|
| 1 | M&L for Point wiring in repairs complete with two runs of 2.5 sqmm single core PVC insulated FR-LSH cable1100 volts grade with multi-stranded copper conductors, drawn throughand including PVC double locked Casing & caping including provision of 2.5 sqmm, FR-LSH, PVC insulated copper cable as earth continuity conductor connecting to earth dolly, including PVC rectangular box for mounting switches/sockets/regulators etc. with 3mm thick plastic laminated sheet cover of suitable size as required at site and 50 mm deep complete all as specified and as directed. |
| 2 | All as per item No- 1 here-in-before but with 4 Sq mm for 3 pin 15 Amps socket point controlled by one switch on independent board and 4 Sq mm copper conductor green in colour as earth continuity conductor connected to common earth dolly complete all as specified and as directed. |
| 3 | M&L for Switch Socket combination, 2 in 1, 5 pin 6A flush type |
| 4 | M&L for Switch Socket combination, 2 in 1, 5 pin 6A/16A flush type |
| 5 | Supply and fixing sub-main wiringwith PVC insulated & unsheathed two run of 4.0Sqmm single core multi stranded copper conductor cable (FRLSH) 1100 Volt grade along with one run of4.0 Sqmm PVCinsulated & Unsheathed copper conductor cable (FRLSH) 1100Volt grade connected to common earthdolly as earth continuty conductor, drawn through in including 20 mm wide PVC Casing Capingafter and inclduingtaking down existing submain wiring complete all as specifiedand as directed. |
| 6 | Supply and fixing sub-main wiringwith PVC insulated & unsheathed two run of 6.0Sqmm single core multi stranded copper conductor cable (FRLSH) 1100 Volt grade along with one run of6.0 Sqmm PVCinsulated & Unsheathed copper conductor cable (FRLSH) 1100Volt grade connected to common earthdolly as earth continuty conductor, drawn throughincluding 20 mm wide PVC Casing Capingafter and inclduingtaking down existing submain wiring complete all as specifiedand as directed. |
| 7 | M&L for MCB Distribution board double door type SPN 8 way sheet steel powder painted with bus bar neutral link & earth din rail, recessed with wall surfaces by chase cutting and makinggooddisturbed surfaces of wall complete all as specified and asdirected. |
| 8 | M&L for MCB Distribution board double door type SPN 4 way sheet steel powder painted with bus bar neutral link & earth din rail, recessed with wall surfaces by chase cutting and makinggooddisturbed surfaces of wall complete all as specified and asdirected. |
| 9 | S&F MCB, Single pole5 to 30 Amp, 10 kA, ISI Marked etc complete all as specified and asdirected. |
| 10 | S&F MCB, SPNupto 40Amp, 10 kA, ISI Marked etc complete all as specified and asdirected. |
| 11 | M& L for servicing of following Air Conditioners including inspecting ACs for standing pressure and find out type of gas used, dismantling the AC indoor unit, seperate the Grill, Air filter, PCB and use the protector cover for indoor unit and washingthe cooling coil, condenser coil, air fillter, swing blade, fan blade, grill of outdoor unit by jet pressure including cleaning all parts of indoor/ outdoor unit and drying all parts with clean cloth and re-assembling the complete unit and re-installing in its original position and testing on completion of proper servicing complete all as directed by the Engineer-in- Charge. |
| 12 | Window type AC upto 2.0 TR capacity |
| 13 | Split type AC upto 2.0 TR capacity indoor and out door unit complete |
| 14 | Casette AC of 2 to 4.0 TR capacity indoor and out door unit complete . |
| 15 | Tower AC of capacity upto 3/4/8 TR indoor and out door unit complete. |
| 16 | M & L for disconnect and remove unserviceable main PCB/ display PCBand Supply and fix new main PCB/ display PCBsuitable for existing model of following cooling appliances complete all as specified and as directed by the Engineer-in-Charge. |
| 17 | Window AC upto 2 TR |
| 18 | Split AC 2 TR |
| 19 | Split AC 1.5TR |
| 20 | Casette AC of 4.0 TR Capacity |
| 21 | Tower AC of capacity upto 4 TR |
| 22 | Taking out the unserviceable burnt fan motor from the following cooling appliances and supply and fix new fan motor suitable for existing model complete all as specified and directed by Engineer-in-Charge. |
