|
| 1 | Work will be executed inside Barrack Store yard of GE Gwalior and Officer/JCO/ORs Md accns /OTM building/ Office area as per requirement. It is the responsibility of the contractor to lift the furniture from store godowns/sites/accommodations for painting/polishing and to keep it back in store godowns/ sheds/office/Govt. Md accn/OTM and at any other location in a systematic manner as directed by Eng in Charge. It is the part of CA and to be included in the quoted rates by contractor.Wooden Furniture:-Materials and labours for carrying out polishing one coat to wooden surfaces with french polish of approved make and brand after cleaning, dusting and scratching the entire wooden surface with sand emery paper, filling putty to the bore holes making surface smooth by sanding and grinding with standard workmanship. The polishing shall be carried out after making the article intact by tightening all parts. Complete all as specified & directed by Engr-in Charge/GE. |
| 2 | BED PLY : FD-213, FD-246 |
| 3 | BIN LINEN MULTIPURPOSE:-FD/E6MAP/09 |
| 4 | CHAIR DINING (JCO/ORS) : FD/MAP-II/05 |
| 5 | CHAIR DINING (OFFICER) : FD/MAP-II/04 |
| 6 | CHAIR DINING : FD-16, FD-203, FD-228, FD-279, FD-1105 |
| 7 | CHAIR EASY : FD-17(M), FD-201, FD-229, FD-281, FD-1108 |
| 8 | CHAIR WOODEN BOTTOM : FD-56, FD-225, FD-285 |
| 9 | CHAIR WRITING : FD-20(M), FD-202, FD-280 |
| 10 | HAT STAND WITH MIRROR : FD-23(M), FD-206, FD-233, FD-361, FD-1110 |
| 11 | PEG TABLE : FD-25(M), FD-236, FD-277, FD-384 |
| 12 | SIDE BOARD : FD-26(M),FD-241(M), FD-371, FD-1112 |
| 13 | SIDE RACK 3/4 SPACES - DB-4123 |
| 14 | SOFA SET 5 SEATER CUSHIONED (01 THREE SEATER + 02 ONE SEATER) : FD/MAP-II/02 |
| 15 | SOFA SET 5 SEATER CUSHIONED (01 THREE SEATER + 02 ONE SEATER) : FD-258, FD-281, FD-373, FD-1113 |
| 16 | TABLE 900 MM X 600 MM OR (3\" x 2\") (WOODEN) W/O DRAWER : FD-42, FD-55, FD-223, FD-231, FD-284 |
| 17 | TABLE 900 MM X 600 MM WITH DRAWER (3\" x 2\") (WOODEN) : FD-41, FD-224, FD-283 |
| 18 | TABLE BED SIDE : FD-28, FD- 210, FD- 248, FD-276 |
| 19 | TABLE CENTER : FD-29(M), FD-235, FD-274 |
| 20 | TABLE DINING 4 PERSONS: FD/MAP-II/03, FD- 30(M), FD-239, FD-273, FD- 376 |
| 21 | TABLE DINING 6 PERSONS: FD/MAP-II/03, FD- 30(M), FD-239, FD-273, FD- 376 |
| 22 | TABLE DINING 8 PERSONS : FD/MAP-II/03, FD- 30(M), FD-239, FD-273, FD- 376 |
| 23 | TABLE DRESSING GENTS : FD/E6/MAP/16, FD- 31(M), FD-230, FD- 379 |
| 24 | TABLE DRESSING LADIES : FD/MAP-II/07, FD- 32(M), FD-251 |
| 25 | TABLE WRITING : FD-33(M), FD-249, FD-275 |
| 26 | TEAPOY : FD-34(M), FD-232, FD-278, FD-382 |
| 27 | Steel Furniture:-Materials and labours for carrying out painting (internally & externally) to steel surfaces with one coat of synthetic enamel paint of approve shade and quality over a coat of red-oxide primer after cleaning, dusting and scratching the entire metal surface with sand paper, taking out dents & filling with putty, making surface neat and smooth with standard workmanship. Complete all as specified & directed by Engr-in Charge/GE. |
| 28 | ALMIRAH STEEL LARGE 1/2 HANGING 1/2 SHELVING : FD-114(M), FD-1033, FD/E6/MAP/18 |
| 29 | BED PLY TOP STEEL : FD/E6/MAP/08 ( R) |
| 30 | CHAIR VERANDAH : FD-19, FD-256, FD-359, FD/MAP-II/06, FD/E6/MAP/11 |
| 31 | CHARPOY IP HARD TOP : FD/MAP-II/01 |
| 32 | RACK SHOE STEEL : FD/E6/MAP/02(R) |
| 33 | SIDE RACK 3/4 SPACES - FD-97(M), FD-408, FD-1023 |
| 34 | STEEL ALMIRAH LARGE :FD-67(M), FD-351, FD-1031 |
| 35 | STEEL ALMIRAH MED : FD-243 |
| 36 | STEEL LOCKER OF SORTS :FD-127(M), FD-257, FD-1029, CWE/ BPL/53 |
