| 1 | Earth work in excavation of the foundation tranches or drains in all sorts of soil (including mixed soil but excluding laterite or sand stone) including removing spreading or stacking the spoils within a lead of 75Mtr as directed. The Item including necessary trimming the sides of tranches, levelling, dressing and ramming the bottom, bailing out water etc. as required complete. Depth of excavation not exceeding 1500 mm |
| 2 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm.including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) With earth obtained from excavation of foundation. |
| 3 | Dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m.a) In ground floor including roof. |
| 4 | Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75m.In ground floor including roof.(a) upto 150 mm. thick |
| 5 | Dismantling R.C. floor, roof, beams etc. including cutting rods and removing rubbish as directed within a lead of 75 m. including stacking of steel bars(a) In ground floor including roof |
| 6 | Dismantling of flexible pavements and disposal of dismantled materials upto a lead of 100 m stacking serviceable and unserviceable materials separately as per technical specification Cl 202 for Rural Roads of MORD (i) by mechanical means (b) Granular Courses |
| 7 | Preparation and consolidation of sub-grade with power road roller of 8 – 12 tonne capacity after cutting exiting road upto required depth, dressing to camber and consolidation with road roller including making good the undulation etc and rerolling the sub-grade and disposal of surplus earth with lead upto 50 meters. |
| 8 | Filling in foundation or plinth by fine sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity) |
| 9 | Construction of Granular Sub Base by providing graded materials , mixing in wet mix plant at OMC , carriage of mixed materials to work site spreading in uniform layers with motor grader on prepared surface in proper grade and camber , compacting with vibratory power roller to cahieve the desired density including lighting , guarding , barricading including cost of all materials , machinery , tools and plants and cost of quality control complete as per Clause 401 of specifications for Road and Bridge works of MORTH ( 5 th revision ) : Grading I |
| 10 | Providing , laying , spreading and compacting graded stone aggregates to wet mix macadam specification including screening of aggregates from granular materials premixing the materials with water at OMC in wet mix plant , carriage of mix materials by tipper to site , laying in uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density including supply of all materials , machinery , fuel and lubricants including incidental cost for lighting , guarding , barricading , making earthen bundh to protect the edges including cost of quality control complete as per clause 406 of specification for Road and Bridge works of MORTH (5th Revision ) |
| 11 | Supplying ready mixed concrete of M 15 Grade with well graded stone chips of 20 mm nominal size containing designed quantity of cement per Cu.m of wet concrete produced in computerised batching plant under controlled condition using approved super plastisizer, designing concrete mix following I.S. 10262 and I.S. 456, transporting the mix with agitation in transit mixer to work site depositing the mix on a platform erected for the purpose at required levels of concreting and then placing the mix in its final location of form work, compacting and curing the same complete as per specification & direction of the Engineer-in-charge including computerised batching plant transit mixer with all accessories vibrators etc.inclusive of all other incidental charges in this connection complete but excluding cost of hire charge of platform and its supporting staging which would be paid through separate item.[cement to be supplied by the Manufacturer/ supplier]In ground floor and foundation. Withoutapproved concrete pump |
| 12 | Supplying ready mixed concrete of M 30 Grade with well graded stone chips of 20 mm nominal size containing designed quantity of cement per Cu.m of wet concrete produced in computerised batching plant under controlled condition using approved super plastisizer, designing concrete mix following I.S. 10262 and I.S. 456, transporting the mix with agitation in transit mixer to work site depositing the mix on a platform erected for the purpose at required levels of concreting and then placing the mix in its final location of form work, compacting and curing the same complete as per specification & direction of the Engineer-in-charge including computerised batching plant transit mixer with all accessories vibrators etc.inclusive of all other incidental charges in this connection complete but excluding cost of hire charge of platform and its supporting staging which would be paid through separate item.[cement to be supplied by the Manufacturer/ supplier]In ground floor and foundation. Withoutapproved concrete pump. |
| 13 | Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing. (As per clause 601 of specifications for Road & Bridge Works of MoRT&H (5th Revision) |
