|
| 1 | White washing / Colour washing with lime to give an even shade in Factory & T/ship Area at all heights & depths. |
| 2 | a)Old work. |
| 3 | i)One or more coats. |
| 4 | ii)Two or more coats |
| 5 | b)New work (Three or more coats) |
| 6 | Note: By using painting brush only. |
| 7 | Distempering with oil bound / Acralic washable distemper of approved brand and manufacture to give an even shade in Factory & T/ship Area at all heights & depths. |
| 8 | a)Old work. |
| 9 | i)One or more coats. |
| 10 | ii)Two or more coats |
| 11 | b)New work (Two or more coats with one coat of primer). |
| 12 | Wall painting with plastic emulsion paint of approved brand and manufacture to give an even shadein Factory & T/ship Area at all heights & depths. |
| 13 | a)One or more coats on old work. |
| 14 | b)Two or more coats on new/ old work. |
| 15 | Finishing walls with water proofing cement paint of approved brand and manufacture and of required shade in Factory & T/ship Area at all heights & depths. |
| 16 | a)New work (Three or more coats). |
| 17 | b)Old work. |
| 18 | i)One or more coats. |
| 19 | ii)Two or more coats |
| 20 | Applying one coat of cement primer of approved brand and manufacture on wall surfaces in Cement primer in Factory & T/ship area. |
| 21 | Painting with synthetic enamel paint of approved brand and manufacture in all shades to give an even shadein Factory & T/ship Area at all heights & depths. |
| 22 | a)New / old work on steel/ wood work (two or more coats). |
| 23 | b)Old work on steel/ wood work (one or more coats). |
| 24 | Painting road surface with road marking paint of approved quality (one or more coats) in Factory & T/ship area. |
| 25 | French spirit polishing in Factory & T/ship area. |
| 26 | i)One or more coat on old work. |
| 27 | ii)Two or more coat on new / old work including a coat of wood filler. |
| 28 | Removing white or colour wash / dry or Oil Bound Distemper / Cement paint (Snowcem) by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc.complete,in Factory & T/ship Area, as per theinstructions of Engineer-in-charge, at all heights & depths. |
| 29 | Finishing wall/ ceiling with plaster of paris of approved make at all heights and depths including preparation of surface complete at Factory & T/ship area,as per instructions of Engineer-in-charge. |
| 30 | Writing number plates/ name plates/ boards etc. with synethic enamel Paint at all heights/ depths including painting the base and legs of boards etc. with Syn. Enamel paint two or more coats using specified superior quality paint of approved brand/ shade and manufacture completein Factory & T/ship Area, all as per specification and instructions of the Engineer-in-charge. |
| 31 | Repair to plaster of thickness 12mm to 20mm in patches of area 2.5 sq.m. and under including cutting the patch in proper shape and preparing and plastering the surface of the walls complete including disposal of rubbish with in 50 mtr. Lead with cement mortar 1:4 (one cement: 4- sand), at all heights & depths in Factory & T/ship area. |
| 32 | Labour rate only for distempering with oil bound washable distemper / dry distemper synthetic enamel paint on old / new work to give an even shade (one or more coats) all heights and depths including scaffolding surface preparation through brushing and scrapping all loose practicals, scales, etc. It shall then be sand papered to give a smooth and even surface.Any uneven surface / holes shall be made good by applying putty, made ofPLASTER OF PARIS mixed with colour to be used. Surface then again rubbedwith fine sand paper & made smooth. A coat of distemper shall be applied over patches. Applications of specified number of coats two or more (as per requirement) complete at Factory & T/ship area, as per specification instructions of the Engineer-in-charge. (Sand paper/ scrapper/ brush etc. for surface preparation and distempering shall be arranged by the contractor). |
| 33 | Painting small articles of painted area not exceeding 0.1 sq.m. with paint of approved brand and manufacturer and of required quality and shade to give and even shade at Factory & T/ship area. |
| 34 | Painting with bitumen of approved quality of grade 85/25 @ 1.7 kg. per sq.m. on RCC / plaster finished surface including cleaning the surface with brushes and finally with a piece of cloth lightly soaked in kerosene oil complete at Factory & T/ship area, at all heights & depths. |
| 35 | Melamine polishing on wood work (one or more coat) at Factory & T/ship area. |
| 36 | Providing & applying wall care white cement based putty of JK / Birla Plus /approved brand and manufacturer over plastered surface on walls and ceiling to prepare the surface even and smooth finish at Factory & T/ship area, as per direction of Engineer-in-charge. |
| 37 | Attending various types of finishing jobs of measurement not less than 2.00 sq.m. for minute/ intricate nature of works, which are otherwise not easily susceptible to measurement and is time consuming. The job pertains to white washing/ painting/ distempering/ cement painting / spirit polishing etc. at different locations, in small quantum but for urgent assignment requiring skilled & unskilled labour to accomplish the job, all as per the site requirements and instructions of the Engineer-in-charge. Material required for this job shall be supplied free of cost by NFL. |
| 38 | Finishing walls with acrylic smooth exterior paint of required shades, old work (Two or more coat) on existing cement paint surface of following Brand/ Manufacturer.i) Apex of Asian Paint.ii) Excel of Nerolac Paint.iii) Weather Coat Smooth of Berger Paint.iv) Weather Shield of Dulux paint. |
| 39 | Supply of following painting material / items of approved brand and manufacture, as per the instructions of the Engineer-in-charge: |
| 40 | i)Lime (White Wash). |
| 41 | ii)Synthetic Enamel Paint. |
| 42 | iii)Cement Paint (Snowcem). |
| 43 | iv)Copper Sulphate (Neela Thotha). |