|
| 1 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement 4 coarse sand (zone-III) derived fromnafural sources 8 graded stone adgregate 40 mm nominalsize derived from natural sources) (DSR 2023/4 1.8) |
| 2 | Mild steel or iron in plain work shch as reinforced concrete or reinforced brick work(when not included in overall rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel and wastage hooks and overlapping. SI-504 |
| 3 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:, 1:1.5:3 (1 cement: 1.5 coarse sand (zone-III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources) DSR 2023-5.1.2 |
| 4 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in:, Cement mortar 1:4 (1 cement: 4 coarse sand) DSR 2023-6.4.1 |
| 5 | 12 mm cement plaster of mix:, 1:4 (1 cement: 4 coarse sand) DSR 2023-13.4.1 |
| 6 | Providing and applying white cement based putty of average thickness 1mm of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. DSR 2023-13.80 |
| 7 | Finishing walls with premium acrylic smooth exterior paint with Silicone additives of required shade new work (Two or more coats applied @1.43lte/10 sqm over and including priming coat of exterior primer applied @2.20 kg/10sqm) (apex Ultima, Weather coat all guard) asian, berger DSR. 2023-13.47.1 |
| 8 | Construction of granular sub-base by providing well graded material spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotavator at OMC and compacting with smooth wheel roller to achieve the desired density complete as per technical specification clause-401 |
| 9 | Providing and laying factory made chamfered edge Cement Concrete paver blocks In foot path, park & lawns driveway or light & traffic parking etc. of required strength, thickness & size/shape, made by table vibratory method using PU mould, laid in required colour & pattern over 50mm thick compacted bed of course sand, compacting and proper embedding/ laying of inter locking paver blocks into the sand bedding layer through vibratory compaction by using plate vibrator, filling the joints with sand and cutting of paver blocks as per required size and pattern, finishing and sweeping extra sand, all complete as per manufacturer\"s specifications & direction of Engineer in-Charge., 80mm thick Cement concrete paver block of M-30 grade with approved colour, design & pattern. DSR 2023-16.91.2 |
| 10 | Providing and laying spreading and compacting graded stone aggregate to wet mix macadam (WMM) specification including premixing the material with water at OMC in machanical mix plant carrige of mixed material by tipper to site, laying in uniform layiers with paver in sub-base / base course one well prepared surface and compacting with vibratory roller to achieve the desired density. (Sanction Rate) |
| 11 | Providing and applying primer coat with bitumen emulsion (slowe setting) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means. (Sanction Rate) |
| 12 | Providing and applying tack coat with bitumen (Vg-10) pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom.Both wheeled Roller 8 - 10 tonne capecity, finished to required level and grades. (Sanction Rate) |
| 13 | Providing and laying bituminous macadam (B.M.) with 100-120 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with bituminous binder @3.30%, transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction (Sanction Rate) |
| 14 | 25 mm thick Semi-Dense Bituminous Concrete (S.D.B.C.) (Using Water Plastic) providing and laying Semi-Dense Bituminous Concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5 per cent mix to work at site as per MORTH & H specification clause No. 508 complete in all respects(Reducing Bituminous Quantity by 8% and replacing it by Plastic wastage as per IRC : SP: 98-2013) (Sanction Rate) Please Enable Macros to View BoQ information |