| 1 | Replacement of damaged/dented hull plates in FACT Pearl of Periyar BargeScope of work includes:# Cutting and removing damaged/dented steel plates in hull of FACT Pearl of Periyar Barge.# Fitup & welding of new IRS grade A plates in damaged portions of the hull.#Carrying out NDT tests like dye penetrant test, magnetic particle test, hose test, RT etc.. in steel renewed regions as per the recommendations of IRS.#Painting of two coats of primer in steel renewed regions. Primer to be used shall be epoxy zinc phosphate paintNote: Entire welding works in hull shall be done by IRS qualified welder.Entire work shall be done as per special conditions of contract, general conditions of contract and as per instructions of engineer-in-charge. |
| 2 | Procurement of structural required for repair works of the hull in FACT Pearl of Periyar Barge:Scope of work includes:#Procurement of structural required for the repair works inhull of FACT Pearl of Periyar Barge.# Procured structural shall be confirming to IRS Grade A specification.# Quoted rate shall be inclusive of transportation charges, loading/unloading charges and handling charges at site.Entire works shall be done as per special conditions of contract, general conditions of contract and as per instructions of engineer-in-charge |
| 3 | Replacement of damaged/dented structural of hull in FACT Pearl of Periyar BargeScope of work includes:# Cutting and removing damaged/dented structural of hull in FACT Pearl of Periyar Barge.# Fitup & welding of structural in damaged portions of the hull.#Carrying out NDT tests like dye penetrant test, magnetic particle test, hose test, RT etc.. in steel renewed regions as per the recommendations of IRS.#Painting of two coats of primer in steel renewed regions. Primer to be used shall be epoxy zinc phosphate paint chromate paint.Note: Entire welding works in hull shall be done by IRS qualified welder.Entire work shall be done as per special conditions of contract, general conditions of contract and as per instructions of engineer-in-charge |
| 4 | Replacement of damaged D type hollow fenders in FACT Pearl of Periyar bargeScope of work includes:# Removing damaged D type hollow fenders fixed to sheer strake of the barge# Replacement/Repair of dented/damaged holding plates of the fender.# Fixing the new D type hollow fenders supplied by FEW# Fasteners required for fixing the new fenders shall be in scope of contractor.Entire works shall be done as per special conditions of contract,general conditions of contract and as per instructions of engineer-in-charge. |
| 5 | Bend correction of handrail, midrail and stanchions of FACT Pearl of Periyar bargeScope ofwork includes:# Straightening / replacing the bent/damaged handrail, mid rail and stanchions of the barge located at weather deck of the barge.# Plates, pipes and solid rods required for the replacement shall be in scope of contractor.# Contractor shall assign skilled fitters & welders for the replacement/repair works in handrail, midrail and stanchionsEntire works shall be done as per special conditions of contract, general conditions of contract and as per instructions of engineer-in-charge. |
| 6 | Painting of waterline to deck region of FACT Pearl of Periyar barge:Scope of work includes:# Cleaning of waterline to deck region of the hull by high pressure water jet cleaning.#Application of one coat of epoxy finish paint on waterline to deck region of the hull.#In case of rusted regions on hull, same shall be buffed and two coats of epoxy zinc phosphate primer and two coats of epoxy finish paint shall be applied.#Paint & thinner required for thejob shall be in scope of contractor. Shade of the applied finish paint shall be same as that of the existing shade.Entire works shall be done as per special conditions of contract,general conditions of contract and as per instructions of engineer-in-charge |
| 7 | Painting of waterline to deck region of FACT Pearl of Periyar barge:Scope of work includes:# Cleaning of waterline to deck region of the hull by high pressure water jet cleaning.#Application of one coat of epoxy finish paint on waterline to deck region of the hull.#In case of rusted regions on hull, same shall be buffed and two coats of epoxy zinc phosphate primer and two coats of epoxy finish paint shall be applied.#Paint & thinner required for thejob shall be in scope of contractor. Shade of the applied finish paint shall be same as that of the existing shade.Entire works shall be done as per special conditions of contract,general conditions of contract and as per instructions of engineer-in-charge |
| 8 | Painting of underbody of valve operating platform inFACT Pearl of Periyar Barge:Scope of work includes :#Cleaning of underbody of valve operating platform by chipping, grinding and buffing.#Application of two coats of coal tar epoxy paint on under body#Paint & thinner required for the job shall be in scope of contractor.Entire works shall be done as per special conditions of contract,general conditions of contract and as per instructions of engineer-in-charge. |
| 9 | Painting of handrail, midrail & stanchionsof the FACT Pearl of Periyar barge:Scope of work includes:#Cleaning of handrail, mid rail & stanchions of the barge by chipping, grinding & buffing.# Application of one coats of epoxy zinc phosphate primer and two coats of epoxy finish paint.# Paint & thinner required for the job shall be in scope of contractor. Shade of the applied finish paint shall be same as that of the existing shade.Entire works shall be done as per special conditions of contract,general conditions of contract and as per instructions of engineer-in-charge |
