|
| 1 | Material |
| 2 | Dead End Clamp with I hook AB Cable SP-21 |
| 3 | MS Half Clamp for LT Distribution Box SP-21 with N&B |
| 4 | Holding Clamp J-I Hook for AB Cable |
| 5 | Nut & Bolts |
| 6 | Stay Clamp for SP-21 with N&B |
| 7 | PP and Clamp for SP-21 without N&B |
| 8 | Suspention Clamp with I Hook AB Cable SP-21 |
| 9 | Mid Jointing Sleeve 25mm |
| 10 | 11 KV Fuse set |
| 11 | MS Half Clamp for LT Distribution Box SP-23/33 with N&B |
| 12 | LT bare Neutral connector PG clamp for Distribution Box 25-25 sq.mm |
| 13 | LT bare Neutral connector PG clamp for Distribution Box 50-50 sq.mm |
| 14 | Chemical Earthing |
| 15 | IPC 70/35 sq.mm for line to line tapping |
| 16 | IPC 70 sq.mm to 25 sq.mm for Distribution Box |
| 17 | Head Shrink type end caps for LT AB Cable |
| 18 | 1 Phase LT Distribution Box, inbuilt panel lock |
| 19 | 3 Phase LT Distribution Box, inbuilt panel lock |
| 20 | LT XLPE Cable 1x16 sq.mm insulated for Distribution Box |
| 21 | LT XLPE Cable 1x50 sq.mm |
| 22 | LT XLPE AB Cable 3X35 +1X25 Sq.mm. |
| 23 | LT XLPE AB Cable 1X35 +1X25 Sq.mm. |
| 24 | MCCB for 100 KVA T/F 200A 35 K with Box |
| 25 | Crimping Type Al. lug (25-100) sq.mm |
| 26 | Aluminium lug 25 sq.mm |
| 27 | Labour |
| 28 | Chemical Earthing |
| 29 | Erection of LT stay set |
| 30 | Erection of Single SP-10 Pole |
| 31 | Erection of Single SP-21Pole |
| 32 | Cartage of following material from store center Kotdwar to road site different road site with loading unloading and proper stocking at both end. Dist. 151-200 Km. Aprox. |
| 33 | ST Pole SP- 10 |
| 34 | ST Pole SP-21/23 |
| 35 | Misc line Material. |
| 36 | Head Load cartage of following material from road site to work site. Dist.- 1-3 Km. Aprox. |
| 37 | ST Pole SP-10 |
| 38 | ST Pole SP-21/23 |
| 39 | Disconnection & Reconnectio of Service Cable |
| 40 | Laying of LT Ab Cable 3X35+1X25 Sq.mm. |
| 41 | Installation of LT DB 1 PH &3 Ph for LT AB Cable |
| 42 | Straightning of Tilted existing LT Pole |
| 43 | Laying and Fixing of LT XLPE cable |
| 44 | Installation of MCCB with Box at DTRs |
| 45 | Dismantling of LT XLPE/PVC Cable |
| 46 | Laying and Fixing of 1x35 sq.mm XLPE Cable |
| 47 | Back Head Load Cartage of Petty Material 1-3 Km |
| 48 | Head Load cartage of LT AB Cable 3x35+1x25 sq.mm |
| 49 | Head Load cartage of LT AB Cable 1x35+1x25 sq.mm |
| 50 | Installation of 50 sq.mm LT Al. Lugs |
| 51 | Dismantling of LT XLPE Cable ICx16+25 |
| 52 | Supply and Fixing 1 Phase LT Distribution Box |
| 53 | Fixing of D-class heavy duty GI Clamp |
| 54 | Fixing of 11 KV Fuse set |
| 55 | Lopping and Chopping of Tree branches |
| 56 | Retighting of Top plate N&B etc Fixing of Aluminium Lugs Please Enable Macros to View BoQ information |