| 1 | dk;ZA |
| 2 | Safe carriage of the following material from Store Centre to work site including loading and unloading at both ends as per RESPO norms (in juridiction of circle) :- 13 Mtr. Long ST Poles. |
| 3 | 11 Mtr. PCC/ST Poles. |
| 4 | 09 Mtr. PCC Poles. |
| 5 | 8.5 Mtr. Long PCC Poles. |
| 6 | ACSR Weasel Conductor. |
| 7 | ACSR Rabbit Conductor. |
| 8 | ACSR Dog Conductor. |
| 9 | LT AB Cable (1×25+1×16)sq.mm |
| 10 | LT AB Cable (3×50+1×35+1×16)s sq.mm |
| 11 | LT AB Cable (3×95+1×70+1×16) sq.mm |
| 12 | LT AB Cable (3×120+1×95+1×16) sq.mm |
| 13 | T/F 11/2.5 kV, 10 kVA Single Phase |
| 14 | T/F 11/0.4 kV, 16 kVA |
| 15 | T/F 11/0.4 kV, 25 kVA |
| 16 | T/F 11/0.4 kV, 63 kVA |
| 17 | T/F 11/0.4 kV, 100 kVA |
| 18 | T/F 11/0.4 kV, 250 kVA |
| 19 | LT XLPE Cable AL. 3.5x50 sq.mm |
| 20 | LT XLPE Cable AL. 3.5x70 sq.mm |
| 21 | LT XLPE Cable AL. 3.5x150 sq.mm |
| 22 | LT XLPE Cable AL. 1x120 sq.mm |
| 23 | LT XLPE Cable AL. 1x240 sq.mm |
| 24 | LT XLPE Cable AL. 1x400 sq.mm |
| 25 | 11 kV XLPE Cable AL. 3x70 sq.mm |
| 26 | 11 kV XLPE Cable AL. 3x120 sq.mm |
| 27 | 11 kV XLPE Cable AL. 3x185 sq.mm |
| 28 | 11 kV XLPE Cable AL. 3x300 sq.mm |
| 29 | 33 kV XLPE Cable AL. 3x300 sq.mm |
| 30 | 33/11 K.V Line material such as Cross-Arms, Pin Insulators with pin, Guarding Angles, Guarding Wire, Disc Insulators with fittings, stay set, stay wire, G.I wire, Earthing rod, Fuse set, M.s angle, M.s channel etc. |
| 31 | 1-ϕ & 3 ϕ distribution box |
| 32 | Lighting arrester, |
| 33 | Various Type Cable Jointing Kits (Indoor &outdoor ) straight through. |
| 34 | 11 kV Pilfer Resistant Metering Cubicle |
| 35 | 11 kV CT/PT Metering Pole Mounted Unit |
| 36 | 11 kV VCB I/C CTR 600/300/5A, 350 MVA, 24 Volt (1250 Amp.) |
| 37 | 11 kV VCB For O/G CTR 200/100/5A 350 MVA (1250 Amp.) |
| 38 | 11 kV TPMO with Polymer Insulator |
| 39 | Dismantling/removing of the line by contractor and Safe carriage of the material from work Site to store including loading and unloading at both ends as per RESPO norms :-AB cable, XLPE cable.from all phases on line, making bundle and stacking at a safe place, |
| 40 | ACSR conductor from all phases on line, making bundle and stacking at a safe place, |
| 41 | ST Poles with all accecories. |
| 42 | PCC Poles with all accecories. |
| 43 | 11 KV CT/PT Unit |
| 44 | 11 KV Metering cubical |
| 45 | Old and used Damaged TF 10/25/63/100 KVA |
| 46 | Old and used Damaged TF 250 |
| 47 | Construction of 11 KV Underground/ Over head Line as per RESPO norms :-Digging of cable trench in size of 0.45Mtr.x1.05 Mtr. |
| 48 | Laying of 33 KV 3x70/120/185/300 sq.mm. cable in the trench. |
| 49 | Laying of 11 KV 3x70/120/185/300 sq.mm. cable in the trench. |
| 50 | Providing 150 mm. sand cushion beneath and 150 mm. above the cable. The cable shall be duly protected by 1st Class Bricks, two on either side and third on top of the cable, laid in the series one after the other. |
| 51 | Digging and laying 33/11 KV various type XLPE cable trench less. |
| 52 | Fixing of Danger Board with clamp, nut and bolts. |
| 53 | Fixing of Number Plate with clamp, nut and bolts. |
| 54 | Wrapping of barbed wire on 11 KV PCC Poles at a height of 2.75 Mtr. from the ground level as per RESPO Norms. |
| 55 | Fitting of 11 KV Pilfer proof metering cubical including making proper connections. |
| 56 | Guarding of 33/11 KV Line with G.I. wire as per RESPO Norms. |
| 57 | Fixing of 11 KV Fuse Set as per RESPO Norms. |
| 58 | Fixing of TPMO. |
| 59 | Mounting and fixing of 11 KV CT/PT Unit on double pole including making proper connections. |
| 60 | Mounting and fixing of 10 KVA transformer on pole including making proper connections. |
| 61 | Mounting and fixing of 25/63/100 KVA transformer on double pole including making proper connections HT/ LT side. |
| 62 | Installation of 250 KVA transformer on plinth including making proper connections HT/ LT side. |
| 63 | Making Plinth for 250/400 KVA transformer. |
| 64 | Fancing of Plinth. |
| 65 | Water level earthing with all accessories. |
| 66 | Fixing of Tell less single circuit unit and making proper connections with all accessories. |
| 67 | Fixing of Tell less Double circuit unit and making proper connections with all accessories. |
| 68 | Fixing of Tell less Triple circuit unit and making proper connections with all accessories. |
| 69 | Fixing of LT Fuse Set/Box with fuse wire and fixing of MS Clamp, Nuts and Bolts and making proper connections with all accessories. |
