| 1 | 15 cm. To cover the ground surface by cutting theaverage soil and removing vegetation and small plantsand lifting of raw material and shrubs for 1.5 metersand putting them up to a distance of 50 meters. |
| 2 | Digging soil up to 1.5 depths in the foundation, ditch,barn, crushing the bottom, pouring water, grooming thearmpits, removing the carved soil, refilling the emptyplaces with soil after filling the foundation andremoving the remaining soil for a distance of 50 meters |
| 3 | Cement concrete foundation or floor 40 mm. The stoneof the renowned measure is to be poured into thelimestone ballast /brick soil, cement-sand masala in theratio of 1 cement : 4 sand : 8 ballast and cutting,including lowland. |
| 4 | Cement concrete mixing, pouring and operating a nickeland surface vibration machine (vibrator) on the topsurface of the road and preparing it in the desired grade,chamber and super elevation for non-sliding surface! In1:2:4 mix |
| 5 | The work of cutting, folding and placing and tying ironfor RCC work is done to supply. |
| 6 | In the foundation and chair, they are made of stone incement-gravel spices, including the edge of the side andthe lowlands etc. In CM 1:4 |
| 7 | Foundation and chair first class brick masonry cement -gravel in 1:6 spices, including bunding and lowland. |
| 8 | Putting the roof of the first-class stone straps, filling thejoints from the top and bottom with a stone arc withcement spices in the ratio 1: 4 |
| 9 | Pour the vines in a small piece of concrete brick orstone in cement masala 1:4, strip over the roof andsupply. With brick pieces |
| 10 | Cement plaster is mixed with cement-gravel in the ratioof 1:4 on the wall and crushing the joints and regularlyfor 14 days. 25 mm thick |
| 11 | The function of color whitening is done in 3 layers sothat there is a similar aura (to give even shade) on thenew work / old work. |
| 12 | Providing and fixing double flanged ISI marked GI pipes medium duty(classB) Steel tube as per IS:1239 or amended upto date and zinc coating as per IS4736 with GI fittings excluding valves as vertical pipes. |
| 13 | Construction of Pump house of brick/ stone masonry ofrequired size suitable for installation of maximum 4no.Mono block pump sets as per approved GA drawing,scope of work and technical specification completework in all respect including electrical works forlighting and fans, rain water drainage. The plinth areaof pump house shall be area of measurement. |
| 14 | Providing, installation, testing and commissioning ofCentrifugal Monoblock pump set conforming toIS9079, 2 pole motor operating at synchronised speed of 3000 RPM with requisite MOC impeller,priming funnel, cock, suitable flanges at suction anddelivery side. Pump shall have common shaft for pump and motor. Motor shall be suitable forworking on 415V±10%, 3 Ph, 50 Hz A.C. Supply.Motor shall be TEFC type and Pump set shall be suitable for working at various discharge and headrequirements as per scope of work. Pump shall beerected on C.C. foundation/ crosschannels/ 12.5 HP |
| 15 | Providing and fixing of flanged/ plain ended MSSpecials made from MS sheet strips of relevant ISspecification of approved thickness by welding,lowering, laying, aligning, fixing in positionat all level/depths intr enches complete including all taxes,material, labour, inside lining, outside coating, testingand commissioning along with pipe line |
| 16 | Supply and fixing man hole cover and ventilation |
| 17 | Supply and fixing Rubber ring, nut bolt, etc |
| 18 | Contengency and material testing |
| 19 | Three time Photo and Display board Lumpsump Please Enable Macros to View BoQ information |