| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil :100% |
| 2 | CEMENT CONCRETE (CAST-IN-SITU)Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) |
| 3 | CEMENT CONCRETE (CAST-IN-SITU)Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
| 4 | RANDOM RUBBLE MASONRYRandom Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarsesand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with:7.1.1 Cement mortar 1:6 (1 Cement : 6 coarse sand) |
| 5 | Dry random rubble masonry with hard stone in foundation and plinth: Without bond stone |
| 6 | Providing and laying damp-proof Course 50 mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand: 4 graded stone aggregate 20 mm nominal size) and curing complete |
| 7 | Dumping/filling stone including cost of stones. in Horizontal on level |
| 8 | Providing & making Gabion structure with Mechanically Woven Double Twisted Hexagonal Shaped Wire mesh Gabion Boxes as per IS 16014:2012,MORTH Clause 2500, of required size, Mesh Type 10x12 (D=100 mm with tolerance of ± 2%) Zinc coated, Mesh wire diameter 3.0mm, mechanically edged/selvedged with partitions at every 1m interval and shall have minimum 10 numbers of openings per meter of mesh perpendicular to twist, tying with lacing wire of diameter 2.2mm, supplied @ 3% by weight of Gabion boxes, filled with boulders with leastdimension of 200 mm, as per drawing, all complete as per direction ofEngineer-in-charge. |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form work for Foundations, footings, bases for columns |
| 10 | providing and laying River bed meterials complete job |
| 11 | Carriage of material by mechanical transport including loading/unloading and stacking complete from source to site of work Sand avg lead upto 45 kms avg |
| 12 | Carriage of material by mechanical transport including loading/unloading and stacking complete from source to site of work Stone agg below 40 mm avg lead upto 15 kms avg |
| 13 | Carriage of material by mechanical transport including loading/unloading and stacking complete from source to site of work Stone avg lead upto 15 kms avg Please Enable Macros to View BoQ information |