| 1 | Supply and installation of 1200 NB MS Pipe Line at pump suction side and header as per IS specification and suitable for mixed flow/waste water pump complete in all respects |
| 2 | Supply and installation of 1000 NB MS Pipe Line at pump suction side as per IS specification and suitable for mixed flow/waste water pump complete in all respects for replacement in existing pumps. |
| 3 | Supply and installation of 900 NB MS Pipe Line at pump delivery side as per IS specification and suitable for mixed flow/waste water pump complete in all respects. |
| 4 | Removal and lifting of 4(four) nos. old existing pumps including deployment of necessary manpower, lifting equipment, tools and tackles; dismantling and detaching all connected fittings; safely lifting and removing the pumps without causing damage to existing structures or electromechanical components and shifting the dismantled pumps to the designated location as directed by the Engineer-in-Charge including provision of all temporary supports, rigging arrangements and safety measures required for proper completion of the work. |
| 5 | Supplying, unloading, storing, laying, effecting proper connections, testing and commissioning of following sizes of 1.1 KV XLPE insulated Aluminium conductor armoured cables overhead cable trays or over MS supports in masonry trenches including providing the MS supports and clamps for fixing to supports in an approved manner complete as required and as per specifications.a. 3.5 core x 300 sq.mm copper cable |
| 6 | Supplying, unloading, storing, laying, effecting proper connections, testing and commissioning of following sizes of 1.1 KV XLPE insulated Aluminium conductor armoured cables overhead cable trays or over MS supports in masonry trenches including providing the MS supports and clamps for fixing to supports in an approved manner complete as required and as per specifications.b. 3.5 core x 400 sq.mm copper cable |
| 7 | Supply and fixing in position of1000A TP ACB EDO Cu. tape/wires including providing all fixing accessories and effecting proper connections.1000A TP ACB BREAKER |
| 8 | Supply and fixing in position of 500A TP Contractor Cu. tape/wires including providing all fixing accessories and effecting proper connections. |
| 9 | Supply and fixing in position of 40X6mm Co. strip tape/wires including providing all fixing accessories and effecting proper connections. |
| 10 | Supply and installation of earth stations at locations as called for with COPPER earthing Plate 600X600X6mm wth 40X6mm Strip of 3000 mm length, 50mm GI Pipe outer dia complete with accessories as per IS : 3043-1987 requirement complete as required. |
| 11 | Supply and installation of earth stations at locations as called for with GI earthing Plate 600X600X6mm wth 40X6mm Strip of 3000 mm length, 50mm GI Pipe outer dia complete with accessories as per IS : 3043-1987 requirement complete as required. |
| 12 | Supply and fixing in position of 40X6mm GI. strip tape/wires including providing all fixing accessories and effecting proper connections. |
| 13 | APFC Panel repairing, fitting, fixing & commissioning with incomer MCCB |
| 14 | Supply and installation of GI Steel Tubular Pole SP-66, 12.00 m long, conforming to relevant IS standards, complete in all respects. |
| 15 | Supply and fixing of Galvanized Tubular Pole Clamp, size 50 mm × 6 mm, suitable for SP-66 pole, complete with fasteners. |
| 16 | Supply and installation of GI Channel Cross Arm, size 100 mm × 50 mm × 6 mm × 2200 mm, including clamps, nuts and bolts. |
| 17 | Supply and installation of 3-Phase, 4-Wire Combined CT/PT Unit, Accuracy Class 0.5, CT ratio 50/5 A |
| 18 | Supply and fixing of 11 kV Polymer Pin Insulator, 5 kN, FRP pin 24 mm. |
| 19 | Supply and installation of GI Pipe Earthing Electrode, 50 mm dia, 3.0 m long, 3.15 mm thick, with 15 mm dia perforations at 30 cm intervals. |
| 20 | GI Nuts & bolt with GI washer(assorted) |
| 21 | Supply and fixing of Pole Clamp |
| 22 | Supply and installation of 11KV GOAB 630Amp switch |
| 23 | Supply and installation of 11KV DO Fuse Set 400A Assembly |
| 24 | Supply and installation of 11KV 5KA Lightning Arrestor (Line Type, Distribution Class) |
| 25 | Supply, laying and connection of GI Strip 50 mm × 6 mm for DTR neutral earthing, complete in all respects. |
| 26 | Supply, laying and connection of GI Strip 25 mm × 3 mm for DTR earthing, complete in all respects. |
| 27 | Supply, installation and testing of 11/0.4 kV, 500 kVA Distribution Transformer, copper wound, BIS Level-2 energy efficiency compliant, including all standard accessories. |
| 28 | Supply and fixing of 11 kV Danger Plate. |
| 29 | Supply and crimping of Aluminium Cable Lugs, 95 sq mm |
| 30 | Supply and crimping of Aluminium Lugs-120Sq mm |
| 31 | Supply and erection of GI Angle (50x50x6)mm |
| 32 | Supply and installation of ENERGY METERS Metering Cabinet |
| 33 | Supply and installation of 1.1 LT GRADE 1C x 400 sq.mm. |
| 34 | Supply and installation of Microprocessor based with inbuilt earth-fault protection module 4 Pole MCCB 400A ICS = 100% ICU 36kA (Minimum) |
| 35 | Grouting & mufflering of steel tubular pole of type SP-66 and SP-76 as per specification and drawing with minimum planting depth of 2.15 m (using PCC) |
| 36 | Supply and installation of DTR Fencing as per REC standard specification complete with material & labour |
| 37 | Transformer pad complete in all respects. Please Enable Macros to View BoQ information |