| 23 | Window Air Conditioner of Capacity upto 2.0 TR. |
| 24 | Split Air Conditioner of Capacity upto 2.0 TR. |
| 25 | Casette/ Tower AC of capacity upto 4 TR |
| 26 | Taking down unserviceable blower motor of split type air conditioner and supply and fix new blower motorincluding Blower suitable for existing model of indoor unit of split type air conditioner of capacity upto 2.0 TR including necessary connections and testing on completion complete all as specified and as directed by Engineer - in- Charge. |
| 27 | Taking down unserviceable Swing motor of split type air conditioner and supply and fix new Swing motor suitable for existing model of indoor unit of split type air conditioner of capacity upto 2.0 TR including necessary connections and testing on completion complete all as specified and as directed by Engineer - in- Charge. |
| 28 | Disconnect and remove unserviceable Spilt/Window AC compressor and supply and fix new sealed rotary / reciprocating compressor including brazing the suction / discharge lines suitable for existing model of following cooling appliances and testing on all as specified and directed by Engineer-in-Charge. |
| 29 | 1/1.5 TR window type/split type Air Conditioner. |
| 30 | 2.0 TR window type/split type Air Conditioner |
| 31 | 4TR Casette/ Tower type Air Conditioner |
| 32 | Flushing and leak testing the complete system Spilt/Window AC and Water cooler with nitrogen gas and making good leaking portion by brazing and topping up compressor oil complete all as specified and as directed by Engineer in charge. Note: Cost of brazing and topping up of compressor oil is deemed to be included in quoted rate. |
| 33 | Taking out unserviceable air filter and supply and fix new air filter cleanable, indigenous of suitable size for the window / split type air conditioners of capacity upto 4.0 TR complete all as specified and as directed by the Engineer-in-Charge. |
| 34 | Taking out unserviceable condensor fan blades and supply and fix new condensor fan blades of existing/suitable model for the window type/out door unit of split type air conditioner of capacity upto 2.0 TR complete all as specified and as directed by Engineer-in Charge. |
| 35 | Taking down old unserviceable thermal insulationand Supply and fix and new thermal insulating puff for suction and discharge copper tubes of split type air conditioner of capacity upto 4.0 TR, neatly tying the ends with PVC insulation tape complete all as specified and directed by Engineer-in-Charge. Note Old insulation puff will be dumped at nearby dustbin. |
| 36 | Filling the gaps between wall and refrigerant piping with white cement to prevent rodents entry and finishing smoothly to match with surroundings etc complete all as specified and as directed. |
| 37 | Supply and fix in replacment Window/ split AC remote upto 4 ton capacity as per sample and directed by Engr-in-Charge. |
| 38 | Taking down unserviceable condensing coil unit and supply and fix new condensing coil unit suitable for window / split type AC of capacity upto 2.0TR, as per the existing, complete all as specified and directed by Engineer-in-Charge |
| 39 | Taking down the AC, taking carefully the indoor and outdoor units along with voltage stablizer of split type air conditioner of capacity upto 2.0 TR by disconnecting all electrical connections, suction and discharge lines from its installed position and shifting to another location, making hole into brick/stone wall & filling back with white cement where directed and installingthe indoor and outdoorunits alongwith stablizer at specified location and connecting all the electrical, suction and discharge lines, topping up the gas as required and testing on completion for proper functioning complete all as specified and directed by Engineer-in-Charge. (Note: Gas, Copper tube, Insulation puff, Connecting wire as required additional shall be measured seperately under relevant item). |
| 40 | Taking down unserviceable plug and socket of any description, supply and fix single pole and neutral enclosure withtwo pin and earth plug and socket along with a 20 to 30Amps rated SP MCB,230 volt, 50 HZas required at site, complete all as specified and directed by Engineer-in-Charge. |
