| 1 | Dismantling wrought iron or mild steel work of any description not otherwiseprovided for etc complete all as specified and directed by Engr in Charge |
| 2 | Framed work such as grills, gratings, etc.. with ends of bars shouldered and/or riveted, or forged into spikes; framed guard bars; barred iron doors; ladders; framed balusters; walk ways; railings; framework of water tanks and similar work conforming to Fe.290.Gde-E-165 complete all as specified and directed. |
| 3 | Taking down cement plasteron brick or stone walls etc including raking out joints hacking for key scrubbing down with water etc complete all as specified and directed. |
| 4 | Material and labour for 15mm thick Plaster in CM 1:4 on fair faces of brick work or concrete surfaces,finished even & smooth without using extra cement mixed with WPCcompleteall as specified and as directedNote :- WPC will measured and paid seperately |
| 5 | Supply only ISI Marked integral water proofing compound complete all as specified and as directed. |
| 6 | M&L for preparation of new plastered surfaces of walls andapplying two or more coats with 100% premium acrylic emulsion paint having VOC content less than 50 gms/litre and UV resistance as per IS 15489:2004, alkalie and fungal resistance, dirt resistance, exterior paint of required shade with silicon additives @ 1.43L/10sqm over and including priming coat of exterior primer applied at 0.9L/10sqm complete all as specified and directed by Engr-in-Charge |
| 7 | Demolition of cement concrete of any description not otherwise specifically provided for complee all as specified and directed |
| 8 | Providing, cement concreteType B0 1:2:4 (12.5mm graded aggregate) as in lintels upto 1.5m clear span, cills, steps; seismic and other similar bands, plinth courses, string courses, lacing courses, parapets and railings upto 60 cm in height, copings, kneelers, apex stones, bed plates, kerbs not provided for in Item 04028, water troughs and the like including weathering, slightly rounded or chamfered angles and throating,completeall as specified and as directed. |
| 9 | M&L for cutting holes superficial area n exc 100 sqcm into or through out concrete slabs, columns etc without cutting reinforcement complete all as specified and directed |
| 10 | M&L for preparation of new or previously steel surfaces of any description exc 10cm width or girth not otherwise describedand applying two coats of synthetic enaml paint over a coat of red oxide primer complet all as specified and directed |
| 11 | M&L for complete removing existing treatment on steel surfaces of any description, over 10cm width or girth not otherwise described and applying two coats of synthetic enamel paint over a coat of red oxide primer complete all as specified and directed |
| 12 | M&L for 10mmthick plastering in CM 1:6on fair faces of bricks or concrete surfaces (internal surfaces) finished even and smooth w/o using extra cementcompleteall as specified and as directed. |
| 13 | M&L for Preparation of new surface of wall and applying two coat of oil emulsion distemper over a coat of primer over 3mm thick wall care putty on internal walls surfaces complete all as specified and directed. |
| 14 | M&L for 50 mm thick guniting in patches on to the required area on RCC/ PCC columns, beams, stairs, lintels, retaining walls, etc. of all sizes and shapes at all heights from existing ground floor and all locations with cement mortar 1:3 (1 cement : 3 sand) under 2 to 2.8 Kg/Cm2 pressure after removing the damaged loose spalt concrete portions by chipping, removal of dust and applying one coat of rust converter/kp- 100 equivalent grade over reinforcement wherever necessary providing and tying in position 75x75x10 g MS welded mesh or smaller size over treated surface ready to receive grouts, curing for 10 days etc, complete operation all as directed including labour charges hire for all tools and plant machineries cost of consumables, scaffolding all types of protective equipments, plant floors, pipelines, vessels, materials etc. so as to do guniting in plant, removing the debris etc. rebound materials etc. to low lying areas in the factory compound and leveling as directed, complete all as directed by GE.Note: (i) After placing the additional reinforcement all concrete surfaces shall be thoroughly scrubbed with brushes, washed with water and alloy to dry. To this surface apply chemistic polycrete admixture at the rate not less than 2% by weight of cement or as per manufacturer\"s insturctions.(ii) When polymix coating is in tackey condition guniting is done with polycrete admixture at the rate not less than 2% by weight of cement or as per manufacturer\"s instruction. Polycrete admixture shall be procured form Chemical Adhesive Pvt Ltd Co or their authorized dealer. (iii) Cost of the above aspects shall be deemed to be included in the quoted rate of the respective item and nothing extra shall be paid on any account. |
| 15 | Demolition of Stone slabs and tiles of any description or thickness in floors, aprons etc laid, beddedand pointed in any pointcompleteall as specified and as directed |
| 16 | Material and Labour for machine cut kota stone slab flooring, stair case, landings 20-25mm thick over cement screed bed base laid and jointed with grey cement slurry mixed with pigment to match the shade of the slab including rubbing and polishing and 15mm thick screed bed in CM 1:6completeall as specified and as directed. |
| 17 | Material and Labour for machine cut kota stone slab in riser of steps, skirting, dado20-25mm thick on vertical wall aurface over cement screed and jointed with grey cement slurry mixed with pigment to match the shade of the slab including rubbing and polishing complete with 10mm thick plastering in CM 1:4 complete all as specified and directed. |