| 1 | PART-I |
| 2 | Fixing prefabricated new mild steel ladders including taking prefabricated ladders to the site from AEN (VSG) store Baina and fixing/ welding in position to the mooring Dolphins as directed including drilling holes in horizontal deck slab, in the fender wall/ vertical surface etc. wherever required as directed, providing and fixing MS anchor bolts 25mm dia and 200mm long embedded 150mm in the concrete including grouting with Lock fix P compound of Fosroc make including scaffolding, drilling machine/ core cutter machine, welding machine, cutting machine, welding rods, safety equipment, painting ladders with two coats of approved anti-corrosive paint over a coat of approved primer, transporting etc. including dismantling damaged MS ladders and stacking at designated place at MM/MPA, MS ladders will be supplied free of cost by department etc. All tools, plants, labour, materials etc. complete. Note (1) Fabricated ladders will be supplied free of cost at AEN (Rly & VSG) store at Baina. (2) Transportation, loading, unloading to be arranged by the contractor for ladders. (3) All ancillary works related to fixing ladders etc. complete. Including additional MS plates, channels required for fixing ladders at position. (4) No additional payment will be done for other related works. (5) Including cost of hiring and operating charges of generator of required capacity for execution of work. |
| 3 | Supply of Launch for shifting of material, workman staff for execution and inspection for installing ladders etc till completion of wok. Costs to include loading and unloading of the tools, equipment, ladders etc. All expenses are chargeable to contractor. (Launch item rate is for fixing each ladder only) |
| 4 | Suppling and fixing structural steel (ISMB 250, ISMB300, MS plate) to the piles of mooring dolphin etc.including welding to liners in two rows, drilling machine/ core cutter machine, welding machine, cutting machine, welding rods, safety equipment, painting ISMB with two coats of approved anti-corrosive paint over a coat of approved primer, transporting etc. including dismantling damaged/ corroded ISMB and stacking at designated place at MM/MPA MS ladders will be s All tools, plants, labour, materials,etc.complete.Note (1) Transportation, loading, unloading to be arranged by the contractor. (3) All ancillary works related to fixing ISMB etc. complete. Including additional MS plates, channels required for fixing ISMB at position. (4) No additional payment will be done for other related works. (5) Including cost of hiring and operating charges of generator of required capacity for execution of work. 6) Fixing of ISMB 250 in two level i.e 2.4 below deck level and other at 3.4m. |
| 5 | Less cost of retrieved material (LS)= Rs. 19000/- |
| 6 | PART-II |
| 7 | Demolishing and clearing of cement concrete in trap stone metal, disposal of unserviceable material within a lead of 100m including all tools & plant, labour and material complete. |
| 8 | Excavation in dense or hard soil/murrum etc. including removal of obstructions such as small trees, vegetation etc. and removal of excavated material upto a lead of 50m and a lift of 1.5m including refilling foundation trenches. All labour and material etc.complete |
| 9 | Excavation in loose or soft/sandy soil including removal of obstructions such as small trees, vegetation etc. and removal of excavated material upto a lead of 50m and a lift of 1.5m including refilling foundation trenches. All labour and material etc.complete. |
| 10 | Soling with hard laterite rubble stone of 20 cm to 30 cm size including hand packing etc. complete. All labour & material etc. complete |
| 11 | Cement concrete (1:3:6) using 40mm graded black trap stone metal out of quarried boulders as coarse aggregate including mixing, depositing, consolidating, levelling, curing etc. All labour & material etc. complete. |
| 12 | P.C.C. (1:2:4) mix using 20 mm graded black trap stone metal out of quarried boulders as coarse aggregate in beams, lintels, structural slabs etc. of any size and shape including mixing, placing, consolidating, vibrating, leveling, curing etc. but excluding the cost of shuttering and reinforcement. All labour & material etc. complete. |
| 13 | Supplying & erecting in position structural steel work in single section incl. Cutting, hoisting, fixing in position and cleaning the surface, painting two coats of approved quality synthetic enamel paint of approved colour/ shade over a coat of redoxide zinc chromite primer etc. including for making gate of required size, hinges, locking arrangement from both side etc. All labour & materials tools & plant etc. complete. |
| 14 | Providing and fixing punched tape concertina coil (Zinc coating-275GSM) in position of 610mm diameter, wire of short profile with HTGS spring core wire diameter of 2.5mm pitch between barbed 25mm, having 50 rounds per 6meter length 6meters length with necessary clips, laying concertina on barbed wire etc. All tools, plants, labour and materials etc. complete. |
| 15 | Providing and fixing HDG barbed wire, distance between barbs 75-80mm with zinc coating 275 GSM including cutting, welding, providing small GI clips for support over angles in 8 horizontal rows, etc. including dismantling existing corrodded clips etc. All tools, plants, labour and materials etc. complete |
| 16 | Supplying and fixing woven plain GI wire fencing (chainlink fencing of 75mm (3\") X8 SWG mesh fixed to ISA angles including providing 2nos 16mm dia MS bars at top and bottom of fencing for every 1.2m height of fencing, welding 16mm diameter bars to angles or welding to the angles with small MS fixture for support, tying with binding wire, staples, painting MS bars/ MS fixures with two coats of Synthetic enamel paint over a coat of red oxide Zinc cromite primer rate include remoing old damaged fencing etc. but excluding cost of angles. All tools, plants, labour and materials etc. complete. |
| 17 | Supply of mazdoor for 8hours a day for executing Miscellaneous works in MOHP area including tree branches obstructing alignment of fencing work etc. All tools, plants etc. complete. |
| 18 | Repairs to gate no.2 including repairing the gate, replacing corroded part of gate, gas cutting, welding, grinding .. Etc. All tools, plants, labour and materials etc. complete. |
| 19 | Painting gate no.2 with a coat of primer and two coats of synthetic enamel paint including preparing the surface etc. All tools, plants, labour and materials etc. complete. |