| 1 | Decentralized Material (Provided by Contractor) |
| 2 | Providing 6” dia.MS G.I. pipe 3m long (for XLPE Cable) |
| 3 | Cross arm clamp for PCC 9/STP 11 with bolts and nuts |
| 4 | F-bracket for 33 KV |
| 5 | Number Plate with clamp and Nut & Bolt |
| 6 | Danger Board with clamp and Nut & Bolt |
| 7 | G.I. Barbed Wire |
| 8 | Bolt, Nuts& washer all sizes |
| 9 | ‘E’ Bracket for 33 KV |
| 10 | 33kv Top Channel 125x65x6 mm, 3200 mm long with clamp |
| 11 | Dropperangle 100x50x2028 mm with clamp |
| 12 | PG Clamp for Dog Conductor |
| 13 | 33kv Bracing angle 65x65x6 mm-4300 mm with 4 clamp |
| 14 | Stone pad |
| 15 | Guarding Angle With 65x65x6 mm – 3600 mm |
| 16 | Guarding Angle clamp for STP 11/PCC 9 mtr. |
| 17 | Alluminium Paint |
| 18 | Red Oxide Paint |
| 19 | Earth wire clamp with nut & bolts |
| 20 | ERECTION OF WORK(Shifting, Loading Carriage & Unloading of following materials from store centre‘Azamgarh’ to work site) |
| 21 | 33 KV ‘XLPE’ Cable 3x300mm² |
| 22 | ST Pole 11 M Long |
| 23 | ACSR Dog Conductor |
| 24 | PCC Pole 9 Mtr Long |
| 25 | 33kv Disc insulator B&S type 70 KN |
| 26 | 33kv Disc fitting 70 KN |
| 27 | 33kv Pin insulator |
| 28 | 33kv V Type X-arm |
| 29 | Complete Stay (GI stay rod 20x1800 mm stay wire 7/8 SWG 10kg, stay clamp, bolts, nuts & washer with concrete grouting) |
| 30 | Earthing of pole by MS earthing rod of 20x2500 mm and 6 SWG earthing wire etc. |
| 31 | 33 kv 3x300 mm2 Cable Jointing kit Outdoor |
| 32 | G.I. Wire 4 mm for guarding |
| 33 | Making plinth foralready erected9mtr single PCC poles, grouting in the ratio 1:4:8 (cement, sand, 40mm brick ballast), back filling of earth, proper ramming & fitting of all accessories (‘V\" type cross arm 100 x 50 x 6 mm, clamps with bolts and nut, composite polymer pin insulators, danger board with clamp, barbed wire, earthing etc. complete in all respect, excludingerection work of 9 mtr single PCC pole&excavation of pit. |
| 34 | Erection work of 9 mtr single PCC pole& excavation of pit,making plinth for erected poles, grouting in the ratio 1:4:8 (cement, sand, 40mm brick ballast), back filling of earth, proper ramming & fitting of all accessories (‘V\" type cross arm 100 x 50 x 6 mm, clamps with bolts and nut, composite polymer pin insulators, danger board with clamp, barbed wire, earthing etc. complete in all respect. |
| 35 | Erection of Double pole structure on 9 Mtr PCC Pole including all works of excvation of pit, pole erection, making plinth for poles, grouting in the ratio 1:4:8 (cement, sand, 40 mm brick ballast), back filling of earth, proper ramming & fitting of all accessories (M.S. angle iron 65 x 65 x 6 mm bracing with clamps, top channel 125 x 65 x 3200 mm with clamps, danger board with clamp, barbed wire earthing, etc. complete). |
| 36 | Making plinth foralready erected 9 mtrPCC double pole, grouting in the ratio 1:4:8 (cement, sand, 40 mm brick ballast), back filling of earth, proper ramming & fitting of all accessories (M.S. angle iron 65 x 65 x 6 mm bracing with clamps, top channel 125 x 65 x 3200 mm with clamps, danger board with clamp, barbed wire earthing, etc. complete inallrespect excludingerection work of double pole structure of 9 mtr PCC Pole&excvation of pit. |