| 41 | Supply and fix in replacment Window AC front grill capacity upto 2 tonas per existing sample and directed by Engr-in-Charge. |
| 42 | Checking the AC indoor unit for water leaks, cleaning the choked drain out pipe lines aligning with proper slope and fix the problem completely all as directed by Engr-in-Charge. |
| 43 | Taking down unserviceable single pole contactor and M& L for single pole contactor for out door unit of Air conditioner of capacity up to 2.0 TR etc complete all as specified and as directed |
| 44 | Taking down Existing unserviceable Indoor assembly and Supply and fix new Indoor assembly of split type AC of Capacity upto1.5/2.0 TR as per existing model or as approved by GE complete, connecting wires, copper lines and testing all as specified and any make as per site requited as directed by Engineer-in-charge. Note: Old Indoor assembly will be deposited in the AGE E/M store. |
| 45 | Material and Labour for replacement of worn out window ACfoundation frame, 0.75 Mtr height, frame work made out of angle iron 50 x 50x 3 mm, including cutting welding brazing soldering , including painting black colour (two coats) synthetic enamelled paint over a coat of red oxide primer etc and finishing, complete all as specified and as directed by Engineer-in-Charge. |
| 46 | Taking down Existing unserviceable Outdoor unit assembly and Supply and fix new outdoor unit assembly of split type AC of Capacity upto1.5/2.0 TR as per existing model or as approved by GE complete, connecting wires, copper lines and testing all as specified and any make as per site requited as directed by Engineer-in-charge. Note: Old Indoor assembly will be deposited in the AGE E/M store. |
| 47 | Replacing of defective components/ accessories suitable for window/Split type AC of capacity 1.5/2 TR as required at site and directed by Engr-in-charge for the following:- |
| 48 | Running capacitor powder filled 50+2 MFD as approved (Make: Usha/Keltron/uptron/epcos ). |
| 49 | Starting capacitor powder filled 100/120 MFD as approved ( Make : Usha/Keltron/Uptron). |
| 50 | Capacitor for blower motor suitable for window type AC 6 MFD Make: Sriram/renutral/Usha |
| 51 | Over load protector for the window type AC 1.5/2 TR (Make : Sriram/renutral/Whrilpool) |
| 52 | Thermostat switch assembly suitablefor window / split type AC of cap1.5/2 TRas approved ( Make : Renutral/Denfoss/ Sriram/ Cosmos ) |
| 53 | Starting relay suitable for window / split type AC of cap 1.5/2 TR as approved ( Make : Sriram/ Renutral/Whrilpool) |
| 54 | Kiny form of size 1/4\", 1/2\", 5/8\"\" and 3/8\"\" |
| 55 | Flair nut brass of size 1/4\", 1/2\", 5/8\"\" and 3/8\"\" |
| 56 | Capilary tube of size 1/32\" or as per sample |
| 57 | Copper tube of size 1/4\"\" with insulation matterials |
| 58 | Copper tube of size 1/2\"\"with insulation matterials |
| 59 | Material and labour for replacement ofcondensed water drain pipe of suitable length for split type/ windowAC complete including providing saddle with clamping arrangement (old unsv pipe dumped at nearly dustbin) all as directed by Engr-in-Charge. |
| 60 | Material and labour for replacement of copper discharge tube of size 3/8\"duly nylon insulated all as specified by Engineer -in-Charge. |
| 61 | Material and labour for replacement of copper suction tube of size 5/8\" duly nylon insulated all as specified by Engineer -in-Charge. |
| 62 | M&L for for taking down unserviceable secondaryPCB of indoor/ outdoor unit of Three phase ACscapacity upto 4 Ton and suppy and fix new secondary PCB of existing make, complete all as specified and as directed. |
| 63 | Material & labour for filling up & charging of R-22 refrigerant to the cooling appliancesall as specified and directed by Engineer-in-Charge. |
| 64 | Material & labour for filling up & charging of R-32 refrigerant to the cooling appliancesall as specified and directed by Engineer-in-Charge. |
| 65 | Material & labour for filling up & charging of R-134(A)/410 refrigerant to the cooling appliancesall as specified and directed by Engineer-in-Charge. |
| 66 | Material & labour for filling up & charging of R-410(A)/R-22 refrigerant to the cooling appliancesall as specified and directed by Engineer-in-Charge. |
| 67 | S & F Copper conductor, 6 sqmm 4 Core PVC insulated and sheathed multistrand cable all as specfied. |