| 14 | Supplying and laying in the specified pattern of Interlocking concrete block pavements (ICBP) with concrete blocks (with concrete grade as specified as per Table 1 of IS 15658:2006) manufactured in steel mould clamped to a vibrating table by hydraulic pressure (As per clause no 6.30 of IRC : Sp: 63 (2018) , from BIS license manufacturer , with spacer nib (small protruding profiles on the vertical face of a paver block used as a device for keeping minimum joint gap in between the paving block as per Cl No 3.26 of IS : 15658) and of specified size and shape with aspect ratio (the ratio of length to thickness of a paver block as per CL No 3.3 of IS : 15658) as per Table 2 of IS15658 with flexural strength / breaking load as per Annexure G of IS15658 on prepared base course of specified CBR as per table 1 of IRC SP 63 (2018) or else as mentioned in design and drawing with a couson of compacted bedding sand of 25-35mm thick (Grading of bedding sand as per clause 6.5.1 of IRC SP-63) and filling up the gaps in between paver block with joint filling sand (the grading of joint filling sand will be as per clause 6.5.2 of IRC SP-63) and completing the edges with cut blocks as per clause no. 8.7 of IRC SP-63 (2018) with proper confinement of bedding and joint filling sand, compaction, leveling and filling up of the edge gap.120 mm thick GreyDentated or dumble shaped |
| 15 | Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints withlocal sand |
| 16 | Providing and laying reinforced cement cocrete pipe NP4 with spigot socket for culverts on first class bedding of granular materialincluding fixing with cement mortar 1:2 as per Technical Specifications Clause 1106 for Rural Roads of MORD. 600 mm dia |
| 17 | Brick work with 1st class bricks in cement mortar (1:6) |
| 18 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/stagingwhere necessary (Ground floor).[Excluding cost of chipping over concrete surface] With 1:6 cement mortar. 20 mm thick plaster |
| 19 | Neat cement punning about 1.5mm thick in wall,dado,window sill,floor etc. NOTE:Cement 0.152 cu.m per100 sq.m. |
| 20 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.TATA/SAIL/RINL |
| 21 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor)(c) Steel shuttering or 9 to 12 mm thick approved quality ply board shuttering in any concrete work |
| 22 | Cutting of branches of trees and shrubs from the road way or with in R.O.W including disposal of wood and leaves to suitable location as per technical specification Clause 1914 for Rural Roads of MORD |
| 23 | Supply earth mover/ exacavator cum loader including fuel, permit, requisite operator, helper etc for 8 hrs. The rate is inclusive of all expenses complete. |
| 24 | M.S. structural works in columns, beams etc. with simple rolled structural members (e.g. joists, angle, channel sections conforming to IS: 226, IS: 808 & SP (6)- 1964 connected to one another with bracket, gussets, cleats as per design, direction of Engineer-in-charge complete including cutting to requisite shape and length, fabrication with necessary bolting, metal arc welding conforming to IS: 816- 1956 & IS: 1995 using electrodes of approved make and brand conforming to IS:814- 1957, haulage, hoisting and erection all complete. The rate includes the cost of rolled steel section, consumables such as electrodes, gas and hire charge of all tools and plants and labour required for the work including all incidental chages such as electricity charges, labour insurance charges etc. \"Payment to be made on the basis of calculated weight of structural members only in finished work as per IS specified weight. Payment for gusset, bracket, cleat, rivets, bolts and nuts may be make by adding the actual weight of such items with the weight of finished structural members or 7% of weight for finishedstructural members weighing not less than 22.5 Kg. / m. or 15 % of weight for finished structal members weighing less than 22.5Kg. / m. may be increased allow for bracket, cleat, rivet, bolts and nuts etc. and no seperate payment being made for these items, as per direction of Engineer In Charge. The rates are considered for a height of erection 8m. / 2nd floor level from theground. Add 1.5% extra over the rate for each additional floor or4m. beyond initiial 8m. or part thereof. For Structural Works in Roof Trusses etc. using joists, channels and angles of specified section weighingless than 22.5 kg/ m |
| 25 | Supplying, fitting and fixing in position reinforced cement polymer concrete manhole /guIIy pit cover with matching frame.As per I.S- 12592(M.D)(i) 35 MT load bearing capacity round manhole cover provided with two lifter hooks fitted with matching frame of size Cover:700mmX100mm Frame:910mm X 185 mm opening: 560mmWeight: 245 kg (approx) |
| 26 | Supply of one 3-5 HP capacity diesel pump set of running condition on hire basis daily from 8 AM to 5PM along with necessary pipes for suction and delivery of length approximate 15 metre and 5 metre respectively and other accessoris and fittings like foor valve, clips etc, including Pump Driver/ Helper required to run the pump set for lifting of waste water from pits manholes, drains etc as per direction of Engineer-in- Charge at site |
| 27 | Provide charges of supplied fuel for running the pump set as per necessity and requirement |