| 1 | Specification & Quantity for Carring Out the different Electricity Line Works, For Running E-Nivida under VIP ,Emergency work, Accidental repair work M&R/R&R Scheme in the jurisdiction of EDD-Dibai. |
| 2 | Carrige of S.T. Pole 11 Mtrs. Long/ PCC Pole. 8.5 Mtrs. Long / 9 Mtrs PCC/9 Mtrs STP |
| 3 | Carriage of line accessories, ACSR CONDUCTOR / AB CABLE D/P accessories as cross arm M.S. channel, Angle, 11 KV Dise insulator with fitting 11 KV pin insulator with pin etc. |
| 4 | Erection & fabrication of following supports including fitting of all required accessories of H.T/L.T line as per RESPO schedule. All type of M.S. clamps nuts bolts stone pads ets. Required for the above work shall be provided by the contractor at his own cost. |
| 5 | Erection of 11 Mtrs. STP/8.5 Mtrs. PCC pole . |
| 6 | Fixing erection & grouting of stay set complete with binding & Nozzling of stay wire. |
| 7 | Earthing of supports with the help of Earthing rod & GI wire/earth wire. |
| 8 | Laying stringing & sagging of WEASEL conductor including opening and reconnection of consumer cable ,binding ,Jumphering including carriage loading & unloading the same from central store BSR J.E store to site of work. |
| 9 | Laying stringing & sagging of DOG conductor including opening and reconnection of consumer cable ,binding ,Jumphering including carriage loading & unloading the same from central store BSR J.E store to site of work. |
| 10 | Providing and fixing of the following material by the material as per RESPO Drawing. |
| 11 | PROVIDING AND FIXING LT Pin Clamps ( Flat Size 50*6 mm) |
| 12 | PROVINDING AND FIXING Stay insulator of size 100x115mm. |
| 13 | PROVINDING AND FIXING Stay Clamps ( Flat Size 50*6 mm) |
| 14 | PROVINDING AND FIXING earthing Clamps ( Flat Size 50*6 mm) |
| 15 | PROVINDING AND FIXING Corss Arm Holding Clamps |
| 16 | PROVINDING AND FIXING F Clamps |
| 17 | PROVIDING AND FIXING Nut & Bolt of off Size |
| 18 | DISMENTLING OF POLE PCC/STP OFF SIZE |
| 19 | Extra Milage charges and carriage from PCC/ST Pole & other material from each 10 Km. |
| 20 | Above work shall be done as per UPPCL/RESPO Rules. Please Enable Macros to View BoQ information |