| 68 | M & L for framed work as in wall mounted Stand suitable for fixing out door unit of split AC upto 2 Ton including all accessoriesincluding cutting, welding, brazing, soldering, duly powder coated etc and finishing, complete all as specified and as directed by Engineer-in-Charge. |
| 69 | Replacement of unserviceable components/ parts such as power circuit board (PCB) time relay, socket outlet, regulators/ toggle switch, voltmeter, indicator lamp, circuit wiring fuse etc including rewinding of transformer & painting voltage stabilizer of cap upto 5 KVA. |
| 70 | M&L for checking of Water cooler of any make / capacity in location and positionat any site in AA RMS including necessary servicing i.e. making good electrical including copper terminal, cleaning, drain water system including replacement of hose clamp etc. complete, cleaning condensor, condenser fan motor, door gasket,cleaning storage water tank cleaning and testing for proper functioning ofwater cooler all as directed by Engr-in-Charge. (The rates are deemed to be included for maintaining complete and properrecord of machine ie: make with srl no, SM no. capacity, date of servicing, user signature after servicing, concerned JEs signature all as directed by Engineer in-charge ) |
| 71 | Disconnect and remove unserviceable water cooler compressor and supply and fix new sealed rotary / reciprocating compressor with built-in OLP, thermostat including brazing the suction / discharge lines suitable for existing model water cooler capacity upto 120 ltrs per hours, filling the gas and testing on all as specified and directed by Engineer - in - Charge. Make : Kirlosker/Tecumseh/ Sriram/ Voltas/Carrier. |
| 72 | Disconnect and remove unserviceable over load protector and supply and fix new overload protector (OLP) suitable for Water cooler capacity ofupto 120 Ltrs complete all as specified and directed by Engineer-in-Charge.(Make-Blue star, Godrej, Voltas) |
| 73 | Materialand Labour forreplacement of copper filter and capillary tube of water cooler cooling capacity upto 60 Ltr/hrs, complete all as specified and as directed. |
| 74 | Material and Labour for replacement of condensor fanmotor as per sample HP-1/32, RPM-1300 suitable for water cooler having cooling cap upto 60 Ltr/hr with clips and motor fixing stand with fan blade ISI marked, complete all as specified and as directed. |
| 75 | Material and Labour for replacement of condensor fanmotor as per sample HP-1/16, RPM-1300 suitable for water cooler having cooling cap upto120 Ltr/hr with clips and motor fixing stand with fan blade ISI marked, complete all as specified and as directed. |
| 76 | Material and Labour for Repalcement of thermostat switch with knob for water cooler, having cooling capacity 40/60/150 Ltrs/hr, complete all as specified and as directed. (Make : Rasnutrol/ Indfoss /Annapurna) |
| 77 | Sunpply and fixing of 4.00Sqmm 4 core multi stranded copper conductor cable (FRLSH) 1100 Volt grade drawn through20/25 mm diaPVC Casing Capingafter and inclduingtaking down existing submain wiring complete all as specifiedand as directed. |
| 78 | Material and Labour for replacement of drain UPVC pipe32 mm bore for cooling cap upto 120 Ltr /Hrs90 cms in length with two Nos mild steel clamps and necessary brass screws etc, (old drain PVC pipe dumped near by dustbin) complete all as specified and as directed. (Make : RAJDOOT/KOHINOOR) |
| 79 | Material and Labour for replacement of SS drain water tray made out of 24 gauge stainless Steel sheet of size of 30x12x5 cm deep with necessary GI screws and PVC drain water connection arrangement of size not less than 25 mm dia, complete all as specified and as directed. (as per sample) |
| 80 | Material and Labour for replacement ofwater storage tank top lid completemade out of 22 gauge mild steel sheetof existing shape and size for water cooler cap 80Ltrs., platic sheet of appropriate thickness on one side withdoor gasket including, aluminium hinges 50 mm long 2/3 nos. andmaking good and painting with approved colour to match the existing colour, complete all as specified and as directed. |
