| 1 | Removal of Fallen or damaged fencing inPlant siteat various locations and handling over of the materials to the department store., all complete as per specifications and as directed by the Engineer in Charge. |
| 2 | Providing \"HOE\" (Excavator cum dozer)/JCB for miscellaneous works at different locations as and when required including all operational cost to complete the job in all respects as per specifications and as directed by the Engineer-in -charge |
| 3 | Disposal of excavated earth, concrete debris, wooden pieces, brick pieces, waste materials etc., in the designated area in 2.83 cum capacity tractor (2.0 cum net qty) within plant premises as per the instructions by the Engineer in Charge. |
| 4 | Earth work in Excavation manually/Exavatorup to 1.50m depth for footings,foundation trenches or drains in all type of soil including dressing of sides and ramming of bottoms,including de watering wherever required, back filling in layers not exceeding 150mm thickness including watering, ramming etc., and disposal of surplus excavated earth up to a lead of 500mts and lift up to1.50 mts., levelling and dressing of disposed earth etc. complete as per drawings, specifications and as directed by the Engineer-in-charge |
| 5 | Demolishing cement concrete Nominal concrete 1:3:6 or richer mix(i/c equivalent design mix) manually/by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. |
| 6 | Providing and fixing Centering /Shuttering for Foundations/pedestals including strutting ,propping,scaffolding where ever required and removal of form after setting of concrete for all heights etc.,all complete as per specifications and as directed by the Engineer-in-charge. |
| 7 | Providing and laying plain cement concrete of grade 1:2:4 [1 cement: 2 coarse sand: 4 stone aggregate], using 20mm and down gauge crushed stone aggregate of approved quality in foundation, plinth, pedestals etc.,for all the works with ACC/ Ultratech/ Birla A1/ Jaypee cement of 43 grade, using cementious content as 320 kg with cement flyash ratio of 80:20 (80% cement : 20% fly ash,flyash available free of cost at plant but transporting by contractor) minimum cement content excludingfly ash should be 256 kg/cum, shuttering, finishing, compacting, levelling, curing etcetc. including embedding the fencing post and strutswhile laying the concrete, centering and shuttering, spreading, levelling, ramming, finishing, curing etc. complete as per specifications and as directed by the Engineer-in-charge.(M.S post will be paid separately under relevant item). |
| 8 | Providing, fabricating, transporting, erecting and fixing in position structural steel members of SAIL/ VIZAG/ JINDAL/ TATA make of sections like tubes, flats, angles, channels etc., at all heights and including cutting, grinding, welding where ever required, hoisting, fixing in position and applying two coats of synthetic enamel paint of approved make over a coatof red oxide primer etc., complete all as per the drawings, specifications and as directed by the Engineer in Charge. |
| 9 | Providing and fixing chain link fabric fencing Made of G.I. wire of 4 mm diameter of required width in mesh size 50x50 mm including strengthening with 2 mm dia G.I. wire, nuts, bolts and washers as required and , completeincluding all materials, labour, transport, scaffolding as required and cleaning after completion of work etc.complete as per specifications and as directed by the Engineer.etc., all complete as per specifications and as directed by the Engineer-in-charge. |
| 10 | Repairing of disturbedGI wireMesh fencing in various locations of Plant site including cutting ,binding ,fitting ,tightening & including allnecesarry fixtures etc .all complete work as per specifications and as directed by the Engineer-in-charge. |
| 11 | Finishing with Epoxy paint One or more coats on Steel work at all locations prepared and applied as per manufacturer\"s specifications including appropriate priming coat ,preparation of surface etc,includingcleaningand scraping ofold loose paint/scales,rust and dust etc., completeincluding all materials, labour, transport, scaffolding as required and cleaning after completion of work etc.complete as per specifications and as directed by the Engineer-in-charge. |
| 12 | Providing and Fixing of Concertina coil fencing with required dia 610 mm [ having 50 Nos. round per 6 meter length] upto 3 m height of wall with existing angle iron \"Y\" shaped placed 2.4 m or 3.00 m apart and with 9 horizontal R.B.T stud tied with G.I. staples and G.I. clips to retain horizontal including necessary bolts or G.I. barbed wire tied to angle iron , including removing of old damaged/ fallen or hanging Concertina coil from Supported structures/MS Angles and handling over to the sectional store ,all complete as per direction of Engineer-in-charge with reinforced barbed tape[R.B.T]/Spring core [2.5 mm thick] wire of high tensile strength of 165 kg/sq.mm with tape [0.52 mm thick] and weight 43.478 gm/meter [cost of M.S. angle ,C.C blocks shall be paid separately]. |
| 13 | Providing and fixing with G.I. barbed wire Fencing to \"Y\" angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 m (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles including removing of old damaged/fallen or hanging barbed wire from supported structures/MS Angles etc and handing over to sectional stores etc., all complete as per specifications and as directed by the Engineer-in-charge. (Cost of posts, struts, earth work and concrete work to be paid for separately). Note: Payment to be made per metre cost of total length of barbed wire used. |