| 37 | Erection of Single pole structure on 11mtr ST Pole including all works of excvation of pit, pole erection, making plinth for poles 30 cm above, grouting in the ratio 1:4:8 (cement, sand, 40mm brick ballast), back filling of earth, proper ramming & fitting of all accessories (clamps with bolt and nut, Aluminium paint, red oxide paint etc. complete). . |
| 38 | Making plinth foralready erected 11 mtr STPsingle poles 30 cm above, grouting in the ratio 1:4:8 (cement, sand, 40mm brick ballast), back filling of earth, proper ramming & fitting of all accessories (clamps with bolt and nut, Aluminium paint, red oxide paint etc.) complete in all respect excluding erection work of single pole structure of 11mtr ST Poleexcvation of pit. |
| 39 | Erection of Double pole structure on 11MtrSTP Pole including all works of excvation of pit, pole erection, making plinth for poles, grouting in the ratio 1:4:8 (cement, sand, 40 mm brick ballast), back filling of earth, proper ramming & fitting of all accessories (M.S. angle iron 65 x 65 x 6 mm bracing with clamps, top channel 125 x 65 x 3200 mm with clamps, danger board with clamp, barbed wire earthing, etc. complete). |
| 40 | Erection of Four pole structure on 9mtrPCC Pole including all works of excvation of pit, pole erection, making plinth for poles 30 cm above, grouting in the ratio 1:4:8 (cement, sand, 40 mm brick ballast), back filling of earth, proper ramming & fitting of all accessories (M.S. angle iron 65 x 65 x 6 mm bracing with clamps, top channel 125 x 65 x 3200 mm with clamps, danger board with clamp, Aluminium paint, red oxide paint, barbed wire earthing, etc. complete) . |
| 41 | Erection of Double pole structure on 9mtrPCC Pole for One side O/H and One side Cable Rising including all works of excvation of pit, pole erection, making plinth for poles 30 cm above, grouting in the ratio 1:4:8 (cement, sand, 40 mm brick ballast), back filling of earth, proper ramming & fitting of all accessories (M.S. angle iron 65 x 65 x 6 mm bracing with clamps, top channel 125 x 65 x 3200 mm with clamps, danger board with clamp, barbed wire earthing, etc. complete) . |
| 42 | Grouting of stay rods (20 x 1800) mm including all work of excavation, cement concrete in size (0.60 x 0.60 x 0.30) m in ratio 1:4:8 cement, sand, 40mm brick ballast) as per drg including back filling, proper ramming etc. Fixing tightening &nozzling of stay wire with stay rod with the poles of required tension. |
| 43 | Guarding between two poles like single poles, double poles, four poles, etc. to guard LT, 11 KV Line telephone and river crossing, road crossing etc. with G.I. wire no. 6 SWG and G.I. wire no. 8 SWG, cutting, fabrication and fixing of guarding channel 75 x 40 x 3010 mm with clamps nut & bolts etc. |
| 44 | Laying of 33KV, 3x300Sq.mm, XLPE Cable with HDD (trenchless) method. |
| 45 | Concreting of pole (0.268 cu.m. each) |
| 46 | Charge of 33 kv 3x300 mm²Jointig kit Outdoor |
| 47 | Labour charges for inserting of MS G.I. Pipe, Rising of 33 KV cable,looping work of 33KV XLPE Cable and jumpering complete work. |
| 48 | Tree Cutting Compensation |
| 49 | Laying, spreading, lifting and final sagging of 3 phases of ACSR Dog conductor in accordance with profile and sag chart including binding, Jumpering and fixing of P.G. Clamp as per requirement in 03 Nos. conductor in parallel. Please Enable Macros to View BoQ information |