| 81 | Material and Labour for replacement of worn out bottom base of water cooler foundation frame made out of 1.6mm thick MS sheetfor water cooler, & frame work made out of angle iron 25x25x3 mm, including cutting welding brazing soldering , making holes for sealed unit , condenser with condensor fan motor, including painting black colour (two coats) synthetic enamelled paint over a coat of red oxide primer etc and finishing, complete all as specified and as directed by Engineer-in-Charge. |
| 82 | Taking out unserviceable push button tap and supply and fix new Self-closing taps,cast copper alloy, chromium plated, screwed of size 15 mm dia bore suitable for water cooler complete all as specified and directed by Engieer- in - Charge.Zoloto/Leader/HM/Shakti/Prayag. |
| 83 | M&L for permanent type stiker of size 100x 50 mm having following details in letters not exceeding 15 mm, complete all as specified and as directed. (i)Machine Srl No______________. (ii)MES No___________________. (iii)Date set to work.____________. (iv)PRB Page No ______________. (v)Location___________________. |
| 84 | Material and labour for painting to water cooler of storage cap. 150/120/80 Ltrs spray painting with two coats of synthetic enamelledpaint(first quality) includingpreparation of surface, complete all as specified and as directed. Make: ASIAN /BERGER /NEROLAC . |
| 85 | Material and labour for PVC float valve 15 mm bore with PVC float, ball ISI marked complete with check nut/socket/GI nipple, complete all as specified and as directed. by Engineer-in-Charge Make: PRAYAG/ POLYTUFF |
| 86 | Material and labour for replacement ofaluminium fan blade for condenser fan motor (as per sample) suitable for water cooler having cooling capacity 60/150 Ltr/hrs water cooler, complete all as specified and as directed. |
| 87 | Material and labour for replacement of condenser unit complete suitable for 40 Ltr/hrs cap. Water cooler including gas charging flushing out the system brazing, welding and jointing the suction reed and discharge reed complete all as per direction of Engineer-in-Charge |
| 88 | Material and labour for replacement of condenser unit complete suitable for 60 to 120 Ltr/hrs cap. Water cooler including gas chargin flushing out the system brazing, welding and jointing the suction reed and discharge reed complete all as per direction of Engineer-in-Charge |
| 89 | Supply and laying or fixing or passing through pipe, 1100 volts grade heavy duty cable with PVC insulated aluminium conductor served with an inner sheathing of PVC tapearmoured with galvanised steel wire or tape and overall PVC sheathed 4 sq. mm nominal cross section in service connections |
| 90 | Supply and laying or fixing or passing through pipe, 1100 volts grade heavy duty cable with PVC insulated aluminium conductor served with an inner sheathing of PVC tapearmoured with galvanised steel wire or tape and overall PVC sheathed 6 sq. mm nominal cross section in service connections |
| 91 | Attending day to day complaint to find out the fault of split ac, window ac, Casette ac and water cooler all as directed by Engr-in-charge. |
| 92 | M & L for Servicing of Refrigeratorsof capacity from 165 to 460 ltr,Single door ofany make / model by Cleaning of condensing coil with wire & brush to remove dust includingcheckingof electric circuit/ refreshing the electric circuit for smooth functioning of Refrigerators all as specified and directed by Engr-in-Charge. |
| 93 | All as per item No 66.00 (here-in-before) but for double door Refrigetors. |
| 94 | M & L for Servicing of Deep fridger upto 460ltrcapacity2/3 door ofany make / model by Cleaning of condensing coil with wire & brush to remove dust includingincludingcheckingof electric circuit/ refreshing the electric circuit for smooth functioning of Refrigerators all as specified and directed by Engr-in-Charge. |
| 95 | M & L for taking down/ Disconnecting unserviceable Deep frezzer/ Refrigerator compressor and supply and fix new sealed rotary / reciprocating compressor with built-in OLP, thermostat including brazing the suction / discharge lines suitable for existing model offilling the gas and testing on all as specified and directed by Engineer - in - Charge following cooling appliances. |
| 96 | For refrigerator/ deep frezzer90 to 195 ltr capacity |
| 97 | For refrigerator/ deep frezzer200 to 410 ltr capacity |
