| 1 | Engagement of unskilled labourers for clearing of bricks, site clearance, disposal of unserviceable material and shifting of existing gate at designated location selected by incharge medical officer of PHC Batwina |
| 2 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50m lead as per the direcyions of EIC : in cement mortar 60%quantity serviceable |
| 3 | Earthwork in excavation by manual means in trenches for foundations, drains, pipes,cables etc (not exceeding 1.5m in width) and for shafts, wells, cesspits, and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getting out excavated earth and disposal of the same as directed in all kinds of soils |
| 4 | Providing and laying of dry stone soling dully hand packed including watering, dressing, ramming with all carriages, loading, unloading and stacking etc complete |
| 5 | Provinding and laying in position cement concrete of specified grade excluding the cost of centring and shuttering all work upto plinth level in 1:4:8 mix (1cement: 4coarse sand: 8 graded stone aggregate with 40mm nominal size) with all carriages, loading, unloading and stacking etc complete job |
| 6 | Provinding and laying in position cement concrete of specified grade excluding the cost of centring and shuttering all work upto plinth level in 1:3:6 mix (1cement: 3coarse sand: 6 graded stone aggregate with 20mm nominal size) with all carriages, loading, unloading and stacking etc complete job |
| 7 | plums 20% |
| 8 | Centring and shuttering including propping, strutting and removal of form work for foundations, |
| 9 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 insuperstructure upti all floors including carraige of bricks in :Cement mortar 1:6 ( 1 cement : 6 coarse sand) |
| 10 | Extra for brick work with common burnt clay bricks/cement concrete bricks insuperstructure above plinth level upto floor five level |
| 11 | 12mm thick cement sand plaster in 1:6 mix |
| 12 | Providing and laying 50mm thick factory made cement concrete interlocking paver block of M-30 grade made by block making machine with strong vibratory compaction and of approved size and design/shape laid in required colour and pattern over and including 50mm thick compacted bed of fine sand, filling the joints with coarse sand etc. all complete as per direction of Engineer-in-charge. |
| 13 | Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat ofapproved steel primer all complete. |
| 14 | Finishing walls with water proofing cement paint of approved brand and make to give required shade onNew work (two or more coats applied @ 3.84 kg/10sqm) |
| 15 | Carriage of materials sand by means of mechanial transport for an average lead of 15km |
| 16 | Carriage of materials aggregates by means of mechanial transport for an average lead of 15km |
| 17 | bricks from 60km |
| 18 | Provision for signboard and photographs Please Enable Macros to View BoQ information |