| 1 | Material |
| 2 | PG clamps 70-70 sq.mm |
| 3 | PG clamp 25 to 25 sq.mm line to line |
| 4 | Stay clamps SP-21 with Nut & Bolt. |
| 5 | L.T Insulated Suspention Clamp with I-Hook |
| 6 | MS Clamp with N&B for Distribution Box |
| 7 | Dead end clamp with I hook |
| 8 | Stay Insulator |
| 9 | L.T Insulated Piercing Connector 25-25 Sqmm |
| 10 | L.T Insulated Piercing Connector 16-16 Sqmm |
| 11 | I phase LT Distribution Box, inbuilt panel lock |
| 12 | L.T Insulated Piercing Connector 70-70 Sqmm |
| 13 | LT XLPE cable 1x50 sq.mm |
| 14 | LT Distribution Box 3 phase |
| 15 | Aluminium Lugs 50Sqmm for LT Distribution box Connection |
| 16 | Labour |
| 17 | Erection of Earthing Rod |
| 18 | Excavation of pit for stay set |
| 19 | Erection of LT stay set |
| 20 | Excavation of pit for pole |
| 21 | Erection of single SP-21 pole |
| 22 | Grouting of Pole |
| 23 | Cartage of following material from store centre Kotdwar to work road side including loading and unloading at both ends.Distance 151-200 km. |
| 24 | S.T Pole S.P 21/23 |
| 25 | Small Line Material |
| 26 | Head load cartage of Following stock Material from road side to work site including proper Stacking. Dist about 1-3Km. |
| 27 | S.T Pole S.P 21/23 |
| 28 | Small Line Material |
| 29 | Remove the service connection of consumer & Re-conneceted After fixing AB cable. Complete. |
| 30 | Errection of L.T Distribution Box on the Poles including making incomming & out going connections. |
| 31 | Laying of LT XLPE AB cable 3x95+1x70 sq.mm |
| 32 | Laying of LT XLPE AB cable 3x25+25 sq.mm |
| 33 | Laying of AB cable 1x16+25 sq.mm |
| 34 | Back cartage of scrap materials from different road site to Store centre Distance about 151-200 km. |
| 35 | Fixing of MS clamp |
| 36 | Fixing of Dead End clamp |
| 37 | Fixing of Suspension clamp with I hook |
| 38 | Realignment of Tilted pole |
| 39 | Back head load cartage of scrap materials from different work site to road sideDistance about 1-3km. |
| 40 | Fixing of 1x50 sq.mm XLPE cable |
| 41 | Installation of 50 sq.mm LT Al lugs |
| 42 | Dismantling of LT line 1 Phase 2 wire |
| 43 | Lpping and chopping of tree branches Fixing of Aluminium Lugs Please Enable Macros to View BoQ information |