| 98 | Supply & charging the Refrigerarent R-134 or as existing refrigerant to Refrigerators/ deep freezer up to 195 ltr capacity including repairing the leakage if any and testing complete all as specified & directed by Engineer-in-charge |
| 99 | All as per item No 70.00 (here-in-before) but for 200 ltrs to 410 ltrs capacity |
| 100 | Taking down/ Disconnect unserviceable Deep frezzer/ Refrigerator PCB (Printed Circuit Board) and supply and fix new PCB suitable for existing model of following cooling appliances, all as specified and directed by Engineer - in - Charge. |
| 101 | Upto 195 ltrs |
| 102 | 200 to 410 ltrs |
| 103 | Disconnect and remove unserviceable Refrigerator coolling chamber and supply and fix new colling chamber suitable for existing model of following cooling appliances, all as specified and directed by Engineer - in - Charge. |
| 104 | Upto 195 ltrs |
| 105 | 200 to 410 ltrs |
| 106 | Taking down unserviceable condensing coil unit and supply and fix new condensing coil unit suitable for Refrigerator of capacity upto 310 Ltrs complete all as specified and directed by Engineer-in-Charge |
| 107 | M & L for Fan Motor of suitable for refrigerator/ deep freezer as per existing model and make for fwg capacities:- |
| 108 | Upto 195 ltrs |
| 109 | 200 to 410 ltrs |
| 110 | M&L for replacement of the following parts/items ofrefrigerator/Deep Freezer 190 ltr to 410 ltr capacity,complete all as specified anddirected. |
| 111 | Starting capacitor of capacity 10 MFD/20MFD.Make : Asian/Keltern/Unistar/EPSCO/Keal/as per existing |
| 112 | Running capacitor of 30 MFD/36 MFD capacity.Make : Asian/Keltron/Unistar/EPSCO/Keal/as per existing |
| 113 | Running/Fanmotor capacitorof 4 to 6 MFD.Make : Asian/Keltron/Unistar/EPSCO/Keal/as per existing |
| 114 | Starting relay open type for refrigerator Make: Renutral/Shriram/Indfoss/as per existing |
| 115 | Overload protector for refrigerator Make: Renutral/Shriram/Indfoss/as per existing |
| 116 | Thermostat for Refrigerator Make : Renutral/Shriram/Indfoss/as per existing |
| 117 | Wiring kit for Refrigeration/Deep Freezer |
| 118 | Refrigerator/Deep freezer filter |
| 119 | Selector switch as per sample |
| 120 | Timer switch suitable for refrigerator/deep freezer of capacity 90 to 410 ltrs.Make - LG,Whirlpool, bluestar |
| 121 | Door gasket with magnetic strip for upto 195 ltrs refrigerator |
| 122 | Door gasket with magnetic strip for 200 to 410 ltrs refrigerator/deep freezer |
| 123 | Biometal for Deep freezer/Refrigerator |
| 124 | Sensor as per existing sample |
| 125 | Pin type / screw type bulb suitable for 90 ltr to 360 ltr. Refrigerator. |
| 126 | Door switch, 230 volt for refrigerator |
| 127 | M & L for Flushing and leak testing the complete system Refrigerator and deep freezer with nitrogen gas and making good leaking portion by brazing and topping up compressor oil complete all as specified and as directed by Engineer in charge. Note: Cost of brazing and topping up of compressor oil is deemed to be included in quoted rate. |
| 128 | Material and labourfor replacement ofdoor lock with keys-2 nos. for any capacity of refrigerator as per sample approved by Engr-in-Charge. |
| 129 | Material and labour for replacement of PVC accessories and suitable for upto 195 Ltrs Cap. Refrigerator complete of matching size/ as per sample all as specified and directed by Engr-in-Charge.. |
| 130 | Material and labour for replacement of PVC accessories suitable for upto 320 ltrs capacity refrigerator as per sample, complete of matching colour all as specifiec and directed by Engr-in-Charge. |
| 131 | Material and labour for replacement of refrigerator door handle of 165 to 320 Ltrs Capacity of any make and model all as per directed by Engr-in-charge. |
| 132 | S&F MCB SPNupto 40Amp, 10 kA, ISI Marked etc complete all as specified and as directed. |
| 133 | M& L for servicingof IVRFB-10THN VRF Air Conditioners including inspecting ACs for standing pressure and find out type of gas used, washing outdoor unit by jet pressure including clean the all parts of indoor/ outdoor unit and dry the all parts with clean clothand testing on completion of proper servicing complete all as directed by the Engineer-in- Charge. |
