at site of capacity 7.5 HP as per existingincluding testing after, complete all as specified and as directed by Engineer- in- charge. |
| 88 | M&L for Painting to outer side of the existing fire fighting equipments, pipe lines (G+4 building) bytwo coat of synthetic enameled paint of existing colour by using spray gun and compressor after making the surface ready to paint , complete all as specified and as directed by Engineer- in- charge. |
| 89 | Material and labour,for repair / replacement of worn out Gland Packing of pump set / sluice valves / hydrantsany make / metal / sizeincludingwashers of any shape / sizeto avoid water leakage as indicatedincluding taking out old one , complete all as specified and as directed by Engineer- in- charge. |
| 90 | M&L for Cleaning of tank all as specified here in after and as directed of capacity up to 10000 ltrs :-(a) removing mud,silt,sand etc from inside tank(depth exc 1.50 m) and depositing to a distance exc 50M but n.exc 100M away from tank,(b)removing moulds,moss,foreign materials from inside tank(c)cleaning the internal surfaces of tank and washing with clean water and applying one coat of lime wash inside tank.(d) applying two coats of Synthetic enamel paint/Black Bituminous Paint over a coat of primer to all exposed steel surfaces , complete all as specified and as directed by Engineer- in- charge.(Note : Cleaning shall be carried out once in every three months ) |
| 91 | Supply and laying of XLPE insulated, LT armoured electric cable with aluminium stranded conductor 1100 volts grade, cross-sectional area 35 sqmm, 3.5 core laid in wall with necessary cable lugs and glands, nuts, bolts and washers etc and testing including taking down old unserviceable cable completeall as specified and directed. |
| 92 | Supply Installation testing and commissioning of retrofit emission control device for 62.5/82.5 kVA desiel generator ofany make/vintage, complete all as specified and as directed by Engineer- in- charge.CategoryApplication :- Reduce particulate matter (PM 2.5), Carbon Monoxide and Hydrocarbons emitted from Diesel EngineTechnology/Type :- ESP (Electrostatic Precipitator), Wet Scrubbing, Diesel Oxides CatalystGuaranteed specified Particulate matter (PM 2.5) Carbon Monoxide, Hydrocarbon reduction efficiencyGuaranteed specified Particulate matter (PM 2.5) Carbon Monoxide, Hydrocarbon reduction efficiencyRetrofit device is to be installed in place of existing silencer.No soot is to be collected in the retrofit device. The device including enclosure should include an Oxidation chamber and Passive Regeneration Trap. NOTE: It is mandatory to upload the Type approval certificate for suitable KVA RATINGS ( ENGINE FAMILY) with registration number & date (from one of the CPCB recognized approved lab in Cover – 1 bid with application of tender documents. If contractor failed to upload the same in Cover-1, bid will be rejcted in Cover-1 and financial bid not be opened. |
| 93 | contd/-- item no 92.00TEST REPORTSCertification :- Device should be ‘Type Approved’ as per the System and Procedure of Central Pollution Control Board for Emission Compliance Testing of Retro-fit Emission Control Devices (RECD) For Diesel Power Generating Set Engines, Dated 01/02/2022, wide Pollution Control Series PCLS/12/2021-22(a)Automotive Research Association of India (ARAI, Pune)(b)International Centre for Automotive Testing (ICAT, Manesar)(c)Indian Institute of Petroleum (IIP, Dehradun)(d) Vehicle Research Development Establishment (VRDE, Ahmednagar)Back Pressure due to the Emission Control retrofit device :- Maximum back pressure exerted by the Emission Control retrofit device at max prescribed load by DG OEM(as per the capacity of the DG set) should be under limit and display panel to be provided for Back pressure and exhaust temperature limit.Scope of Installation :-a) Installation of Emission Control Retrofit Device when offered by the vendor is inclusive in the scope of supply and shall be done by the seller. b) Construction of suitable earthing station (if applicable) and necessary connections shall be done by the seller.Warranty/Service ;- 12 monthsNumber of preventive maintenance visits offered in a year during warranty period :- 2 visitsDELIVERABLES, TIME SCHEDULESubmission of approach of work/ methodology, Drawings and the details of team as per the scope of work :- 30 daysDelivery Of Device :- 60 daysInstallation, Testing Commissioning at site of retrofit emission control device on existing DG sets :- 90 days Note:- The contract sum shall be calculated by deducting the amount shown in Credit Schedule attached to this tender, from total amount of Schedule \"A\"/BOQ. |