| 37 | Steel Furniture with some wooden parts :- Materials and labours for carrying out painting (internally & externally) to steel surfaces with one coat of synthetic enamel paint of approve shade and quality over a coat of red-oxide primer after cleaning, dusting and scratching the entire metal surface with sand paper, taking out dents & filling with putty, making surface neat and smooth with standard workmanship. Materials and labours for carrying out polishing one coat to wooden surfaces with french polish of approved make and brand after cleaning, dusting and scratching the entire wooden surface with sand emery paper, filling putty to the bore holes making surface smooth by sanding and grinding with standard workmanship. The polishing shall be carried out after making the article intact by tightening all parts. Complete all as specified & directed by Engr-in Charge/GE. |
| 38 | COMPOSITE OFFICE TABLE W/PRELAMINATED VEENEERED PARTICLE BOARD (1200mm x 600mm x 750mm) |
| 39 | COMPOSITE OFFICE TABLE W/PRELAMINATED VEENEERED PARTICLE BOARD (1350mm x 750mm x 750mm) |
| 40 | COMPOSITE OFFICE TABLE W/PRELAMINATED VEENEERED PARTICLE BOARD (1500mm x 900mm x 750mm) |
| 41 | STEEL TABLE CLERK OF SORTS : FD-84(M),FD-381, FD-1004 |
| 42 | STEEL TABLE OFFICERS OF SORTS : FD-84(M), FD-1002, FD-1003 |
| 43 | TABLE BEDSIDE STEEL : FD/E6/MAP/15 ( R) |
| 44 | TABLE DINING (ORS) (2100 X 900 X 760) :FD-165 (M) |
| 45 | TEAPOY VARANDHA : FD-35(M), FD-208, FD-255, FD-383 |
| 46 | TEAPOY VERANDAH : FD/E6/MAP/17 |
| 47 | Charpoy GI pipe FD-220 S & F following components of charpoy including dismantling taking out carefully & replace old components of charpoy. Complete all as shown on drg, specified and directed by the Engineer-in-Charge. |
| 48 | Taking out existing U/S ply from the frame of charpoy GI pipe. Tighteningeach part of the entire frame of charpoy by using pipe wrench, Drilling holes 02 Nos each in long rails, 02 nos each in short rails & 01 nos on both flat iron at centre. S & F 12mm thick plywood commercial ISI markedmade of wood and other lignocellulosic products conforming to IS-303 of size 1980mm x 900mm fixed over the GI pipe frame by fixing 3 components (i.e- ply ,flat iron and rail ) with GI carriage bolt, nut and washers 6mm dia 62 to 65mm long. 12 mm round peading to ply affix with fevicol. Rest all as directed by GE/Engr-In Charge. |
| 49 | Removing existing U/S long rail of charpoy GI Pipe. S&F new long rail made out of 32 mm dia medium grade GI Pipe ISI marked confirming to IS-1239 threaded at both ends complete all as specified and shown on drg & directed by GE/Engr-In Charge. |
| 50 | M&L to making Short Rail from old U/S long rail retrieved from charpoy GI pipe including threading at both ends and fixing the same to charpoy GI pipe complete all as specified and shown on drg & directed by GE/Engr-In Charge. |
| 51 | M&L to making leg from old U/S short rail retrieved from charpoy GI pipe including threading at one end and welding 4mm MS plate of dia 36mm at other end. complete all as specified and shown on drg & directed by GE/Engr-In Charge. |
| 52 | Removing existing U/S/short lengthed old legs from the charpoy by unscrewing, S & F new legs 32 mm dia medium grade GI Pipe ISI marked confirming to IS-1239 threading at one end and welding 4mm MS plate of dia 36mm at other end. complete all as specified and shown on drg & directed by GE/Engr-In Charge. |
| 53 | Removing existing U/S Elbow of charpoy GI Pipe. S&F with new GI elbow three way 32 mm dia duly ISI marked complete all as specified and shown on drg & directed by GE/Engr-In Charge. |
