| 1 | Earth work in Excavation in trenches for foundations pipes cables etc in ordinary soil (loam clay or sand) including lift up to. |
| 2 | Providing and Laying Cement concrete (1:6:12, 1cement: 6 coarse sand: 12 Brick ballast nominal size 40 mm ) in all completion of work. In foundation and floor . |
| 3 | Class-150 brick work in 1:4 cement and corse sand mortar of 1.25 fineless modulus mortar in foundation and plinth including supply of all materials, labour, tools & plants etc, required for proper completion of work. |
| 4 | Providing and Laying damp proof coarse 25 mm thick with cement concrete 1:2:4 (1 cement :2 coarse sand :4 graded stone aggregate 10 mm nominal size) and curing Complete. |
| 5 | Class-150 brick work supper structure above plinth lebel upto floor to lexle (upto two story) including necessary. |
| 6 | M.S or Iron Work or Tubular Pipe of approved size by welding etc all ladger railing balcony railing etc all complation of work . |
| 7 | Providing and laying of stone ballast with stone dust including water allowance for proper consolidation with hand ramming including labour T&P etc all complete. |
| 8 | providing And laying Checkered terrazo tiles 20mm averege thick marbal chips of size up to 6mm .in floorson 25 mm thick bed of morter1:1:1 etc all complete. |
| 9 | 12mm thick cement plaster in single coat on fair side in 1:4 cement, fine sand etc all complete. |
| 10 | Providing and laying of wall putty for making wall surface smooth with labour T&P etc all complete. |
| 11 | Finishing walls with two coat of acrylic smooth exterior paint of best quality including supply of all material, labour T&P etc all complete. |
| 12 | Painting or varnishing on iron work in large area with one priming coat and two coat of ready mix enamel paint of approved quality including supply of all material, labour tandP etc all complete. |
| 13 | Providing and fixing R.C.C bench with hand rest back rest including all Complete of work |
| 14 | Devlopment of lawn by Catpeting of slection no-1 Grass incl. All complition of work. |
| 15 | Development of hedge bed Digging 0.45 mtr wide Supply and mixing of manure with soil in 1:1 Ratio Also Supply and planting of Muraya exotica plants incuding all Comlete of work. |
| 16 | One Year meintainance work of Hedge including all complection of work |
| 17 | One Year meintainance work ofLawn including all complection of work |
| 18 | Supply & Planting of Bottle palm including earth work labour all complition of work. |
| 19 | Supply & Planting of pandula plant including earth work labour all complition of work. |
| 20 | Supply & Planting of Ficus plant including earth work labour all complition of work. |
| 21 | S/F of 1.5 hp submersible pumb ISI mark 2000 Lpm. 60 mtr head i/c all etc (kirlosker/KSB/Cromption make) |
| 22 | GST 18% Please Enable Macros to View BoQ information |