| 1 | Site Clearnce and other unseen item |
| 2 | Pthotgraphy work |
| 3 | Digging Of Submerged soil in or under water and or liquid mud si no 258(a) |
| 4 | Earth work in excavation in Nala |
| 5 | Sand filling in foundation with complete work. |
| 6 | P.C.C. work in 1:4:8 cement sand with stone dust in bed of drain. |
| 7 | RCC work with cement approved coarse sand and 2cm. (3/4\"\") gauge approved stone ballast in the proportion 1:1.5:3 in lintels of doors and windows, excluding supply of reinforcement and its binding but including its fixing and binding the same with 24 B.W.G.I wire.and including necessary cantering and suttering etc and also including supply of all materials,labour and tools and plants etc. required for proper completion of the work. binding wire to be supplied by the contractor free of cost. S.I. No.-288 (As in item (283) above but in RCC T-beam and slab roof in 1.1.5.3) |
| 8 | Mild steel of iron in plain work such as reinforced concrete/ brick work (when not included in over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel, its wastage and hooks and authorised over lapping shall be measured. SI No. 504 |
| 9 | E/w of disposle by cartage lead upto 4.00 Km distance away from site work by tractor trolly. |
| 10 | RCC work with cement approved coarse sand and 2cm. (3/4\"\") gauge approved stone ballast in the proportion 1:2:4 in lintels of doors and windows, excluding supply of reinforcement and its binding but including its fixing and binding the same with 24 B.W.G.I wire.and including necessary cantering and suttering etc and also including supply of all materials,labour and tools and plants etc. required for proper completion of the work. binding wire to be supplied by the contractor free of cost. S.I. No.-288 (As in item (283) above but in RCC T-beam and slab roof in 1.1.5.3) |
| 11 | Supplying laying and consolidation of granular material i.e. Stone Dust of approved quarry & quality in granular sub (Blanket Coat) by 3-wheeled steel/vibratory power roller 8-10 tonne with required quantity of water to achieve the desired density after preparing the existing surface in proper camber, supreading the material in uniform layer, proper camber and required thickness of 15 cm (compacted) including hire & fuel charges of power roller with driver, maintenance of barriers, caution posts, light at night and also including cost of all materials, T&P etc. required for proper completion of work as per direction of Engineer-in-charge in- |
| 12 | Cement concrete with 4cm (1/2\"\") gauge approved stone ballast, approved coarse sand. cement in the proportion 1:6:12 including supply of all materials,labour and tools and plants etc. required for proper completion of the work. S.I. No.273 |
| 13 | CC work in 1:1.5:3 with Cement sand and 20mm gauge granite stone grit including supply of all materials, labour and tools and plants etc. required for proper completion of the work. |
| 14 | Providing and Laying of specified quality separting membrane plastic sheeting of 125 microns. |
| 15 | Providing and fixing filler material (Shalited Board 18 mm thick) at construction joint. |
| 16 | Fixing of Display Board etc. Please Enable Macros to View BoQ information |