| 54 | Removing existing U/S Check Nuts of charpoy GI Pipe. S&F with new check nuts 32mm dia duly ISI marked of approved quality complete all as specified and shown on drg & directed by GE/Engr-In Charge. |
| 55 | Removing existing U/S MS sheet toe and S/F new toe made from 4 mm thick MS sheet 36 mm dia be welded with running welding at the bottom of each legs & painted one coat with black paint as shown on drg & Directed by GE/EIC. |
| 56 | BED PLY TOP STEEL : FD/E6/MAP/08 (R) S & F following components of bed including dismantling taking out carefully & replace old components of Bed. Complete all as shown on drg, specified and directed by the Engineer-in-Charge. |
| 57 | S & F new 12mm thick commercialply placed in position fitted with 30/35mm long nut bolts and washers as shown in drg, |
| 58 | S & F new 18 mm thick exterior grade Prelaminated particle board ISI marked duly placed in position for headrest duly fitted with screws as shown in drg. |
| 59 | S & F new 18 mm thick exterior grade Prelaminated particle board ISI marked duly placed in position for footrestduly fitted with screws as shown in drg. |
| 60 | High Quality rubber shoes with inside MS washer at bottom 40mm high of size 38mmx38mm. |
| 61 | Welding work wherever required as directed by EIC |
| 62 | Painting to Bed Ply with one coat of synthetic enamel black paint over a coat of red-oxide primer after cleaning, dusting and scratching the entire metal surface with sand paper, making surface neat and smooth. |
| 63 | CHARPOY IP HARD TOP : FD/MAP-II/01 S & F following components of charpoy including dismantling taking out carefully & replace old components of charpoy. Complete all as shown on drg, specified and directed by the Engineer-in-Charge. |
| 64 | S & F new 12mm thick commercial Plywood of size 1916mm x 836mm fixed with nut and bolt (10 Nos). All as shown on drgs. |
| 65 | Replacement of Long railswith S & F New Long rails of size 1980mm x 65mm x 25mm rectungular of 16 Gauge MS pipe |
| 66 | Replacement of short railswith S & F New short rails of size 900mm x 65mm x 25mm rectungular of 16 Gauge MS pipe |
| 67 | Replacement of leg with S & F New leg of size 440mm x 32mm x 32mm rectangular of 16 Gauge MS pipe |
| 68 | Replacement of Stiffner with S & F New Stiffner of size 836mm x 25mm x 25mm square of 16 Gauge MS pipe |
| 69 | Replacement of center Stiffner with S & F New center Stiffner of size 836mm x 25mm x 25mm square16 Gauge MS pipe |
| 70 | MS Clips for fixing of plywood size 60mm x 25mm x6mm thick and welded with frame of charpoy. All as shown on drgs. |
| 71 | Removing old UNSV 32mmx32mm rubber shoes from the legs of charpoy, S & F new 32mmx32mm rubber shoes to the legs of charpoy |
| 72 | Welding work wherever required as directed by EIC |
| 73 | Painting to charpoy with one coat of synthetic enamel black paint over a coat of red-oxide primer after cleaning, dusting and scratching the entire metal surface with sand paper, making surface neat and smooth. |
| 74 | CHARPOY FOLDING IP NYLON NIWAR/PLY TOP : FD-388/388(R)S & F following components of charpoy including dismantling taking out carefully & replace old components of charpoy. Complete all as shown on drg, specified and directed by the Engineer-in-Charge. |
| 75 | Removing the U/S Plywood from the charpoy folding IP and S & F new 12 mm thick plywood top BWR grade ISI marked by necessary drilling and duly tightening with nut and bolts. Rest all as per drg and as directed by Engr-in-Charge and GE. |
| 76 | Removing the U/S flat iron stay and S & F new 25mmx 6mm flat iron stay as shown in drg. |