| 70 | G.I. Pipe 6” dia for inserting 11 KV XLPE cable for safety of cable on Single/Double Pole by providing and fixing of MS Clamp, Nuts and Bolts. |
| 71 | Fixing and fitting of single/three phase distribution box on pole for making consumers cable connection complete work. |
| 72 | fixing of HDPE Pipe MS Clamp, Nuts and Bolts. |
| 73 | Aluminum/Red oxide Paint for Pole and fancing. |
| 74 | For 33/11 KV/LT Line, Excavation of foundation pit in size of 75x45 cm. having depth of 1/6th of the full length of the support (pole), providing and laying of stone pad (300x300x75mm.) in the bottom of the pit. Erection of single pole support complete with fixing of 11 KV V-Type cross-arms, earthing rod and all other accessories by providing stone pad, holding clamps, f-bracket and nuts & bolts etc. Single support 8.5 Mtr. long PCC Poles :- |
| 75 | 9 Mtr. long PCC Poles :- |
| 76 | 11 Mtr. long PCC Poles :- |
| 77 | 09 Mtr. long ST Poles :- |
| 78 | 11 Mtr. long ST Poles :- |
| 79 | 13 Mtr. long ST Poles :- |
| 80 | For 33/11 KV Line, Excavation of foundation pit in size of 75x45 cm. having depth of 1/6th of the full length of the support (pole). Erection of support (pole) complete work by fixing of D.P. Clamps and all other accessories. The work includes fabrication work and fixing of cross bracing sets, earthing rod, cutting holes etc. Double/section Pole structure with 8.5 Mtr. long PCC Poles :- |
| 81 | 9 Mtr. long PCC Poles :- |
| 82 | 11 Mtr. long PCC Poles :- |
| 83 | 09 Mtr. long ST Poles :- |
| 84 | 11 Mtr. long ST Poles :- |
| 85 | 13 Mtr. long ST Poles :- |
| 86 | For 33/11 KV Line, Excavation of foundation pit in size of 75x45 cm. having depth of 1/6th of the full length of the support (pole). Erection of support (pole) complete work by fixing of D.P. Clamps and all other accessories. The work includes fabrication work and fixing of cross bracing sets, earthing rod, cutting holes etc. Tri Pole structure with 9 Mtr. long PCC Poles :- |
| 87 | 11 Mtr. long PCC Poles :- |
| 88 | 09 Mtr. long ST Poles :- |
| 89 | 11 Mtr. long ST Poles :- |
| 90 | 13 Mtr. long ST Poles :- |
| 91 | For 33/11 KV Line, Excavation of foundation pit in size of 75x45 cm. having depth of 1/6th of the full length of the support (pole). Erection of support (pole) complete work by fixing of D.P. Clamps and all other accessories. The work includes fabrication work and fixing of cross bracing sets, earthing rod, cutting holes etc. Four Pole structure with 9 Mtr. long PCC Poles :- :- |
| 92 | 11 Mtr. long PCC Poles :- |
| 93 | 09 Mtr. long ST Poles :- |
| 94 | 11 Mtr. long ST Poles :- |
| 95 | 13 Mtr. long ST Poles :- |
| 96 | Grouting of support in CC 1:4:6 (cement, sand and 40 mm. brick ballast) Grouting will be done in the block of size 45cm x 45cm x 1/6th of full length of the support upto ground level as per RESPO Norms. |
| 97 | Grouting of stay rods (20x1800mm.) including all works of excavation, cement concrete in size of (0.60x0.60x0.30)M in the ratio of 1:4:6 (cement, sand and 40 mm. brick ballast) including back filling of soil and proper ramming etc. |
| 98 | Cutting branches of trees |
| 99 | Filling of 33/11 kv cable jointing kit. |
| 100 | Matarials to be provided by contractor of 11 KV Underground/ Over head Line as per RESPO norms :-Stone Pad 300x300x75 mm |
| 101 | LT Incoming Panel with metering equipment & fixing arrangement |
| 102 | Cross Arm holding Clamps with bolts & nuts |
| 103 | Single/Three phase Distribution Box clamp |
| 104 | Holding clamps for top channel TPMO, fuse set, Double pole, L.T Clamp, stay rod clamp etc. |
| 105 | Suspension Clamp |
| 106 | Dead-End Clamp |
| 107 | Eye-Hook |
| 108 | J-Hook |
| 109 | Copper L-Piece 50x225x10 mm |
| 110 | Copper L-Piece 62x225x12 mm |
| 111 | F-bracket for 11 kV line |
| 112 | E Bracket with bolts & nuts |
| 113 | Barbed wire GI |
| 114 | LT PVC Cable 3.5x70/35 sq mm |
| 115 | LT PVC Cable 3.5x150/70 sq mm |
| 116 | LT Shackle insulator 100x115 mm |
| 117 | Bolts & Nuts for Shackle insulator |
| 118 | Danger Board with clamps |
| 119 | Number Plate with clamps |
| 120 | Aluminium Paint |
| 121 | Red oxide paint |
| 122 | Tell less single circuit unit with all accessories. |
| 123 | Tell less Double circuit unit with all accessories. |
| 124 | Tell less Triple circuit unit with all accessories. |
| 125 | LT Fuse set with all accecesories |
| 126 | HDPE PIPE |
| 127 | GI PIPE 6\" |
| 128 | ALL LUGS. |
| 129 | Stay insulator |
| 130 | Nut and bolts Please Enable Macros to View BoQ information |