| 1 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, upto 1km transporting to site, spreading, grading to required slope and compacting to meet requirement of 97% of proctor density.MORT&H305 (3.18) complete in all Aspects (Excluding G.S.T but Including All Taxes Labour Cess, Royalty, Labour, Material & T&P.) |
| 2 | Empty cement bags of good condition(plastic filled with local sand including filling, stitching stacking at site work.complete in all Aspects (Excluding G.S.T but Including All Taxes Labour Cess, Royalty, Labour, Material & T&P.) |
| 3 | Supply and Laying of Geo textile (sheet) made of 240 gsm woven multifilament polypropylene yarn for filter material underneath pitch in slopes complete.As per Irrigation Dept. S.I. No. 34+41 complete in all Aspects (Excluding G.S.T but Including All Taxes Labour Cess, Royalty, Labour, Material & T&P.) |
| 4 | Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications As per MoRTH Spec.2504 Sr no-15 complete in all Aspects (Excluding G.S.T but Including All Taxes Labour Cess, Royalty, Labour, Material & T&P.) |
| 5 | Providing and ercting a \" W \" metal beam crash barrier comprisng of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150x75x5 mm spaced 2 m center to center 1.8 m high, 1.1 m below ground/ road level, all steel parts and fitments to be galvanised by hot dip process , all fittings to confirm to IS:1367 and IS:1364 metal beam rail to be fixed on the vertical post with a spacer of channel sction 150x75x5 mm. 330 mm long complete as per clause 810 complete in all Aspects (Excluding G.S.T but Including All Taxes Labour Cess, Royalty, Labour, Material & T&P.) |
| 6 | Fabrication and supply & fixing of mild steel grill as per design including the stair case railings etc. with square and round bars, M.S. angle iron. T-iron, M.S. Flats as directed by the Engineer in charge supply of all steel and its wastage, cutting & drilling holes and welding where necessary including each joints to be perfectly welded and joined including supply of all materials, Nuts, Bolts, labour, tool & plants etc. and also including special machinery such as drilling of welding grinding plants etc. as required for the proper completion of the work and supplying a coat of red lead paint over the entire area. AS per NS 4 complete in all Aspects (Excluding G.S.T but Including All Taxes Labour Cess, Royalty, Labour, Material & T&P.) |
| 7 | Painting or varnishing old wood iron work in smallareas or new wood with two coat (up to one sq. meter) of ready mixed priming paint and two coat of approved superior quality ready mix paint (2nd quality synthetic cnamel paint of approved brand such as British paint. Shalimar, Asian or equivalent supply of all materials, labour, T&P etc. required for proper completion of work. Paint to be used should confirm the I.S.I. No. 103-1950. as per S.I. No. 642+643 complete in all Aspects (Excluding G.S.T but Including All Taxes Labour Cess, Royalty, Labour, Material & T&P.) |
| 8 | Finishing walls with one coat of water proof cement paint of approved quality on previously old treated surface with this paint to give an even shade including supply of all material, labour and tools & plants etc. required for proper completion of the work. As per S.I. No .662 complete in all Aspects (Excluding G.S.T but Including All Taxes Labour Cess, Royalty, Labour, Material & T&P.) |
| 9 | Finishing walls with Premium Acrylic Smooth exterior paint with Silicon additives of required shade (Two or more coat applied @ 1.43 Ltr/10Sqm over and including base coat of water proofing cement paint applied @ 2.20kg/10sqm.) As per CPWD 13.47.1 complete in all Aspects (Excluding G.S.T but Including All Taxes Labour Cess, Royalty, Labour, Material & T&P.) |
| 10 | Construction of K.C. Drain and Shute Drain Excavation in Foundation in ordinary soil (Loamclay or sand) including lift up to 1.5m and lead up to 30m. and including filling, watering and ramming of excavated earth into the space between the building and sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the E/I up to a distance of 30m. from the foundation trenches including all T&P phowereh and basket etc. complete. . SI NO 251 complete in all Aspects (Excluding G.S.T but Including All Taxes Labour Cess, Royalty, Labour, Material & T&P.) |
| 11 | Cement Concrete with 4cm. gauge approved stone ballast, approved coarse sand and cement in the proportion of 6:3:1 including supply of all materials labour and tools and plants etc. required for proper completion for the work. SI NO 280 complete in all Aspects (Excluding G.S.T but Including All Taxes Labour Cess, Royalty, Labour, Material & T&P.) |
| 12 | Brick Masonry in 1:3 Cement Mortar As in Item 303 above but in 1:3 cement and sand of 1.25 fineness modulus mortar SI NO 306 complete in all Aspects (Excluding G.S.T but Including All Taxes Labour Cess, Royalty, Labour, Material & T&P.) |
| 13 | 12 mm. thick plaster with cement mortar consisting of 1 part cement and 3 part of approved coarse sand. Minimum thickness not to be less than 10 mm including supply of all materials, labours and T&P etc. required for proper completion of work. SI NO 583 complete in all Aspects (Excluding G.S.T but Including All Taxes Labour Cess, Royalty, Labour, Material & T&P.) |
| 14 | Class-150 brick work in 1:4 cement and coarse sand mortar SI NO 305 complete in all Aspects (Excluding G.S.T but Including All Taxes Labour Cess, Royalty, Labour, Material & T&P.) Please Enable Macros to View BoQ information |