| 77 | Replacement of U/S PVC shoes with best quality PVC shoes of dia 25mm and height 30mm shall be provided to legs of charpoy. complete all per drg, specified and as directed. |
| 78 | Welding work wherever required as directed by EIC and GE. |
| 79 | Painting to all steel portion of charpoy with two coat of synthetic enamel black paint with spray machine after cleaning over a coat of red oxide/primer,dusting and scratching the entire metal surface of charpoy with sand paper, making surface neat and smooth. |
| 80 | WOODEN DESK SCHOOL WITH BENCH TYPE-B (960mm X 450mm X 620 mm) : CWE/BPL/TD/53/98 |
| 81 | Taking out US/decayed top of Desk(from wooden base) from its existing position and provision of new top at the same position made of 18 mm sakhu plank complete all as specified and directed by the Engr-in-Charge.(Top Means side, base, flap if exist or mayvendor visit at site in case of confusion to verify) |
| 82 | Taking out US/decayed top plank of Bench (from wooden base part) from its existing position and provision of new top plank at the same position made of 18 shakhu plankcomplete all as specified and directed by the Engr-in-Charge.(before quoting the bids vendor shall visit site to check the visual specs of items) |
| 83 | Taking out U/S/decayed legs of Desk from its existing position and provision of new legs of 1st class HW complete all as specified and directed by the Engr-in-Charge. |
| 84 | Taking out U/S/decayed long rails of Desk from its existing position and provision of new long rails of 1st class HW complete as specified and directed by the Engr-in-Charge. |
| 85 | Taking out U/S/decayed short rails of Desk from its existing position and provision of new short rails of 1st class HW complete as specified and directed by the Engr-in-Charge. |
| 86 | Taking out U/S/decayed seat of Bench from its existing position and provision of new seat at the same position made of 1st class HW complete all as specified and directed by the Engr-in-Charge. |
| 87 | Preparation of old painted surface of Desk by scrapping and painting with 1st quality synthetic enamel paint brown completed all as per drg & specified & directed by Engr-in-Charge. |
| 88 | Preparation of old painted surface of Bench by scrapping and painting with 1st quality synthetic enamel paint brown completed all as per drg & specified & directed by Engr-in-Charge. |
| 89 | WOODEN DESK SCHOOL WITH BENCH TYPE-A (1120mm X 450mm X770 mm) : CWE/BPL/TD/53/98 |
| 90 | Taking out U/S/decayed top of Desk(from wooden base) from its existing position and provision of new top at the same position made of 18 mm sakhu plank complete all as specified and directed by the Engr-in-Charge.(Top Means side, base, flap if exist or mayvendor visit at site in case of confusion to verify) |
| 91 | Taking out U/S/decayed top plank of Bench (from wooden base part) from its existing position and provision of new top plank at the same position made of 18 shakhu plankcomplete all as specified and directed by the Engr-in-Charge. |
| 92 | Taking out U/S/decayed legs of Desk from its existing position and provision of new legs of 1st class HW TW complete all as specified and directed by the Engr-in-Charge. |
| 93 | Taking out U/S/decayed long rails of Desk from its existing position and provision of new long rails of 1st class HW TW complete as specified and directed by the Engr-in-Charge. |
| 94 | Taking out U/S/decayed short rails of Desk from its existing position and provision of new short rails of 1st class HW TW complete as specified and directed by the Engr-in-Charge. |
