| 1 | Pipeline, Valve, Drain, Vent, Insulation & Allied Works |
| 2 | Supply, fabrication, and erection of 150 NB C-Class MS pipeline, including cutting/removal of old pipeline, re-installation with necessary accessories (of Spine terrace area). |
| 3 | Removal and supply of 100 NB C-Class MS pipe set, including Butterfly Valve, Elbow, Bend, Flange, and all necessary accessories (of Cooling Tower area). |
| 4 | Supply, fabrication, and installation of 40 NB GI C-Class pipe with one side threaded and the other side flanged along with all necessary accessories (of Cooling Tower area). |
| 5 | Supply, fabrication, and installation of 250 NB MS pipe replacement for the Cooling Tower Area. |
| 6 | BCG Side: Supply, fabrication, and installation of new pipe line of size 65 NB and length 4meter including65 NB Drain Valve (01no.)and 50NB drain for main header (01no.)all inclusive of flanges and necessary accessories for complete commissioning. |
| 7 | MBB Side: Supply, fabrication, and installation of new pipe line of size 150 NB and length 6meter including150 NB Butterfly Valve (02nos)all inclusive of flanges and necessary accessories for complete commissioning. |
| 8 | Removal, supply, fabrication, and installation of50 NB along with pipe of approximate 500mm length, 50 NB Ball Valve (01no.) all inclusive of flanges and necessary accessories for complete commissioning. (of Cooling Tower area). |
| 9 | Supply, Installation, Testing & Commissioningof ½” Air Vent and Flange with all necessary accessories. |
| 10 | Supply, fabrication, and installation of the Potable Water Pipeline, including a 40 NB Ball Valveinclusive of flanges and necessary accessories for complete commissioning. |
| 11 | Supply, fabrication, and installation of the Potable Water Pipeline, including a 25 NB Ball Valveinclusive of flanges and necessary accessories for complete commissioning. |
| 12 | Replacement work of Process Pipe- drain line of size 50 NB along with pipe of approximate 500mm length, 50 NB Ball Valve (01no.) all inclusive of flanges and necessary accessories for complete commissioning.(of Cooling Tower Area) |
| 13 | Replacement work of Chiller main header drain valve of size 50 NB along with pipe of approximate 500mm length,50 NB Ball Valve (02nos) all inclusive of flanges and necessary accessories for complete commissioning. (of Utility Block) |
| 14 | Supply and fabrication of 1” Drain Line, including Valve, Flange, and all necessary accessories. |
| 15 | Spine Terrace Area: Supply, fabrication, and installation of 150 NB Butterfly Valve with all necessary accessories. |
| 16 | Supply, Installation, Testing & Commissioningof Air Vent ½”- MOC - Stainless Steel |
| 17 | Supply, Installation, Testing & Commissioningof Air Vent ½\" |
| 18 | Supply, Installation, Testing & Commissioningof 1” Air Vent including Automatic Air Releaser. |
| 19 | Replacement work of Bypass Line: Supply, fabrication, and installation of 370 mm length bypass line with a 40 NB Ball Valve all inclusive of flanges, elbows and necessary accessories for complete commissioning. |
| 20 | Replacement work of Bypass Line: Supply, fabrication, and installation of 1200 mm length bypass line with a 80 NB Butterfly Valve, Flange, elbows and necessary accessories for complete commissioning. |
| 21 | General Service Work for Pot type Strainer Units (of Cooling Tower) |
| 22 | Patch Work on pipelines. |
| 23 | Supply and installation of insulation on specified pipelines. [Puf insulation with Aluminium Cladding] |
| 24 | Comprehensive servicing of installed valves of various sizes in the utility piping system, upto and including 50 NB. The scope of work includes inspection of each valve, cleaning of moving parts, and application of suitable industrial-grade grease to ensure smooth operation. Rope packing shall be removed and replaced wherever leakage, wear, or deterioration is observed, ensuring proper sealing and tightening of the gland. Bolts and nuts shall be checked for corrosion or damage and shall be replaced only where found unserviceable, using equivalent or superior grade hardware. |
| 25 | Comprehensive servicing of installed valves of various sizes in the utility piping system, from 65 NB to 400 NB. The scope of work includes inspection of each valve, cleaning of moving parts, and application of suitable industrial-grade grease to ensure smooth operation. Rope packing shall be removed and replaced wherever leakage, wear, or deterioration is observed, ensuring proper sealing and tightening of the gland. Bolts and nuts shall be checked for corrosion or damage and shall be replaced only where found unserviceable, using equivalent or superior grade hardware. |
| 26 | Compressor Air Pipe Line Works |
| 27 | Compressor Air Pipe Line Work: Replacement of existing pipes, Supply and Installation of new MS Pipeline all inclusive of necessary accessories - Size: 65 NB |
| 28 | Compressor Air Pipe Line Work: Replacement of existing pipes, Supply and Installation of new MS Pipeline all inclusive of necessary accessories - Size: 40 NB |
| 29 | Compressor Air Pipe Line Work: Replacement of existing valves, Supply and Installation of new Ball Valves all inclusive of necessary accessories - Size: 40 NB |
| 30 | Structural Supports, Ladders, and Civil Works |
| 31 | Supply, fabrication, and installation of BCG Area pipeline supports: Channel size 150 × 75 mm with base plate (35 sets). |
| 32 | Supply and erection of 2 ladders with handrails, fabricated from 2\"x2\" MS L-Angle and MS Round Pipe. |
| 33 | Supply, fabrication, and erection of pipeline supports with civil work including dismantling of existing pedestal, removal of concrete and replastering work, structural work with Channel size 75 × 40 mm and associated items. |
| 34 | Painting Works |
| 35 | Painting work: Material supply & labour charges for Cooling Tower and spine area of various sizes of pipeline painting work. |
| 36 | Painting work: Material supply & labour charges for Cooling Tower and Spine Structural painting work. |