| 1 | Operation of 33kV sub station, transformers and outdoor switch yard as per TSS 1 |
| 2 | Maintenance of 33 kV, VCB switchgear & Panels - 1 set of 7 breakers. (4 times x 1set = 4 Sets ) as per TSS 2 |
| 3 | Maintenance of LT Panels andcapacitor bank panels 1 set of28 panels. (4 times x 1set = 4 Sets) as per TSS 3 |
| 4 | Maintenance of outdoor lighting Fixtures( 4 times x 30 nos. = 120Nos.) as per TSS 4 |
| 5 | Maintenance of all type of indoor lighting fixtures, (2 times x 600 nos. =1200 Nos.) as per TSS 5 |
| 6 | Maintenance of all type of fans,(4 times x 200 nos. = 800 Nos.) as per TSS 6 |
| 7 | Yearly maintenance of 33 kV outdoor switch yard structure, (4 times x 1 set = 4 Sets ) as per TSS 7 |
| 8 | Yearly maintenance of 33 kV, VCB switchgear & panels, (2 times x 1set = 2 Sets) as per TSS8 |
| 9 | Yearly maintenance of LT Main panel with 5 ACB -1 Set at substation, ( 2 times x 1 set = 2 Sets) as per TSS 9 |
| 10 | Yearly maintenance of LT Sub panel with 2 ACB -1 Set at room number G-9(2 times x 1 set = 2 Sets) as per TSS 10 |
| 11 | Maintenance of 33 kV / 433 Volt, 1250 kVA transformers including oil filtration & testing (2 times x 2 nos.= 4 Nos.) as per TSS 11 |
| 12 | Maintenance of Distribution Boards, (4 times x 45 nos.= 180 Nos.) as per TSS12 |
| 13 | Replacement of concealed D.B enclosers with SITC of 12 ways distribution board encloser as per TSS 13 |
| 14 | Maintenance of lightning arresters at building\"s roof top (2 times x 1 set = 2 Sets) as per TSS 14 |
| 15 | Maintenance of earthing station including refurbishment of earth station (2 times x 29 nos. = 58 Nos.)as per TSS 15 |
| 16 | Supply and installation of tinned copper strip of (50 mm x 6 mm) size as per TSS 16 |
| 17 | Maintenance of LT SFU, MCCB etc. (2 times x 13 nos.= 26 Nos.) as per TSS 17 |
| 18 | Maintenance of D.O.L starters (2 times x 6 nos.= 12 Nos.) as per TSS 18 |
| 19 | Maintenance of Star Delta starters (2 times x 18 nos.= 36 Nos) as per TSS 19 |
| 20 | Maintenance of LT motors from 3 HP to 5.5 HP, (2 times each x 10 Nos. motors = 20 Nos.) as per TSS 20 |
| 21 | Maintenance of LT motors from 7.5HP to 10 HP, (2 times x 7Nos. motors = 14Nos.)as per TSS 21 |
| 22 | Maintenance of LT motors from 15HP to 20 HP, (2 times x 7Nos.=14 Nos. ) as per TSS 22 |
| 23 | Maintenance of 60 HP LT motors, (2 times x 1 No.=2Nos.) as per TSS 23 |
| 24 | Overhauling of LT motors from 3 HP to 5.5 HP, (1 times x10 Nos. motors = 10 Nos. ) as per TSS 24 |
| 25 | Overhauling of LT motors from 7.5 HP to 10 HP, (1 times x 7Nos. motors = 7Nos.)as per TSS 25 |
| 26 | Overhauling of LT motors from motors 15HP to 20 HP (1 time x 7 nos.= 7 Nos.) as per TSS26 |
| 27 | Overhauling of 60 HP LT motor, (1 time x 1 No.= 1No.) as per TSS 27 |
| 28 | Rewinding of LT motors from 3 HP to 5.5 HP motors as per TSS 28 |
| 29 | Rewinding of LT motors from 7.5HP to 10 HP motors as per TSS 29 |
| 30 | Rewinding of LT motors from 15 HP to 20 HP motors as per TSS 30 |
| 31 | Rewinding of LT 60 HP motor as per TSS 31 |
| 32 | Rewinding of 230 voltmotorup to 1 HPas per TSS 32 |
| 33 | Maintenance of power points and lighting switch boxes as per TSS 33 |
| 34 | Comprehensive maintenance of 415 volt, 5kVA online UPS(4 times x 2 sets = 8 Sets) as per TSS 34 |
| 35 | Comprehensive maintenance of 220 volt,6 kVAonline UPS(4 times x 2 sets = 8 Sets) as per TSS 35 |
| 36 | Comprehensive maintenance of 220 volt, 2kVA online UPS (4 times x 2 sets =8 Sets) as per TSS 36 |
| 37 | Cutting wild grass & vegetation including chemical spraying (4 times x 2set = 8 Sets)as per TSS 37 |
| 38 | SITC of choke for 36 watt,18 watt tube light fixture as per TSS 38 |
| 39 | SITC ofstarter for 36 watt, 18 watt tube lightfixture as per TSS 39 |
| 40 | SITC of 1.1 kV grade, FRLS insulated 1.5 sq. mm copper wire as per TSS 40 |
| 41 | SITC of 1.1 kV grade ,FRLS insulated 2.5 sq. mm copper wire as per TSS 41 |
| 42 | Supply and installation of (6 Amp switch-1No. 6Ampsocket- 1No.) on 6 modulecover plate with frame for6 moduleswitch boxes withas per TSS 42 |
| 43 | Supply and installation of cover plate with frame for8 moduleconcealed switch boxes as per TSS 43 |
| 44 | Supply and installation of cover plate with frame for 18 moduleconcealed switch boxes as per TSS 44 |
| 45 | SITC of rigid PVC trunking of size (25 mm x 16 mm) with supply of all mounting accessoriesas per TSS 45 |
| 46 | Only installation of copper strip, wire etc. with supply of accessoriesas per TSS 46 |