| 10 | Painting of cargo hold& other miscellaneous areas ofFACT Pearl of Periyar Barge:Scope of work includes:#Cleaning ofcorroded regions of the cargo hold of the barge bychipping, grinding & buffing# Application of two coats of epoxy zinc phosphate primer.# Paint & thinner required for the job shall be in scope of contractor. Shade of the applied finish paint shall be same as that of the existing shade.Entire works shall be done as per special conditions of contract, general conditions of contract and as per instructions of engineer-in-charge |
| 11 | Painting of ballast tanks in FACT Pearl of Periyar barge:Scope of work includes:#Cleaning ofcorroded regions of the ballast tanks of the barge bychipping, grinding & buffing# Application of two coats of epoxy zinc phosphate primer.# Paint & thinner required for the job shall be in scope of contractor.Entire works shall be done as per special conditions of contract,general conditions of contract and as per instructions of engineer-in-charge. |
| 12 | Painting of Anchor Chain & Anchor in FACT Pearl of Periyar BargeScope of work includes:#Cleaning ofanchor chain & anchor by chipping, grinding & buffing# Application of two coats of coal tar epoxy paint# Paint & thinner required for the job shall be in scope of contractor.Entire works shall be done as per special conditions of contract,general conditions of contract and as per instructions of engineer-in-charge. |
| 13 | Painting of other miscellaneous items in FACT Pearl of Periyar Barge:Scope of work includes:# Painting of deck fittings# Painting of windlass# Painting of fire lines.# Painting of foldable MastOne coat of epoxy primer & two coats of epoxy finish paint shall be applied for the items. Shade of the applied finish paintshall be same as that of the existing shade. Paint & thinner required for the job shall be in scope of contractor.Entire works shall be done as per special conditions of contract, general conditions of contract and as per instructions of engineer-in-charge. |
| 14 | Cleaning of Cargo hold, Ballast tanks, Fore Peak & Void Spacein FACT Pragatiyan BargeScope of work includes:#Clearing muck, sludge & mud accumulated in cargo hold, ballast tanks, Fore Peak & Void spaces # Cleaning the spaces inside cargo hold & ballast tanks for the inspection of IRS.Entire works shall be done as per special conditions of contract, general conditions of contract and as per instructions of engineer-in-charge. |
| 15 | Rectification works in Engine room & other areas of FACT Pearl of Periyar barge:Scope of work includes:# Replacing rpm, lube oil & temperature sensors of the main engines/auxiliary engine/gear box. Sensors procured shall be from the OEM.# Replacing old/damaged hoses of intercooler, coolant pump, exhaust lines, diesel fuel lines etc.. in main engines & auxiliary engine. Hoses procured shall be from the OEM.# Providing concrete cofferdam at gland packing side of propeller shaft bush bearings (Port & Starboard side).# Rectification of leak in radiator heater in starboard side main engine.# Replacing damaged doors at Masters Cabin & Electrical Cabin with WPC/FRP doors.# Supply & fixing of 5 nos. of FRP/PP fire hose boxes.Spares required for the works mentioned above are under the scope of contractor.Entire works shall be done as per special conditions of contract, general conditions of contract and as per instructions of engineer-in-charge. |
| 16 | Providing eye wash at aft side of the barge:Scope of work includes:# Providing eye wash at aft side of the barge at the location recommended by FACT-CD safety department.# Eyewash unit will be provided by FACT-CD to the# Necessary plumbing, welding & electrical works required for the fitment of eye wash is in scope of contractor. Also, eye wash system shall be pressurized at 0.5 kg/cm2 by using suitable pump by using suitable pump.# All the necessary spares including the pump required for the job shall be in scope of contractorEntire works shall be done as per special conditions of contract,general conditions of the contract and as per instructions of engineer-in-charge |
| 17 | Service of Qualified Marine ElectricianScope of work includes:Providing service of qualified marine Electrician for carryingout electrical maintenance/repair works of Pearl of Periyar barge during the annual survey.Entire works shall be done as per special conditions of contract, general conditions of contract and as per instructions of engineer-in-charge. |
| 18 | Stability Re-calculation of Pearl of Periyar:Stability re-calculation of Pearl of Periyar barge as per the latest IV Act, 2021.Stability re-calculation of the Pearl of Periyar shall be carried out by a qualified Naval Architect approved by KIV and tools/equipments required for the stability-recalculation shall be in scope of contractor.Re-calculated Stability Report prepared by the contractor shall be approved by KIV and same shall be submitted to FEW.Entire works shall be done as per special conditions of contract, general conditions of contract and as per instructions of engineer-in-charge. |
| 19 | Scope of work includes providing assistance to miscellaneous works that are not mentioned in schedule of work but are required for the completion of the annual survey of FACT Pearl of Periyar barge. |