| 1 | Safe loading, carriage including unloading and proper stacking of following materials from Central Store Barabanki Store to site of work. |
| 2 | PCC Pole 8.5 meter |
| 3 | MS Dropper Channel |
| 4 | MS Top Channel |
| 5 | MS Angle Iron 65x65x6mm Bracing with 4 Clamp |
| 6 | T-off Channel |
| 7 | 11 KV XLPE CABLE 3X300 SQ MMM |
| 8 | 11 KV VCB IC CTR O/G 200/100/5 350 MVA (1250 AMP) |
| 9 | 11 KV JOINTING KIT 3X300 SQ MM Indoor XLPE Cable |
| 10 | 11 KV JOINTING KIT 3X300 SQ MM Outdoor XLPE Cable |
| 11 | 11 KV XLPE CABLE 3X185 SQ MM |
| 12 | 11 KV Pin Insulator with Pin & Nut |
| 13 | 11 KV JOINTING KIT 3X185 SQ MM OUT DOOR/INDOOR |
| 14 | 11 KV JOINTING KIT 3X185 SQ MM STRAIGHT THROUGHT |
| 15 | MS Angle S/S Base |
| 16 | 11 kv Pilfer Resistant Metering Cubical without Cable Termination Kit 125/5 |
| 17 | Electric TVM 11kv/Meter |
| 18 | Earthing Complete |
| 19 | GI Wire |
| 20 | Stay Set(16x1800 mm) |
| 21 | Dragging of pole from Store to site |
| 22 | Grouting of Pole |
| 23 | Erection and installation of 33/11KV 10 MVA T/F in a levelled position of the plinth. The work includes shifting of T/F to the site & installation within the S/S premises, assembling, fixing and fitting of all accessories with required packing and filling of T/F oil upto desired level. Ensuring that there is no leakage and all jumpering & connection & testing are included in the scope of work & at the time of T/F installation,damage plinth of T/F should be maintained by contractor. |
| 24 | Fabrication and grouting (1:4:8) of MS Channel 100x50mm in L Shape & in proper size and alignment to provide support through Gl earthing strips (50x6)mm size for power transformer neutral including supply & fixing of flexible copper bonds for neutral earthing as per RESPO Drg. 13.00 (All decentralised materials to be provided by Contractor). |
| 25 | Providing & Fixing of Single Core PVC Cable, 1x400/630 sq.mm. & fixing between Transformer 17.00 incoming 3x300 Sq.mm XLPE Cable and Transformer 11 KV/LV Side Bushing connector for reducing of tension at LV Side Bushing. |
| 26 | Erection of Stay set of 16x1800 mm rod duly painted with red oxide,anchor plate, thumble turn buckle and stay insulate etc. digging of pit of size of size 0.4x0.6x1.6 m for grouting 1:3:6 cement concrete, with stay of size 7/8 SWG, nuzzling & Grouting. |
| 27 | Errection of Substation type double pole with PCC including mounting of Top Channal Dropper Channel, base angle with clamps with nut & bolt 33/11 KV line including grouting of support and plinthing 300 mm above ground level, fitting of 33/11 KV pin & Pin insulator. 1/6 of total lenght of poles will remain under the ground and planted on stone pad of Size 300x300x75 MM. |
| 28 | Earthing of pole with MS Earthing. |
| 29 | Installation of11 KV VCB IC CTR O/G 200/100/5 350 MVA (1250 AMP) |
| 30 | Fixing of 11 KV JOINTING KIT 3X185 SQ MM OUT DOOR/INDOOR |
| 31 | Fixing of 11 KV JOINTING KIT 3X300 SQ MM INDOOR |
| 32 | Fixing of 11 KV JOINTING KIT 3X300 SQ MM OUT DOOR |
| 33 | Fixing of JOINTING KIT 3X185 SQ MM STRAIGHT THROUGHT |
| 34 | Laying of XLPE CABLE 3X185 & 3x300 SQ MM by Drill Method (XLPE Cable will be provided by the department) |
| 35 | Provinding & Fixing of various type materials. All materials shall be supplied by the contractor. |
| 36 | Clamp for Top/T-off Dropper |
| 37 | Barbed Wire |
| 38 | Danger Board with Clamp & Nut Bolt |
| 39 | 11 kv Fuse Set Complete with MS Channel Clamp & Nut Bolt |
| 40 | MS Angle for Holding Double Pole Metering Box |
| 41 | Nut & Bolt |
| 42 | GI Pipe 6\" |
| 43 | Supply & Laying of 6x2.5 sq.mm. Sq. control cable from power T/F to controle board in the ground as per RESPO Norm with proper connection VCB, CT & Control Pannel with T/F to battery and battrey charger, Bucholz Relay, low higher and winding temperture protection alarm etc with including all the civil material. (All the material will be supplied by the contractor) |
| 44 | Supply & Laying of 4x2.5 sq.mm. Sq. control cable from power T/F to controle board in the ground as per RESPO Norm with proper connection VCB, CT & Control Pannel with T/F to battery and battrey charger, Bucholz Relay, low higher and winding temperture protection alarm etc with including all the civil material. (All the material will be supplied by the contractor) Supply & Laying of 2x2.5 sq.mm. Sq. control cable from power T/F to controle board in the ground as per RESPO Norm with proper connection VCB, CT & Control Pannel with T/F to battery and battrey chargèr, Bucholz Relay, low higher and winding temperture protection alarm etc with including all the civil material. (All the material will be supplied by the contractor) |
| 45 | Supply & Laying of 2x2.5 sq.mm. Sq. control cable from power T/F to controle board in the ground as per RESPO Norm with proper connection VCB, CT & Control Pannel with T/F to battery and battrey chargèr, Bucholz Relay, low higher and winding temperture protection alarm etc with including all the civil material. (All the material will be supplied by the contractor) |
| 46 | Providing of Rubber matting one side chequered and other side plane size 1900x800x12 mm |
| 47 | providing of Hand gloves As per IS 4770 and tested potential 33 Kv. |
| 48 | Painting of All Switchyard Sub Station Structures (Old+New+fencing) with one coat of ready mixed primer and 2 coats of AL.Paint of good quality including cost of material, Labour and T&P complete in all respect. |
| 49 | Construction of control cable trench of 200 mm wide and 300 mm deep with MS strip at a distance of 1mtr. With brick work 1:4:8 in foundation 12 mm thick plaster of 1:4 cement coarse sand for finishing along with MS strip. (All the material will be supplied by the contractor) |
| 50 | Construction of trench cover of 600 mm long and 75 mm thick for cable trench Including cost of material, labour and T&P. (All the material will be supplied by the contractor) |
| 51 | Hosting of 11 KV Cable on existing/erected support with provision of MS Pipe 150 mm dia 3 mtr long suitable for 3x185 sq mm cable fixing of proper support and its clamping ,providing long barral lugs 6 nos and P.G. Clamps & \"Y shape jumpering properly and 02 nos. supporting angle 65X65X6, 2800 mm as per RESSPO Norms. (All material will be supplied by the contractor like MS Pipe, P.G. Clamps, Al. Lug And Supporting Angle 65X65X6, 2800 mm). |
| 52 | Commissioning of 10 MVA T/F and its equipments installed in Switchyards and 11 kv incoming and outgoing panels complete in all respect upto energising. |
| 53 | Dismantling & safe shifting of existing & working 33/11 KV 05 MVA T/F from plinth to suitable storage place after opening jumper and cable connections as per instruction of Site Engineer. Please Enable Macros to View BoQ information |