| 1 | ATA 2026- Repair and replacement of damaged wooden grids and associated wooden supports in SAP of FACT Cochin Division, Ambalamedu. |
| 2 | Taking out and cleaning the existingPVC fills fromcooling Towerand placingin position inside the cooling towerincluding re-arranging the wooden joists for accomodating the PVC fillsif required at all heightsincludingall labourcharges, scaffolding charges etc. complete as per departmental instructions. |
| 3 | Removal of damaged/ reparable wooden grids from cooling tower and stacking the same at site for reconditioning. |
| 4 | Reconditioning and forming new grids with dismantled materials/ new maruthu wood including fixing charges of necessary SS nails and placing in position in cooling tower at all heights includingcost of all labour, scaffolding charges etc. completeas per departmental instructions (SS nails will be supplied by FACT) |
| 5 | Supply of 38 mm x12 gstainless steel wire nails to civil store |
| 6 | Supply of 50 mm x12 gstainless steel wire nails to civil store |
| 7 | Supplying good qualityMaruthu’ wood wrought and put up forjoists, planks & gridsof specified size to suit at site as per departmental instructions. |
| 8 | Labour charges for conveying from site store and fixing in positionthe Maruthu wood wrought and put up joists, planks,runners etc including labour charges for fixing nails if required and providing gooves & cutting at edges etc. as per site conditions, after removing the damaged members,at all heights as per departmental instructions |
| 9 | Supplying good quality\"Maruthu’ wood wrought and put up at site and making new grids to suit the existing grid of SAP Cooling Tower (Aprox. overall size 1.30x1.25 m, consists of 2 Nos, 1.25 m long member of size 70x30 mm and 8 Nos,1.30 m long horizontal members of size 60x15 mm)includingcost of 0.0146 m3 of maruth wood, transportationcharges, labour for making grids, fixing charges for 32 Nos SS nails (2 nos each in joints), conveying to work spot after necessary painting (Painting charges will be paid by seperate items) , placing in positionat all heights after dismantling and removing the existing damaged wooden grids from all heights ,scaffolding chargesetc. complete in all respects as per departmental instructions (SS nails will be supplied by FACT by seperate item) |
| 10 | Applying one coat of Epoxy Zinc Phosphate Primer of approved brand & qualityafter thoroughly cleaningthe surface of new/old grids/planks, runners/joists to remove anyforeign materials including cost of primer, labour charges and all other incidental charges etc.complete as per departmental instructions at site. |
| 11 | Applying one coat of epoxy high build finish paint to grids using\"Epilux - 4 high build \"of Berger Paints or equivalentapprovedbrand over the primer already done including cost of paint, cost of brush , labour charges and all other incidental charges etc.complete as per deptl. instructions. |
| 12 | Collecting spoil earth, debris etc. from site, conveying to places with an average lead of 1 KM by mechanical transport, dumping and forming embankment for filling, spreading in layers as per directions (20%deduction will be made if measured loose in lorries & from stack). |