| 47 | Only installation of1.5 sq. mm to 4 sq mm FRLS,PVC insulated copper wires as per TSS 47 |
| 48 | Endtermination of 3.5 corepowercable up to 95 mm outer diameteras per TSS 48 |
| 49 | Supply and installation of High Speed Dieselfor DG set as per TSS 49 |
| 50 | Proper laying of loosely laid wire, cables, casing cappingwith supply of accessories as per TSS 50 |
| 51 | SITC of 230 volt, 63 Amp, 30 mA,2 Pole RCCB as per TSS 51 |
| 52 | Supply and installation ofhandle for MCCB,SFU with ROHM mechanism as per TSS 52 |
| 53 | SITC of 415volt, 32 Amp to 63 Amp 4pole MCB as per TSS 53 |
| 54 | SITC of 250 volt,6 Amp to 20 Amp,10kA, SPMCB as per TSS 54 |
| 55 | SITC of 230 volt, 20Amp metal clad socket with top for A.C unit as per TSS 55 |
| 56 | SITC of415 volt,32 Amp to 63 AmpHRC fuse link as per TSS 56 |
| 57 | SITC of415 volt,100 Amp to 160 AmpHRC fuse link as per TSS 57 |
| 58 | SITC of415 volt, 200 Amp to 400 AmpHRC fuse link as per TSS 58 |
| 59 | SITC of6 Amp1 modular SPswitch as per TSS 59 |
| 60 | SITC of 20 Amp 1 modular SP switch as per TSS 60 |
| 61 | SITC of 6/16 Amp combined 2 Modulesocket as per TSS 61 |
| 62 | SITC of 120 watt 2 modularstep fan regulators as per TSS 62 |
| 63 | SITC of 6 module cover plates with frames as per TSS 63 |
| 64 | Only installation of various accessories of outdoor 33kVswitch yard as per TSS 64 |
| 65 | Maintenance of VFD drive control panel includingVFD for 20 HP motors ( 4 times x 1no.=4nos.) as per TSS 65 |
| 66 | SITC oftimer for Star deltastartersas per TSS 66 |
| 67 | SITC of AC3 duty power contactor with add on accessories for DOL starters for 3phase LT motor of 3HP to 7.5 HP motor as per TSS 67 |
| 68 | SITC of AC3 duty power contactor with add on accessories for star delta starters for LT motor of10HP to 20 HP motor as per TSS 68 |
| 69 | SITC of AC3 duty power contactor with add on accessories forstar delta starters for LT motor of 40HP to 60 HP motor as per TSS 69 |
| 70 | SITC of over load relay for motor starter of various sizes from 4Amp to 25Amp as per TSS 70 |
| 71 | SITC of over load relay for motor starter of various sizes from 25Amp to 80 Amp as per TSS 71 |
| 72 | Supply and installation spray painting for metallic surface as per TSS 72 |
| 73 | Supply and installationpainting with brush for metallic surface as per TSS 73 |
| 74 | Supplyand installation of LT panel\"s door locks, hinge, key with required rectificationas per TSS 74 |
| 75 | SITC of analogy voltmeter and ammeter with required accessories as per TSS 75 |
| 76 | SITC of 230 volt 300 mm sweep industrial exhaust fans with louvers as per TSS 76 |
| 77 | SITC of 230 volt 450 mmsweep industrial exhaustfan as per TSS 77 |
| 78 | Supply and installation of 5 mm thick polycarbonate / PVC sheet with accessories for fixing the modular cover plates as per TSS 78 |
| 79 | Supply and installation of blanking plates 1 module for Legrand DB as per TSS 79 |
| 80 | SITC of LED, 40 watt indoor battentype lighting fixtures as per TSS 80 |
| 81 | SITC of LED, 20 watt indoor battentype lighting fixtures as per TSS 81 |
| 82 | SITC ofLED, 36 watts, 2 ft x 2 ftindoor lighting fixtures for surface and recess mountingas per TSS 82 |
| 83 | SITC of 18 watt, LEDtube light (single side connection)suitable for installation of existing T8, 4 ftlong lamp luminaire with G-13 lamp holder to give glare free light as per TSS 83 |
| 84 | SITC of 250 watt, LED out door floodlight fixtureswith terminal boxes and mounting accessories as per TSS 84 |
| 85 | SITCof230 volt, 1200 mm sweep, BLDC ceiling fan with step regulatorsas per TSS 85 |
| 86 | Supply, installation, testing and commissioning of 1.1 kV grade, 3 core,2.5 sq.mm copper ,PVC insulated ,PVCouter sheath flexible cable as per TSS 86 |
| 87 | Supply and installationofM.S item fabricated out ofangle ,channel, sheet metal platesetc.as per TSS 87 |
| 88 | Supply and installation of 14 SWG tinned copper earth wire as per TSS 88 |
| 89 | Comprehensive maintenance ofbattery chargerat sub station.( 4 times x 1set= 4 Sets)as per TSS 89 |
| 90 | Maintenance of VRLA battery bankswith C-10 test(2 Times x 6 sets =12 Sets) as per TSS 90 |
| 91 | Comprehensive maintenance of PublicAddressSystem (1 set x 4 times=4 Sets) as per TSS 91 |
| 92 | Comprehensive maintenance of addressable fire alarm system with VESDA system (1 set x 4 times=4 Sets) as per TSS 92 |