| 95 | Taking out U/S/decayed seat of Bench from its existing position and provision of new seat at the same position made of 1st class HW TW complete all as specified and directed by the Engr-in-Charge. |
| 96 | Preparation of old painted surface of Desk by scrapping and painting with 1st quality synthetic enamel paint brown completed all as per drg, specified & directed by Engr-in-Charge. |
| 97 | Preparation of old painted surface of Bench by scrapping and painting with 1st quality synthetic enamel paint brown completed all as per drg, specified & directed by Engr-in-Charge. |
| 98 | REPAIRS TO TABLE 900 MM X 600 MM OR (3\" x 2\") (WOODEN) W/O DRAWER FD-284, FD-42, FD-55, FD-223 |
| 99 | Dismantling, taking out carefully & replacement of old existing broken table top of Table 900mm x 600mm of any decription & replacement of the same with S&F new table top of 18mm thick postforming exterior grade prelaminated particle board (Make:- Ecoboard/Action- Tesa / Greenply) as shown on drawing, specified and directed by the Engineer-in-Charge. |
| 100 | Replacement of legs(steel/wooden) of table 900mm x 600mmS&F new leg made out of Ist class hard wood (teak wood) |
| 101 | Replacement of table frame\"s rail with S&F newtable frame\"s long rail (steel/wooden) made out of Ist class hard wood (teak wood) complete all as shown on drawings, specified and directed by the Engineer-in-Charge. |
| 102 | Replacement of rubber shoe with screw (steel) with S&F new Nylon Buffer of superior quality screws (steel) of suitable size complete as approved and all as shown on drawings. |
| 103 | Replacement rectangutar braket with 08 Nos steel screws suitable size of Ist class hard wood (teakwood) of size 100 mm x 100 mm x 25mm complete as approved and all as shown on drawings. |
| 104 | S & F new Stiffener and complete all as shown on drawings, specified and directed by the Engineer-in-Charge. |
| 105 | Polishing two coats to old and new surfaces of table 900mm x 600mm (wooden ) two coat of paints on steel table after repairs, with melamine polish of approved Make including preparation of surfaces to wooden table. |
| 106 | TABLE DINING FOR 8/6 PERSONS AND OTHER STEEL TABLE OF SAME SIZE, FD/MAP AND TP SERIES |
| 107 | Replacement of US top of table 8 persons/other steel table of same size and S&F new table top of 18mm thick postforming exterior grade prelaminated particle board (Make:- Ecoboard/Action- Tesa / Greenply) as shown on drawing, specified and directed by the Engineer-in-Charge. |
| 108 | All as per Srl item No. 11.01 here-in-before but top of table dining 6 persons/other steel table of same size. |
| 109 | L-Shape wooden corner of size 4\" x 4\" x 1\" to the Table between legs and rail to be fixed with screw. |
| 110 | Replacement of leg with S&F new teak wood/steelleg made to shape |
| 111 | Replacement of long rail with S&F new teak wood/stellong rails made to shape |
| 112 | S & F new Nylon Buffer of superior quality with suitable screws for fixing complete all as shown on drg, specified and directed. |
| 113 | Replacement of short rails with new teak wood short rails made to shape as per existing specs |
| 114 | Polishing to table dining with melamine polish of approved grade and brand after cleaning,dusting and scratching the entire wooden surface with sand emery paper, filling putty to the bore holes making surface smooth by sanding and grinding with standard workmanship.The polishing shall be carried out after making the article intact by tightening all parts and carrying out antitermite and antibug treatment. |