| 134 | M& L for servicingof IVRFB-14THN VRF Air Conditioners including inspecting ACs for standing pressure and find out type of gas used, washing outdoor unit by jet pressure including clean the all parts of indoor/ outdoor unit and dry the all parts with clean clothand testing on completion of proper servicing complete all as directed by the Engineer-in- Charge. |
| 135 | M& L for servicingof IVRFB-16THN VRF Air Conditioners including inspecting ACs for standing pressure and find out type of gas used, washing outdoor unit by jet pressure including clean the all parts of indoor/ outdoor unit and dry the all parts with clean clothand testing on completion of proper servicing complete all as directed by the Engineer-in- Charge. |
| 136 | Comprehensive, preventive,and periodical maintenance of VRF AC plant by OEM or authorised partner of OEM (Make blue Star) including Fixing/Labour Charges for replacing of defective components/ accessories ofcomplete VRF AC unit ofcapupto 16 HP all as required at site and directed by Engr-in-charge for the following:- |
| 137 | Supply of VRF ODU controller for VRF AC Plant of 10/14/16 HP capacity |
| 138 | Supply of drive for ANB78FVA SIAM compressor for 14 HP capacity |
| 139 | Supply of VRF ODU Fan controller V3.0 for VRF AC plant of 10/14/16 HP capacity |
| 140 | Supply of DMUB6D1BL DC Motor 560 W 3/4 inc etc complete all as specified and as directed |
| 141 | Supply of capacitor PCB for IVRF cap 14/16 HP etc complete all as specified and as directed |
| 142 | Supply of IVRF Noise filter PCB-14 HP etc complete all as specified and as directed |
| 143 | Supply of IVRF bridge rectifier for 14/16 HP etc complete all as specified and as directed |
| 144 | Supply of VRF ODU power board for 10/14/16 HP cap etc complete all as specified and as directed |
| 145 | Supply of IVRF Communication PCB for cap 10/14/16 HP cap etc complete all as specified and as directed |
| 146 | Supply of Temp sensor SE VRF ODU DLT for cap 10/14/16 HP etc complete all as specified and as directed |
| 147 | Supply of Temp sensor VRF ODU ambient OH for cap 10/14/16 HP etc complete all as specified and as directed |
| 148 | Supply of Drive for ANB78FVA SIAM compressor for 16 HP capacity etc complete all as specified and as directed |
| 149 | Supply of drive for ANB66FVA SIAM Compressor for VRF cap 10 HP etc complete all as specified and as directed |
| 150 | Supply of DMUB8D1BL DC motor DMUB 750W 5/8 PANASON etc complete all as specified and as directed |
| 151 | Supply of IVRF Noise filter PCB-10 HP etc complete all as specified and as directed |
| 152 | Supply of IVRF capacitor PCB -10HP etc complete all as specified and as directed |
| 153 | Supply of VRF FREE Large Cassette PCB etc complete all as specified and as directed |
| 154 | Supply of VRF HI-Wall PCB etc complete all as specified and as directed |
| 155 | Supply of Room Temp Sensor etc complete all as specified and as directed |
| 156 | Supply of Liquid Temperature sensor etc complete all as specified and as directed |
| 157 | Supply of Gas Temp sensor etc complete all as specified and as directed |
| 158 | Material and labour for filling up and charging of R-410 refrigerant or suitable for Tower AC and VRF AC Plant all as per specified and directed by Engr-in-charge. |
| 159 | Supply of IVRF compressor of cap from 10 HP to 16 HP all as specified and directed by Engr- in- charge. |
| 160 | Supply and fix fan motor including fan blade suitable for 3/4/8 Ton Tower AC, as per existing sample all as specfied and directed by Engr-in charge. |
| 161 | Supply and fix Blower motor with blower suitable for 3/4/8 Ton Tower AC, as per existing sample all as specfied and directed by Engr-in charge. |
| 162 | Supply and fix PCB indoor unit suitable for 3/4/8 Ton Tower AC, as per existing sample all as specfied and directed by Engr-in charge. |
| 163 | Supply and fix PCB outdoor unit suitable for 3/4/8 Ton Tower AC, as per existing sample all as specfied and directed by Engr-in charge. |
| 164 | Supply and fix Swing motor suitable for 3/4/8 Ton Tower AC, as per existing sample all as specfied and directed by Engr-in charge. |
| 165 | Supply and fix Swing Blade suitable for 3/4/8 Ton Tower AC, as per existing sample all as specfied and directed by Engr-in charge. |