| 1 | Supply, fixing, testing and commissioning of six meter all in one solar integrated pole system with aesthetically designed road lighting optic luminaire of IP 66 and integrated pole 6 Meter solar pole light.(i) system lumen>6500Lm with efficacy of >150 lm/watt.system wattage shall not be more than 45 W. Life expectancy >50000 Hr, color temperature 3000k/4000k/5700K, standard light profile 6H 100% + 6H 50%, CRI>70, average lighting beam angle 120 degrees, housing pressure die cast aluminum with corrosion resistance polyester powder coated, impact resistance > IK 07, lamp starting time should be not more than 10 seconds, Thermal managment system should be provided and LED must be mounted on heat conductive aluminium sink with suitable large are surface be means of fins to dissipate heat to ambient air. Over voltage protection (ii) Luminaire should confirm to applicable IEC 61000-3-2, IEC 61547, IEC 61000-3-2, IEC 61547, 2 Battery capacity minimum 100 A-H, lifePO4, lifr cycle minimum 2000 @ 90% DOD with IP 68, dimension maximum 120x146x470mm, 13.2 kg, Battery should comply with IS 16406-2025/ IEC 62133:2012, BIS certification etc with minimum Backup for Two days @ standard light profile 6 Hr 100% + 6 Hr 50% per day. (iii) PV module mono-Si-minimum 400Wp / 23 Voc. Dimension not more than 172x172x4000mm solar cell effciency minimum 16.4%, 8 site string total nominal peak power output minimum 400wp, each shall be min 50wp. Shall comply IEC61215.(iv) Total column length 6 mtr withminium 12 mm thick reinforced vase plate, or total column height 6 mtr, with lower 2 mtr bottom Galvanised/ powder coated MS pipe of min. 04 mm thick with min.4 mtr. AL alloy to hold solar PV module.(v) Foundation 1:2:4 RCC Cross section :- minimum 450 x 450 mm, Deep:- minimum 1200 mm, Foundation Bolt :- Minimum 20 mm dia and 600 mm long. 1- Standard fixture should confirm to applicable IEC 60598-1, IEC 61000-3-2, IEC 61547, LM 79 & LM 80, BIS2- Test report for LED LM 80 (IS-16105), Internal wiring, fiber glass, insulted multisrand wire. 3- Over voltage protection declaration of conformity safely compliance report for charge controller and should be certified as per IEC 60598-1, IEC 61000-3-2, IEC 61547 4- Test report for vertical pole tested for shock & vibration, wind force to meet safety parameters.5- Battery test report from 3rd party, along with other test reports.6- IEC certificate for IEC 60598-2-3 and only IEC certificates from reputed laboratory/testing NABL approved complete system shall e complete in all respect along with foundation, carrying forwarding storage and System approved by Engineer-In-Charge . Complete system shall be complete in all respect along with foundation. |