|
| 1 | Repairs to pot holes any depth exceeding 30mm depth, area not exc 1sqm each including sweeping free from dust & mud or water scoring sunken surfaces in roads paths etc, cutting around edges to at least 25mm in depth making good by applyingtack coat withcutback bitumen@ 5kg/10 sqm putting in pre mixed bituminous macadam, well rammed and sealed with binder 9.8 kg/10 sqm, blinded with 0.09 cum of stone chipping ,6.3 mm size and again well rammed (including supply of premixed macadam binder and chippings) depth of pot holes exe 30 mmcomplete all as specified and directed by Engr-in-Charge |
| 2 | M&L for preparing black top surfaces by brushing with wire brushes for removing caked mud etc sweeping with brooms and finally faning the cleaned surface with gunny bags to remove all loose dirt etc and applying evenly a tack coat of bitumnous primer at 5 Kg per 10 Sqm using cutback bitumen VG - 10 complete all as specified and directed by Engr-in-Charge. |
| 3 | M&L for providingbituminious premix asphaltic semi dense concrete (30mm thick) consolidated thickness with 5.5% binder content by wight of total mix , with using paving bitumen VG-30 laid / spread uniformly by means of Mechanical pavers over primed black top surfaces, rolled and compacted to required camber and gradient complete with 8 to 12 tonne power roller complete all as specified and directed by Engineer-in-charge. |
| 4 | M&L for premix bituminous macadam laid/rolled and compacted to required gradient and camber and (consolidated thickness 75mm or less) using 4% paving bitumen by means of mechanical paver by weight or total mix complete all as specified and directed by Engr-in-Charge. |
| 5 | M&L for preparing bituminous surfaces of road and marking 2.5mm thick centre lines, stop lines, dashes, arrows etc. and the like n.exc 10cm wide on roads pavements with hot allied thermo plastic road marking paint of approved colour confirming to BS 3262-1989 with special applicator machine all as per manufacturers instruction incl taking down existing complete all as specified and directed by Engr-in-Charge. |
| 6 | Supply and fixing in repair cat eye solar reflective type of metal body alloy of size 100mm x 100mm x 20mm with PAMA striplens reflector of model No. DA 972.0 fixed with and incl MS stud of suitable size as per manufactures instructionsincl taking down existing complete all as specified and directed by Engr-in-Charge. |
| 7 | Supply and fixing in rep metal tubular dealineator made out of ABS round body fitted with 2 Nos 65 mm dia highly reflective reflectors made out of PMMA and mounted on 45/50 mm dia mild steel pipe of 600 mm height duly powder coated and thermo plastic elastomer 3 bands of green, red and yellow reflector radium tape of 25 mm wide strips with anti theft steel net for reflector protection including embedding in PCC 1:2:4 (150x150x300mm) type B1 incl taking down existing complete all as specified and directed by Engr-in-Charge. |
| 8 | Supply and fix in repair solar cat eye aluminum alloy shall (100% water proofing design according to 65) of size 125mm x 125mm x 25mm (shank 65mm) of high efficiency Mono rystafie solar panel 2.4V/ 0.3 watt one NI-ed rechargeable battery (1.2V/ 1600MA) consisting of super bright LED with 10,000 to 18,000 mcdcompleted as per manufactures instructions etc. incl taking down existing all as specified and directed by Engr-in-Charge. |
| 9 | M&L for Stone kerb (sand stone) of roughly squared stones of size 15cm x 30cm, all surfaces hammer dressed so that the maximum depression from a straight edge held against the dressed surface shall not exceed 20mm jointed in cement mortar 1:6 and struck flush incl necessary excavation, earth work, returning filling earth and including takingout old stone any type and removed from site complete all as specified and directed by Engr-in-Charge. |
| 10 | M&L for surface dressing n.exc 15cm deep, site clearance, to remove the bushes from site and making area worable etc all as specified and directed. |
| 11 | M&L for Moorum/red bajri,Spread,rolled and consolidated to gradient and camber required and complete all as specified and as directed by Engr-in-Charge. (Rate quoted by contractor deemed included removal of excess soil/Addition of soil as required). |