| 1 | Description |
| 2 | Hire charge of wheel (tyre) mounted excavator for removing the unwanted waste in and around wharf area and loading to tipper including cost of fuel, hire charges of the vehicle, etc. complete as directed by the engineer incharge. Note: The machinary will be utilized by the department to all the areas of conservancy Part A, B, C, D and Part E |
| 3 | Hire charge of small chain mounted Ex - 20 for removing the unwanted waste in small drains and around wharf area including cost of fuel, hire charges of the vehicle, etc. complete as directed by the engineer incharge. Note: The machine will be utilized by the department to all the areas of conservancy Part A, B, C, D and Part E |
| 4 | Hire charge ofchain mounted Hydraulic Excavator of 1.1 m3 bucket to remove the unwanted waste inand around wharf area including cost of fuel, hire charges of the vehicle, etc. complete as directed by the engineer incharge. Note: The machine will be utilized by the department to all the areas wherever required |
| 5 | Hire charge of Tipper for removing the unwanted waste in and around wharf area including cost of fuel, hire charges of the vehicle, etc. complete as directed by the engineer incharge. Note:- The Tipper will be utilized by the department to all the areas of conservancy Part A, B, C, D and Part E |
| 6 | Removal of carcase of animals in and arround wharf area such as cow, bull, buffallo, etc., conveying and burrying the dead animal at nearby vacant area after excavating suitable pit including cost and conveyance of all material, hire charge of equipment, T&P and all other incidental charges etc. complete as directed by the department. |
| 7 | Providingand laying900mm reinforcedcementconcretepipeNP2 for dust bins in wharf area including cost of materials, labour, HOM complete as per specifications, curing complete as per specifications and as per directions of Engineer-in-charge. |
| 8 | Finishing walls with water proofing cement paint of required shade :New work (Two coats applied @ 4.84 kg/10 m²) to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. |
| 9 | Printing new letter and figures of any shade with synthetic enamel paint (15 cms high and 10 cms width) with synthetic enamel paint black or any other approved colour to give an even shade complete as per specifications |
| 10 | KSRRB 200-1. Cutting of treesgirth from 300mmto 600mmincluding cuttingof trunks,branches and removal of stumpsroots stacking of serviceablematerials earth filling in the depressions / pit, labour charges complete as per specifications. MORTH specificationclause 201/ Chapter2 |
| 11 | KSRRB 200-2. Cutting of treesgirth from 600mmto 900mmincluding cuttingof trunks,branches and removal of stumpsroots stacking of serviceablematerials earth filling in the depressions / pit, labour charges complete as per specifications. MORTH specificationclause 201/ Chapter2 |
| 12 | KSRRB 200-3. Cutting of treesgirth from 900mmto 1800mmincluding cuttingof trunks,branches and removal of stumpsroots stacking of serviceablematerials earth filling in the depressions / pit, labour charges complete as per specifications.MORTH specificationclause 201/ Chapter2 |
| 13 | cutting of tree branches of size upto 300mm girth without damaging the building, structures, compound wall, fencing, electrical line, water supply etc.. all the branches should be cut into small pieces on the tree itself and descend the same mannualy by deploying sufficient number of labours, including cost of cuttingof trunks,branches and stacking of serviceablematerials,labour charges cutting machine charge, transportation charges, tools and plant and all other incidental charges etc. complete as per specifications and as per directions of Engineer-in-charge. |
| 14 | cutting of tree branches of size upto 300mm to 600mm girthwithout damaging the building, structures, compound wall, fencing, electrical line, water supply etc.. all the branches should be cut into small pieces on the tree itself and descend the same mannualy by deploying sufficient number of labours, including cost of cuttingof trunks,branches and stacking of serviceablematerials,labour charges cutting machine charge, transportation charges, tools and plant and all other incidental charges etc. complete as per specifications and as per directions of Engineer-in-charge. |
| 15 | cutting of tree branches of size upto 600mm to 900mm girthwithout damaging the building, structures, compound wall, fencing, electrical line, water supply etc.. all the branches should be cut into small pieces on the tree itself and descend the same mannualy by deploying sufficient number of labours, including cost of cuttingof trunks,branches and stacking of serviceablematerials,labour charges cutting machine charge, transportation charges, tools and plant and all other incidental charges etc. complete as per specifications and as per directions of Engineer-in-charge. |
| 16 | cutting of tree branches of size above 900mm girthwithout damaging the building, structures, compound wall, fencing, electrical line, water supply etc.. all the branches should be cut into small pieces on the tree itself and descend the same mannualy by deploying sufficient number of labours, including cost of cuttingof trunks,branches and stacking of serviceablematerials,labour charges cutting machine charge, transportation charges, tools and plant and all other incidental charges etc. complete as per specifications and as per directions of Engineer-in-charge. |